EP2948862 - TRACING WITH A WORKLOAD DISTRIBUTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.09.2020 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 27.09.2019 | ||
Former | Grant of patent is intended Status updated on 03.06.2019 | ||
Former | Examination is in progress Status updated on 20.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052 / US | [2017/25] |
Former [2015/49] | For all designated states Concurix Corporation 244 Market Street Kirkland, Washington 98033 / US | Inventor(s) | 01 /
KRAJEC, Russell S. 208 Newell Drive Loveland, Colorado 80538 / US | [2015/49] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2015/49] | Application number, filing date | 13872860.5 | 27.05.2013 | [2015/49] | WO2013US42788 | Priority number, date | US201313751012 | 25.01.2013 Original published format: US201313751012 | [2015/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014116294 | Date: | 31.07.2014 | Language: | EN | [2014/31] | Type: | A1 Application with search report | No.: | EP2948862 | Date: | 02.12.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.07.2014 takes the place of the publication of the European patent application. | [2015/49] | Type: | B1 Patent specification | No.: | EP2948862 | Date: | 30.10.2019 | Language: | EN | [2019/44] | Search report(s) | International search report - published on: | KR | 31.07.2014 | (Supplementary) European search report - dispatched on: | EP | 23.08.2016 | Classification | IPC: | G06F9/50, G06F11/30, G06F11/34, G06F11/36, H04L29/08, H04L12/803 | [2016/38] | CPC: |
H04L47/125 (EP,US);
G06F11/3006 (EP,US);
G06F11/3466 (EP,US);
G06F11/3636 (EP,US);
G06F21/6245 (EP,US);
G06F9/505 (EP,US);
G06F9/5083 (EP,US);
H04L67/1001 (EP,US);
G06F11/3409 (EP,US);
G06F2201/865 (EP,US)
(-)
|
Former IPC [2015/49] | G06F15/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFOLGUNG MIT EINEM ARBEITSLASTVERTEILER | [2015/49] | English: | TRACING WITH A WORKLOAD DISTRIBUTOR | [2015/49] | French: | PISTAGE AVEC RÉPARTITEUR DE CHARGE DE TRAVAIL | [2015/49] | Entry into regional phase | 24.07.2015 | National basic fee paid | 24.07.2015 | Search fee paid | 24.07.2015 | Designation fee(s) paid | 24.07.2015 | Examination fee paid | Examination procedure | 24.07.2015 | Examination requested [2015/49] | 09.02.2017 | Amendment by applicant (claims and/or description) | 23.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.11.2017 | Reply to a communication from the examining division | 01.04.2019 | Invitation to indicate the basis for amendments (Time limit: M01) | 25.04.2019 | Reply to an invitation to indicate the basis for amendments | 04.06.2019 | Communication of intention to grant the patent | 20.09.2019 | Fee for grant paid | 20.09.2019 | Fee for publishing/printing paid | 20.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.10.2017 | Opposition(s) | 31.07.2020 | No opposition filed within time limit [2020/41] | Fees paid | Renewal fee | 24.07.2015 | Renewal fee patent year 03 | 30.03.2016 | Renewal fee patent year 04 | 10.05.2017 | Renewal fee patent year 05 | 11.05.2018 | Renewal fee patent year 06 | 15.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.05.2013 | AL | 30.10.2019 | AT | 30.10.2019 | CY | 30.10.2019 | CZ | 30.10.2019 | DK | 30.10.2019 | EE | 30.10.2019 | ES | 30.10.2019 | FI | 30.10.2019 | HR | 30.10.2019 | IT | 30.10.2019 | LT | 30.10.2019 | LV | 30.10.2019 | MC | 30.10.2019 | MK | 30.10.2019 | MT | 30.10.2019 | NL | 30.10.2019 | PL | 30.10.2019 | RO | 30.10.2019 | RS | 30.10.2019 | SE | 30.10.2019 | SI | 30.10.2019 | SK | 30.10.2019 | SM | 30.10.2019 | TR | 30.10.2019 | BG | 30.01.2020 | NO | 30.01.2020 | GR | 31.01.2020 | IS | 29.02.2020 | PT | 02.03.2020 | IE | 27.05.2020 | LU | 27.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | [2022/32] |
Former [2022/27] | HU | 27.05.2013 | |
AL | 30.10.2019 | ||
AT | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
MT | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
TR | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
IE | 27.05.2020 | ||
LU | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2022/26] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
TR | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
IE | 27.05.2020 | ||
LU | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/24] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
IE | 27.05.2020 | ||
LU | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
IE | 27.05.2020 | ||
LU | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
LU | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/12] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/07] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/51] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/38] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/37] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/36] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/35] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/32] | AL | 30.10.2019 | |
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/25] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/24] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/23] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/22] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/21] | NO | 30.01.2020 | Documents cited: | Search | [IA]US5689636 (KLEBER ULRICH [DE], et al) [I] 1,17 * abstract * * column 1, line 30 - line 48 * * column 4, line 35 - line 56 * * claim 1 *[A] 2-16; | [I]WO2012106571 (OPNET TECHNOLOGIES INC [US]) [I] 1-17 * abstract * * paragraph [0014] * * paragraph [0031] - paragraph [0036] * * claim 1 * * paragraph [0017] * | International search | [A]US2003217155 (GRECK BERTRAM [US], et al); | [A]US2006047752 (HORNBY DEREK [US]); | [A]US2008005281 (HSUEH WALTER C [US], et al); | [A]US2010205583 (GEBHARDT BORIS [DE], et al) | by applicant | WO2012106571 |