| EP2759376 - Arrangement with clamping device for clamping a motor component with a bearing opening [Right-click to bookmark this link] | |||
| Former [2014/31] | Clamping device for clamping a motor component with a bearing opening | ||
| [2019/30] | Status | No opposition filed within time limit Status updated on 02.10.2020 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 25.10.2019 | ||
| Former | Grant of patent is intended Status updated on 05.08.2019 | ||
| Former | Examination is in progress Status updated on 09.11.2018 | ||
| Former | Request for examination was made Status updated on 05.10.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Alfing Kessler Sondermaschinen GmbH Auguste-Kessler-Strasse 20 73433 Aalen / DE | [2019/48] |
| Former [2014/31] | For all designated states Alfing Kessler Sondermaschinen GmbH Auguste-Kessler-Strasse 20 73433 Aalen / DE | Inventor(s) | 01 /
Straub, Ulrich Stiegelwiesenstraße 28 D-73079 Süßen / DE | 02 /
Müllner, Ralf Ernst-Kirchner-Straße 7 D-73760 Ostfildern / DE | [2014/31] | Representative(s) | Patentanwälte Bregenzer und Reule Partnerschaftsgesellschaft mbB Neckarstraße 47 73728 Esslingen / DE | [2019/48] |
| Former [2014/31] | Bregenzer, Michael Patentanwälte Magenbauer & Kollegen Plochinger Strasse 109 73730 Esslingen / DE | Application number, filing date | 14000246.0 | 24.01.2014 | [2014/31] | Priority number, date | DE20131001277 | 25.01.2013 Original published format: DE102013001277 | [2014/31] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2759376 | Date: | 30.07.2014 | Language: | DE | [2014/31] | Type: | A3 Search report | No.: | EP2759376 | Date: | 25.04.2018 | Language: | DE | [2018/17] | Type: | B1 Patent specification | No.: | EP2759376 | Date: | 27.11.2019 | Language: | DE | [2019/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.03.2018 | Classification | IPC: | B25B5/14, B25B5/08, B23B31/40, B44B5/00 | [2018/17] | CPC: |
B25B5/08 (EP);
B23B31/4006 (EP);
B23B31/4013 (EP);
B25B5/14 (EP);
B44B5/00 (EP)
|
| Former IPC [2014/31] | B25B5/14, B25B5/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/45] |
| Former [2014/31] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Anordnung mit Spannvorrichtung zum Spannen eines eine Lageröffnung aufweisenden Motorbauteils | [2019/30] | English: | Arrangement with clamping device for clamping a motor component with a bearing opening | [2019/30] | French: | Dispositif avec dispositif de serrage d'un composant moteur avec ouverture de palier | [2019/30] |
| Former [2014/31] | Spannvorrichtung zum Spannen eines eine Lageröffnung aufweisenden Motorbauteils | ||
| Former [2014/31] | Clamping device for clamping a motor component with a bearing opening | ||
| Former [2014/31] | Dispositif de serrage d'un composant moteur avec ouverture de palier | Examination procedure | 01.10.2018 | Amendment by applicant (claims and/or description) | 01.10.2018 | Examination requested [2018/45] | 12.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 08.05.2019 | Reply to a communication from the examining division | 29.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.05.2019 | