EP2946499 - DETERMINING SIGNAL TRANSMISSION BANDWIDTH [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2019 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 03.08.2018 | ||
Former | Grant of patent is intended Status updated on 27.06.2018 | ||
Former | Examination is in progress Status updated on 19.12.2016 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2018/36] |
Former [2015/48] | For all designated states Telefonaktiebolaget L M Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
SIOMINA, Iana Mäster Simons Väg 20 D41 S-170 66 Solna / SE | 02 /
KAZMI, Muhammad Svartviksslingan 110 S-167 39 Bromma / SE | 03 /
LINDOFF, Bengt Öresundsvägen 5 S-237 35 Bjärred / SE | [2015/48] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [N/P] |
Former [2018/36] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | ||
Former [2015/48] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 13872172.5 | 28.10.2013 | [2015/48] | WO2013SE51255 | Priority number, date | US201361753511P | 17.01.2013 Original published format: US 201361753511 P | [2015/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014112916 | Date: | 24.07.2014 | Language: | EN | [2014/30] | Type: | A1 Application with search report | No.: | EP2946499 | Date: | 25.11.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.07.2014 takes the place of the publication of the European patent application. | [2015/48] | Type: | B1 Patent specification | No.: | EP2946499 | Date: | 05.09.2018 | Language: | EN | [2018/36] | Search report(s) | International search report - published on: | SE | 24.07.2014 | (Supplementary) European search report - dispatched on: | EP | 19.08.2016 | Classification | IPC: | H04J11/00, H04L27/26, H04W24/02, H04W48/16 | [2015/48] | CPC: |
A61K38/39 (EP,US);
H04L5/0032 (US);
H04J11/0056 (US);
H04J11/0079 (EP,US);
H04L27/2659 (US);
H04L5/0007 (US);
H04L5/005 (US);
H04L5/0051 (US);
H04W72/542 (US);
H04J2011/0096 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BESTIMMUNG EINER SIGNALÜBERTRAGUNGSBANDBREITE | [2015/48] | English: | DETERMINING SIGNAL TRANSMISSION BANDWIDTH | [2015/48] | French: | DÉTERMINATION DE LA BANDE PASSANTE DE TRANSMISSION DE SIGNAL | [2015/48] | Entry into regional phase | 10.08.2015 | National basic fee paid | 10.08.2015 | Search fee paid | 10.08.2015 | Designation fee(s) paid | 10.08.2015 | Examination fee paid | Examination procedure | 10.08.2015 | Amendment by applicant (claims and/or description) | 10.08.2015 | Examination requested [2015/48] | 29.08.2016 | Despatch of a communication from the examining division (Time limit: M06) | 22.02.2017 | Reply to a communication from the examining division | 28.06.2018 | Communication of intention to grant the patent | 26.07.2018 | Fee for grant paid | 26.07.2018 | Fee for publishing/printing paid | 26.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.08.2016 | Opposition(s) | 06.06.2019 | No opposition filed within time limit [2019/33] | Fees paid | Renewal fee | 27.10.2015 | Renewal fee patent year 03 | 27.10.2016 | Renewal fee patent year 04 | 27.10.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.10.2013 | AL | 05.09.2018 | AT | 05.09.2018 | CY | 05.09.2018 | CZ | 05.09.2018 | DK | 05.09.2018 | EE | 05.09.2018 | ES | 05.09.2018 | FI | 05.09.2018 | HR | 05.09.2018 | IT | 05.09.2018 | LT | 05.09.2018 | LV | 05.09.2018 | MC | 05.09.2018 | MK | 05.09.2018 | PL | 05.09.2018 | RO | 05.09.2018 | RS | 05.09.2018 | SE | 05.09.2018 | SI | 05.09.2018 | SK | 05.09.2018 | SM | 05.09.2018 | TR | 05.09.2018 | IE | 28.10.2018 | LU | 28.10.2018 | MT | 28.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | FR | 05.11.2018 | BG | 05.12.2018 | NO | 05.12.2018 | GR | 06.12.2018 | IS | 05.01.2019 | PT | 05.01.2019 | [2020/31] |
Former [2020/17] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
MT | 28.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 05.11.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2020/08] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
MT | 28.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 05.11.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/49] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 05.11.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/48] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/40] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/38] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BE | 31.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/37] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/34] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/33] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/30] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
LU | 28.10.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/26] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/23] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/22] | AL | 05.09.2018 | |
CZ | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/21] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
IT | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/12] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/11] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/10] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
RS | 05.09.2018 | ||
SE | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/08] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
NO | 05.12.2018 | ||
Former [2019/07] | LT | 05.09.2018 | Documents cited: | Search | [XI]EP2020770 (PANASONIC CORP [JP]) [X] 1-7,13-15 * paragraphs [0021] , [0032] , [0050] - [0052] - [0062] , [0069] - [0072]; figure 4 *[I] 8-12; | [XI]WO2010093028 (NEC CORP [JP], et al) [X] 1-7,13-15 * abstract * * page 4, lines 12-14; figure 4 * * pages 7-9; figure 5 * [I] 8-12 | International search | [A]JP2007060116 (MATSUSHITA ELECTRIC IND CO LTD); | [A]US2007140106 (TSAI YINGMING [US], et al); | [A]EP1860785 (QUALCOMM INC [US]); | [X]EP2020770 (PANASONIC CORP [JP]); | [A]EP2207369 (NTT DOCOMO INC [JP]); | [X]WO2010093028 (NEC CORP [JP], et al); | [A]US2012327797 (SIOMINA IANA [SE], et al) | by applicant | EP2020770 | WO2010093028 |