EP2881838 - ADJUSTMENT METHOD AND BOOT METHOD FOR POWER-OFF THRESHOLD VOLTAGE AND ELECTRONIC DEVICE THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.07.2020 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 09.08.2019 | ||
Former | Grant of patent is intended Status updated on 26.03.2019 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Huawei Device Co., Ltd. B2-5 of Nanfang Factory No.2 of Xincheng Road Songshan Lake Science and Technology Industrial Zone Dongguan, Guangdong 523808 / CN | [2019/18] |
Former [2017/45] | For all designated states Huawei Device (Dongguan) Co., Ltd. B2-5 of Nanfang Factory No.2 of Xincheng Road Songshan Lake Science and Technology Industrial Zone Dongguan, Guangdong 523808 / CN | ||
Former [2015/24] | For all designated states Huawei Device Co., Ltd. Building B2 Huawei Industrial Base Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
WEI, Konggang Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
ZOU, Jie Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
XIONG, Qiang Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2015/24] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/37] |
Former [2015/24] | Haley, Stephen Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | Application number, filing date | 13883348.8 | 25.10.2013 | [2019/37] | WO2013CN85978 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015058410 | Date: | 30.04.2015 | Language: | ZH | [2015/17] | Type: | A1 Application with search report | No.: | EP2881838 | Date: | 10.06.2015 | Language: | EN | [2015/24] | Type: | B1 Patent specification | No.: | EP2881838 | Date: | 11.09.2019 | Language: | EN | [2019/37] | Search report(s) | International search report - published on: | CN | 30.04.2015 | (Supplementary) European search report - dispatched on: | EP | 08.03.2016 | Classification | IPC: | G06F1/32, G06F1/3212, H04W52/02 | [2019/09] | CPC: |
G06F1/3212 (EP,US);
G06F1/3296 (US);
G06F1/3287 (US);
H04W52/0264 (EP,US);
Y02D10/00 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2015/51] | G06F1/32, H04W52/02 | ||
Former IPC [2015/24] | G06F1/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR EINSTELLUNG EINER ABSCHALTUNGSSCHWELLENSPANNUNG, STARTVERFAHREN UND ELEKTRONISCHE VORRICHTUNGEN DAFÜR | [2015/24] | English: | ADJUSTMENT METHOD AND BOOT METHOD FOR POWER-OFF THRESHOLD VOLTAGE AND ELECTRONIC DEVICE THEREOF | [2015/24] | French: | PROCÉDÉ DE RÉGLAGE ET PROCÉDÉ D'AMORÇAGE POUR TENSION DE SEUIL DE MISE HORS TENSION, ET DISPOSITIF ÉLECTRONIQUE CORRESPONDANT | [2015/24] | Entry into regional phase | 04.11.2014 | Translation filed | 04.11.2014 | National basic fee paid | 04.11.2014 | Search fee paid | 04.11.2014 | Designation fee(s) paid | 04.11.2014 | Examination fee paid | Examination procedure | 04.11.2014 | Examination requested [2015/24] | 12.08.2016 | Amendment by applicant (claims and/or description) | 27.03.2019 | Communication of intention to grant the patent | 05.08.2019 | Fee for grant paid | 05.08.2019 | Fee for publishing/printing paid | 05.08.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.03.2019 | Opposition(s) | 15.06.2020 | No opposition filed within time limit [2020/34] | Fees paid | Renewal fee | 07.10.2015 | Renewal fee patent year 03 | 31.10.2016 | Renewal fee patent year 04 | 31.10.2017 | Renewal fee patent year 05 | 31.10.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.10.2013 | AL | 11.09.2019 | AT | 11.09.2019 | CY | 11.09.2019 | CZ | 11.09.2019 | DK | 11.09.2019 | EE | 11.09.2019 | ES | 11.09.2019 | FI | 11.09.2019 | HR | 11.09.2019 | IT | 11.09.2019 | LT | 11.09.2019 | LV | 11.09.2019 | MC | 11.09.2019 | MK | 11.09.2019 | MT | 11.09.2019 | PL | 11.09.2019 | RO | 11.09.2019 | RS | 11.09.2019 | SE | 11.09.2019 | SI | 11.09.2019 | SK | 11.09.2019 | SM | 11.09.2019 | TR | 11.09.2019 | IE | 25.10.2019 | LU | 25.10.2019 | BE | 31.10.2019 | CH | 31.10.2019 | LI | 31.10.2019 | BG | 11.12.2019 | NO | 11.12.2019 | GR | 12.12.2019 | IS | 12.01.2020 | PT | 13.01.2020 | [2022/31] |
Former [2022/27] | HU | 25.10.2013 | |
AL | 11.09.2019 | ||
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
MT | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
TR | 11.09.2019 | ||
IE | 25.10.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2021/34] | HU | 25.10.2013 | |
AL | 11.09.2019 | ||
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
MT | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
IE | 25.10.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2021/33] | HU | 25.10.2013 | |
AL | 11.09.2019 | ||
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
IE | 25.10.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2021/26] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
IE | 25.10.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/46] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
IE | 25.10.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/37] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
LU | 25.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/36] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
LU | 25.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/35] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
LU | 25.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
IT | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
PL | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/22] | AL | 11.09.2019 | |
EE | 11.09.2019 | ||
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/15] | AL | 11.09.2019 | |
ES | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/11] | ES | 11.09.2019 | |
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/10] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
Former [2020/09] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
NO | 11.12.2019 | ||
Former [2020/08] | LT | 11.09.2019 | |
NO | 11.12.2019 | Documents cited: | Search | [A]GB2446168 (THIRD SENSE LTD [GB]) [A] 1-7,11-17* the whole document *; | [A]WO2008101251 (QUALCOMM INC [US], et al) [A] 1-7,11-17 * paragraph [0007] - paragraph [0020] *; | [A]US2012210150 (DE LIND VAN WIJNGAARDEN ADRIAAN J [US], et al) [A] 1-7,11-17 * paragraph [0076] - paragraph [0087]; figure 3 *; | [A]US2013063097 (VALENTINE VAL [US]) [A] 1-7,11-17 * the whole document *; | [A]WO2013062578 (HEWLETT PACKARD DEVELOPMENT CO [US], et al) [A] 1-7,11-17 * paragraph [0013] - paragraph [0028] * | International search | [X]CN102299992 (BEIJING VIMICRO CORP.); | [A]CN102883058 (HUAWEI DEVICE CO LTD); | [A]CN102999137 (KUNDA COMP TECH KUNSHAN CO LTD, et al) |