EP2940741 - REVERSELY-INSTALLED PHOTONIC CRYSTAL LED CHIP AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.09.2018 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 29.09.2017 | ||
Former | Grant of patent is intended Status updated on 01.06.2017 | ||
Former | Examination is in progress Status updated on 11.02.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Enraytek Optoelectronics Co., Ltd. 1889 Hongyin Road Lingang Industry Park Pudong New Area Shanghai Shanghai 201306 / CN | [2015/45] | Inventor(s) | 01 /
WU, Leke 1889 Hongyin Road Lingang Industry Park Pudong New Area Shanghai 201306 / CN | [2015/45] | Representative(s) | Patentship Patentanwaltsgesellschaft mbH Paul-Gerhardt-Allee 50 81245 München / DE | [N/P] |
Former [2017/44] | Patentship Patentanwaltsgesellschaft mbH Elsenheimerstraße 65 80687 München / DE | ||
Former [2015/45] | Klinski, Robert Patentship Patentanwaltsgesellschaft mbH Elsenheimerstraße 65 80687 München / DE | Application number, filing date | 13868123.4 | 26.12.2013 | [2015/45] | WO2013CN90572 | Priority number, date | CN201210588034 | 29.12.2012 Original published format: CN201210588034 | [2015/45] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014101798 | Date: | 03.07.2014 | Language: | ZH | [2014/27] | Type: | A1 Application with search report | No.: | EP2940741 | Date: | 04.11.2015 | Language: | EN | [2015/45] | Type: | B1 Patent specification | No.: | EP2940741 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Search report(s) | International search report - published on: | CN | 03.07.2014 | (Supplementary) European search report - dispatched on: | EP | 18.11.2015 | Classification | IPC: | H01L33/20, H01L33/22, H01L33/00, H01L33/06 | [2017/20] | CPC: |
H01L33/20 (EP,US);
H01L33/0025 (US);
H01L33/007 (US);
H01L33/0095 (EP,US);
H01L33/06 (US);
H01L33/10 (US);
H01L33/22 (US);
H01L33/32 (US);
H01L33/64 (US);
|
Former IPC [2015/51] | H01L33/20, H01L33/22 | ||
Former IPC [2015/45] | H01L33/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | UMGEKEHRT INSTALLIERTER FOTONISCHER KRISTALL-LED-CHIP UND VERFAHREN ZUR HERSTELLUNG DAVON | [2015/45] | English: | REVERSELY-INSTALLED PHOTONIC CRYSTAL LED CHIP AND METHOD FOR MANUFACTURING SAME | [2015/45] | French: | PUCE DE DEL RENVERSÉE À CRISTAL PHOTONIQUE ET PROCÉDÉ DE FABRICATION DE CELLE-CI | [2015/45] | Entry into regional phase | 20.07.2015 | Translation filed | 20.07.2015 | National basic fee paid | 20.07.2015 | Search fee paid | 20.07.2015 | Designation fee(s) paid | 20.07.2015 | Examination fee paid | Examination procedure | 20.07.2015 | Examination requested [2015/45] | 31.05.2016 | Amendment by applicant (claims and/or description) | 12.10.2016 | Despatch of a communication from the examining division (Time limit: M04) | 10.02.2017 | Reply to a communication from the examining division | 02.06.2017 | Communication of intention to grant the patent | 15.09.2017 | Fee for grant paid | 15.09.2017 | Fee for publishing/printing paid | 15.09.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.10.2016 | Opposition(s) | 02.08.2018 | No opposition filed within time limit [2018/41] | Fees paid | Renewal fee | 31.12.2015 | Renewal fee patent year 03 | 23.12.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.12.2013 | AL | 01.11.2017 | AT | 01.11.2017 | CY | 01.11.2017 | CZ | 01.11.2017 | DK | 01.11.2017 | EE | 01.11.2017 | ES | 01.11.2017 | FI | 01.11.2017 | HR | 01.11.2017 | IT | 01.11.2017 | LT | 01.11.2017 | LV | 01.11.2017 | MC | 01.11.2017 | MK | 01.11.2017 | NL | 01.11.2017 | PL | 01.11.2017 | PT | 01.11.2017 | RO | 01.11.2017 | RS | 01.11.2017 | SE | 01.11.2017 | SI | 01.11.2017 | SK | 01.11.2017 | SM | 01.11.2017 | TR | 01.11.2017 | IE | 26.12.2017 | LU | 26.12.2017 | MT | 26.12.2017 | BE | 31.12.2017 | CH | 31.12.2017 | LI | 31.12.2017 | FR | 02.01.2018 | BG | 01.02.2018 | NO | 01.02.2018 | GR | 02.02.2018 | IS | 01.03.2018 | [2020/34] |
Former [2020/28] | HU | 26.12.2013 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
MK | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
PT | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
TR | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2020/16] | HU | 26.12.2013 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
MK | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
TR | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2019/52] | HU | 26.12.2013 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
MK | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2019/31] | HU | 26.12.2013 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2019/30] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/52] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
CH | 31.12.2017 | ||
LI | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/49] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BE | 31.12.2017 | ||
FR | 02.01.2018 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/45] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
IE | 26.12.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/43] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
LU | 26.12.2017 | ||
MT | 26.12.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/40] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/39] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/37] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/35] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
CZ | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/24] | AT | 01.11.2017 | |
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/22] | ES | 01.11.2017 | |
FI | 01.11.2017 | ||
LT | 01.11.2017 | ||
NL | 01.11.2017 | ||
NO | 01.02.2018 | Documents cited: | Search | [XI]US2005221521 (LEE JAE H [KR], et al) [X] 1,3,8,9,11,15 * paragraphs [0003] , [0012] , [0016] - [0022] - [0035] , [0044]; figures 6,7h; claims 1-13 * [I] 2,4-7,10,12-14; | [XA]CN1983649 (UNIV BEIJING [CN]) [X] 1,11 * the whole document * [A] 2-10,12-15; | [E]CN103066178B (ENRAYTEK OPTOELECTRONICS CO) [E] 1-15* the whole document * | International search | [X]CN1983649 (UNIV BEIJING [CN]); | [A]CN102544266 (GUOHONG YU); | [XP]CN103066178 (ENRAYTEK OPTOELECTRONICS CO) | Examination | EP1710624 | EP1734592 |