EP2933088 - MOLD FOR VESSEL WITH HANDLE, METHOD FOR PRODUCING VESSEL WITH HANDLE, AND VESSEL WITH HANDLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.09.2021 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 09.10.2020 | ||
Former | Grant of patent is intended Status updated on 25.05.2020 | ||
Former | Examination is in progress Status updated on 13.10.2017 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states NISSEI ASB MACHINE CO., LTD. 4586-3 Koo Komoro-shi, Nagano 384-8585 / JP | [2020/46] |
Former [2015/43] | For all designated states Nissei Asb Machine Co., Ltd. 4586-3 Koo Komoro-shi, Nagano 384-8585 / JP | Inventor(s) | 01 /
OGIHARA, Shuichi c/o NISSEI ASB MACHINE CO., LTD. 4586-3 Koo Komoro-shi Nagano 384-8585 / JP | 02 /
YOKOBAYASHI, Kazuyuki c/o NISSEI ASB MACHINE CO., LTD. 4586-3 Koo Komoro-shi Nagano 384-8585 / JP | 03 /
USAMI, Masayuki c/o NISSEI ASB MACHINE CO., LTD. 4586-3 Koo Komoro-shi Nagano 384-8585 / JP | [2015/43] | Representative(s) | Mewburn Ellis LLP Aurora Building Counterslip Bristol BS1 6BX / GB | [2020/46] |
Former [2015/43] | Calderbank, Thomas Roger, et al Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | Application number, filing date | 13862372.3 | 11.12.2013 | [2015/43] | WO2013JP83258 | Priority number, date | JP20120273516 | 14.12.2012 Original published format: JP 2012273516 | [2015/43] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014092135 | Date: | 19.06.2014 | Language: | JA | [2014/25] | Type: | A1 Application with search report | No.: | EP2933088 | Date: | 21.10.2015 | Language: | EN | [2015/43] | Type: | B1 Patent specification | No.: | EP2933088 | Date: | 11.11.2020 | Language: | EN | [2020/46] | Search report(s) | International search report - published on: | JP | 19.06.2014 | (Supplementary) European search report - dispatched on: | EP | 23.08.2016 | Classification | IPC: | B29C49/48, B29C49/20, B65D1/00, B65D23/10, B29L22/00, // B29K105/00, B29K67/00, B29C49/06, B29L31/00, B65D1/02, B65D1/48 | [2016/38] | CPC: |
B29C49/20 (EP,US);
B29C49/48 (EP,US);
B65D1/0223 (EP,US);
B65D1/48 (EP,US);
B65D23/104 (US);
B65D23/106 (EP,US);
B29C2049/2017 (EP,US);
B29C2049/2039 (EP,US);
B29C2049/2069 (EP,US);
B29C2049/4807 (EP,US);
B29C2049/481 (EP,US);
B29C2949/0715 (EP);
B29C49/06 (EP,US);
B29K2067/00 (US);
B29K2105/258 (US);
|
Former IPC [2015/43] | B29C49/48, B29C49/20, B65D1/00, B65D23/10, B29L22/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FORM FÜR GEFÄSS MIT GRIFF, VERFAHREN ZUR HERSTELLUNG EINES GEFÄSSES MIT GRIFF UND GEFÄSS MIT GRIFF | [2015/43] | English: | MOLD FOR VESSEL WITH HANDLE, METHOD FOR PRODUCING VESSEL WITH HANDLE, AND VESSEL WITH HANDLE | [2015/43] | French: | MOULE POUR RÉCIPIENT À POIGNÉE, PROCÉDÉ DE PRODUCTION DE RÉCIPIENT À POIGNÉE ET RÉCIPIENT À POIGNÉE | [2015/43] | Entry into regional phase | 12.06.2015 | Translation filed | 12.06.2015 | National basic fee paid | 12.06.2015 | Search fee paid | 12.06.2015 | Designation fee(s) paid | 12.06.2015 | Examination fee paid | Examination procedure | 12.06.2015 | Examination requested [2015/43] | 15.03.2017 | Amendment by applicant (claims and/or description) | 11.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2018 | Reply to a communication from the examining division | 26.05.2020 | Communication of intention to grant the patent | 24.09.2020 | Fee for grant paid | 24.09.2020 | Fee for publishing/printing paid | 24.09.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.10.2017 | Opposition(s) | 12.08.2021 | No opposition filed within time limit [2021/42] | Fees paid | Renewal fee | 22.12.2015 | Renewal fee patent year 03 | 23.12.2016 | Renewal fee patent year 04 | 21.12.2017 | Renewal fee patent year 05 | 21.12.2018 | Renewal fee patent year 06 | 11.12.