EP3086457 - INVERTER CONTROL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.04.2023 Database last updated on 21.01.2025 | |
Former | The patent has been granted Status updated on 13.05.2022 | ||
Former | Grant of patent is intended Status updated on 13.02.2022 | ||
Former | Examination is in progress Status updated on 26.03.2021 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Toshiba Mitsubishi-Electric Industrial Systems Corporation 3-1-1, Kyobashi Chuo-ku Tokyo 104-0031 / JP | [2016/43] | Inventor(s) | 01 /
INZUNZA FIGUEROA, Ruben Alexis c/o TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION 3-1-1 Kyobashi Chuo-ku Tokyo 104-0031 / JP | 02 /
SUMIYA, Takeshi c/o TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION 3-1-1 Kyobashi Chuo-ku Tokyo 104-0031 / JP | 03 /
AMBO, Tatsuaki c/o TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION 3-1-1 Kyobashi Chuo-ku Tokyo 104-0031 / JP | [2016/43] | Representative(s) | Meissner Bolte Partnerschaft mbB Patentanwälte Rechtsanwälte Postfach 86 06 24 81633 München / DE | [N/P] |
Former [2016/43] | Zech, Stefan Markus, et al Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Postfach 86 06 24 81633 München / DE | Application number, filing date | 13899883.6 | 20.12.2013 | [2016/43] | WO2013JP84271 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015092918 | Date: | 25.06.2015 | Language: | JA | [2015/25] | Type: | A1 Application with search report | No.: | EP3086457 | Date: | 26.10.2016 | Language: | EN | [2016/43] | Type: | B1 Patent specification | No.: | EP3086457 | Date: | 15.06.2022 | Language: | EN | [2022/24] | Search report(s) | International search report - published on: | JP | 25.06.2015 | (Supplementary) European search report - dispatched on: | EP | 13.07.2017 | Classification | IPC: | H02M1/32, H02M1/12, H02M7/5387, // H02J3/38 | [2017/33] | CPC: |
H02J3/381 (EP,US);
H02M1/12 (US);
H02M1/126 (EP,US);
H02M1/14 (US);
H02M1/32 (EP,US);
H02M7/48 (US);
H02M7/537 (US);
H02M7/5387 (EP,US);
H02J2300/24 (EP,US);
|
Former IPC [2016/43] | H02M7/48 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | UMRICHTERSTEUERUNGSVORRICHTUNG | [2016/43] | English: | INVERTER CONTROL DEVICE | [2016/43] | French: | DISPOSITIF DE COMMANDE D'ONDULEUR | [2016/43] | Entry into regional phase | 20.07.2016 | Translation filed | 20.07.2016 | National basic fee paid | 20.07.2016 | Search fee paid | 20.07.2016 | Designation fee(s) paid | 20.07.2016 | Examination fee paid | Examination procedure | 20.07.2016 | Examination requested [2016/43] | 09.01.2018 | Amendment by applicant (claims and/or description) | 26.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 08.07.2021 | Reply to a communication from the examining division | 14.02.2022 | Communication of intention to grant the patent | 09.05.2022 | Fee for grant paid | 09.05.2022 | Fee for publishing/printing paid | 09.05.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.03.2021 | Opposition(s) | 16.03.2023 | No opposition filed within time limit [2023/21] | Fees paid | Renewal fee | 20.07.2016 | Renewal fee patent year 03 | 29.12.2016 | Renewal fee patent year 04 | 28.12.2017 | Renewal fee patent year 05 | 31.12.2018 | Renewal fee patent year 06 | 30.12.2019 | Renewal fee patent year 07 | 29.12.2020 | Renewal fee patent year 08 | 30.12.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.12.2013 | AL | 15.06.2022 | AT | 15.06.2022 | BG | 15.06.2022 | CY | 15.06.2022 | CZ | 15.06.2022 | DK | 15.06.2022 | EE | 15.06.2022 | FI | 15.06.2022 | HR | 15.06.2022 | IT | 15.06.2022 | LT | 15.06.2022 | LV | 15.06.2022 | MC | 15.06.2022 | MK | 15.06.2022 | MT | 15.06.2022 | NL | 15.06.2022 | PL | 15.06.2022 | RO | 15.06.2022 | RS | 15.06.2022 | SE | 15.06.2022 | SI | 15.06.2022 | SK | 15.06.2022 | SM | 15.06.2022 | TR | 15.06.2022 | NO | 15.09.2022 | GR | 16.09.2022 | IS | 15.10.2022 | PT | 17.10.2022 | IE | 20.12.2022 | LU | 20.12.2022 | CH | 31.12.2022 | FR | 31.12.2022 | LI | 31.12.2022 | [2024/51] |
Former [2024/41] | HU | 20.12.2013 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
MK | 15.06.2022 | ||
MT | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
TR | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/29] | HU | 20.12.2013 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
MK | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
TR | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 20.12.2013 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MK | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 20.12.2013 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 20.12.2013 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/11] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/52] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 20.12.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
LU | 20.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
LU | 20.12.2022 | ||
Former [2023/25] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/21] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/17] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/12] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/11] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/09] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/07] | AT | 15.06.2022 | |
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/02] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/50] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/49] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/47] | FI | 15.06.2022 | |
LT | 15.06.2022 | ||
SE | 15.06.2022 | ||
NO | 15.09.2022 | Documents cited: | Search | [A]US2013057236 (HSU CHE-WEI [TW], et al) [A] 1-6 * figures 1,4A,4B ** paragraphs [0019] - [0031] - [0034] *; | [I] - PAAL E ET AL, "Grid management functions built in PV inverters for distributed power generation", POWER ELECTRONICS AND ECCE ASIA (ICPE&ECCE), 2011 IEEE 8TH INTERNATIONAL CONFERENCE ON, IEEE, (20110530), doi:10.1109/ICPE.2011.5944749, ISBN 978-1-61284-958-4, pages 2637 - 2644, XP031956345 [I] 1-6 * abstract * * Section IV * DOI: http://dx.doi.org/10.1109/ICPE.2011.5944749 | International search | [A]JPH04248371 (TOSHIBA CORP); | [Y]JPH09294380 (HITACHI LTD); | [Y]JP2001309561 (MITSUBISHI ELECTRIC CORP, et al); | [Y]JP2003333753 (MITSUBISHI ELECTRIC CORP); | [Y]JP2005210823 (CANON KK) | by applicant | WO2012114467 | WO2012114468 | WO2012114469 |