EP2962424 - SYSTEM AND METHOD FOR RAPID LINK FAILURE HANDLING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 18.10.2020 | ||
Former | Examination is in progress Status updated on 30.11.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Dell Products L.P. One Dell Way Round Rock, TX 78682-2244 / US | [2016/01] | Inventor(s) | 01 /
RAJAGOPALAN, Balaji 1074 Darrington Court Sunnyvale, California 94087 / US | 02 /
VELAYUDHAN, Mukesh Moopath 170 Mohave Terrace Fremont, California 94539 / US | 03 /
KRISHNAMOORTHY, Ramkumar 20106 Peach Tree Lane Cupertino, California 95014 / US | 04 /
GANAPATHIRAMAN, Narasimhan 4420 Albany Drive Apt. 79 San Jose, California 95129 / US | 05 /
KOTHARI, Sapna 371 N 1st Street 2 Campbell, California 95008 / US | 06 /
VENKATAPATHY, Nirupa 34/71 NGO Colony Near Chandran Gardens Chinna Thirupathi (PO) Salem Tamilnadu 636008 / IN | 07 /
AGRAWAL, Sanjeev 423 Casa View Drive San Jose, California 95129 / US | [2016/01] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2021/10] |
Former [2016/01] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 13876430.3 | 05.09.2013 | [2016/01] | WO2013US58213 | Priority number, date | US201313781445 | 28.02.2013 Original published format: US201313781445 | [2016/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014133586 | Date: | 04.09.2014 | Language: | EN | [2014/36] | Type: | A2 Application without search report | No.: | EP2962424 | Date: | 06.01.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.09.2014 takes the place of the publication of the European patent application. | [2016/01] | Type: | B1 Patent specification | No.: | EP2962424 | Date: | 10.03.2021 | Language: | EN | [2021/10] | Search report(s) | International search report - published on: | US | 23.07.2015 | (Supplementary) European search report - dispatched on: | EP | 02.09.2016 | Classification | IPC: | H04L12/24, H04L12/707, H04L12/709, H04L12/703, // H04L12/743 | [2016/40] | CPC: |
H04L45/22 (EP,US);
H04L45/245 (EP,US);
H04L45/28 (EP,US);
H04L45/7453 (EP,US);
Y02D30/50 (EP,US)
|
Former IPC [2016/01] | H04L12/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR SCHNELLEN VERBINDUNGSFEHLERHANDHABUNG | [2016/01] | English: | SYSTEM AND METHOD FOR RAPID LINK FAILURE HANDLING | [2016/01] | French: | SYSTÈME ET PROCÉDÉ DE GESTION RAPIDE D'UNE RUPTURE DE LIAISON | [2016/01] | Entry into regional phase | 27.08.2015 | National basic fee paid | 27.08.2015 | Search fee paid | 27.08.2015 | Designation fee(s) paid | 27.08.2015 | Examination fee paid | Examination procedure | 27.08.2015 | Examination requested [2016/01] | 20.03.2017 | Amendment by applicant (claims and/or description) | 29.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 18.01.2019 | Reply to a communication from the examining division | 19.10.2020 | Communication of intention to grant the patent | 27.01.2021 | Fee for grant paid | 27.01.2021 | Fee for publishing/printing paid | 27.01.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.11.2018 | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] | Fees paid | Renewal fee | 27.08.2015 | Renewal fee patent year 03 | 27.09.2016 | Renewal fee patent year 04 | 22.09.2017 | Renewal fee patent year 05 | 21.09.2018 | Renewal fee patent year 06 | 19.09.2019 | Renewal fee patent year 07 | 17.09.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.09.2013 | AL | 10.03.2021 | AT | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | DK | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | IT | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | MT | 10.03.2021 | NL | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SE | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | BG | 10.06.2021 | NO | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | IE | 05.09.2021 | LU | 05.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | FR | 30.09.2021 | LI | 30.09.2021 | [2024/41] |
Former [2024/22] | HU | 05.09.2013 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
MK | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 05.09.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | HU | 05.09.2013 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 05.09.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/29] | HU | 05.09.2013 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 05.09.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 05.09.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
IE | 05.09.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/34] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 05.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/25] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/23] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/13] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/10] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/08] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/07] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/52] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/51] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/50] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2021/48] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/46] | AT | 10.03.2021 | |
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/43] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/38] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/37] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/36] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/35] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
NO | 10.06.2021 | ||
Former [2021/33] | FI | 10.03.2021 | |
LT | 10.03.2021 | ||
NO | 10.06.2021 | Documents cited: | Search | [XI]EP2252014 (AVAYA INC [US]) [X] 1-7,9-15 * abstract * * paragraphs [0003] - [0009] * * paragraphs [0016] - [0041] * * paragraphs [0054] - [0061] * * figures 1-10,14 * [I] 8; | [XI]US2012307623 (ASSARPOUR HAMID [US]) [X] 1,2,5,6,8,10,11,14,15 * abstract * * figures 1,2 * * paragraphs [0003] - [0007] * * paragraphs [0018] - [0024] *[I] 3,4 | International search | [A]US2009207726 (THOMSON GRAEME [NZ], et al); | [A]US2010020680 (SALAM SAMER M [CA], et al); | [Y]US2010290472 (RAMAN PIRABHU [US], et al); | [Y]US2012033678 (PAGE GREGORY G [US], et al); | [Y]US8139492 (PETERSON ERIC L [US], et al); | [A]US2012099440 (DONG JIE [CN], et al); | [Y]US2012113835 (ALON ZEHAVIT [IL], et al); | [A]US2012195189 (WANG DAWEI [US], et al); | [Y]US2012275297 (SUBRAMANIAN KRISHNAMURTHY [US]) | by applicant | EP2252014 | US2012307623 |