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.12.2013 | AL | 11.11.2020 | AT | 11.11.2020 | CY | 11.11.2020 | CZ | 11.11.2020 | DK | 11.11.2020 | EE | 11.11.2020 | ES | 11.11.2020 | FI | 11.11.2020 | HR | 11.11.2020 | IT | 11.11.2020 | LT | 11.11.2020 | LV | 11.11.2020 | MC | 11.11.2020 | MK | 11.11.2020 | MT | 11.11.2020 | NL | 11.11.2020 | PL | 11.11.2020 | RO | 11.11.2020 | RS | 11.11.2020 | SE | 11.11.2020 | SI | 11.11.2020 | SK | 11.11.2020 | SM | 11.11.2020 | TR | 11.11.2020 | IE | 11.12.2020 | LU | 11.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | BG | 11.02.2021 | NO | 11.02.2021 | GR | 12.02.2021 | IS | 11.03.2021 | PT | 11.03.2021 | [2022/34] |
Former [2022/32] | HU | 11.12.2013 | |
AL | 11.11.2020 | ||
AT | 11.11.2020 | ||
CY | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
MK | 11.11.2020 | ||
MT | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
TR | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/27] | HU | 11.12.2013 | |
AL | 11.11.2020 | ||
AT | 11.11.2020 | ||
CY | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
MT | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
TR | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/26] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
TR | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/23] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/10] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
PT | 11.03.2021 | ||
Former [2021/52] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/51] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
ES | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/50] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/48] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
IT | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/47] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
LU | 11.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/46] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 11.12.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/45] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/40] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/37] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/36] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/35] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/34] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/33] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/32] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/28] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/25] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/24] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
LV | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
BG | 11.02.2021 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
PT | 11.03.2021 | ||
Former [2021/23] | FI | 11.11.2020 | |
LV | 11.11.2020 | ||
RS | 11.11.2020 | ||
SE | 11.11.2020 | ||
NO | 11.02.2021 | ||
GR | 12.02.2021 | ||
PT | 11.03.2021 | ||
Former [2021/22] | FI | 11.11.2020 | |
RS | 11.11.2020 | ||
NO | 11.02.2021 | ||
PT | 11.03.2021 | ||
Former [2021/21] | FI | 11.11.2020 | |
PT | 11.03.2021 | ||
Former [2021/20] | FI | 11.11.2020 | Documents cited: | Search | [A]JP2003311817 (FTS KK) [A] 1-5* abstract *; | [A]JP2006103003 (AOKI TECHNICAL LAB INC) [A] 1-5 * abstract *; | [X]JP2011011479 (TOYO SEIKAN KAISHA LTD) [X] 1,3-5 * paragraphs [0023] - [0025]; figures 1-6; claim 1 *; | [XA]JP2011246200 (YOSHINO KOGYOSHO CO LTD) [X] 5 * abstract * [A] 1-4 | International search | [X]JP2005153919 (SUGI PLASTIC INDUSTRY CO LTD); | [X]JP2011011479 (TOYO SEIKAN KAISHA LTD); | [X]JP2011246200 (YOSHINO KOGYOSHO CO LTD) | Examination | US6444158 | by applicant | JP2008179400 | JP2011189993 |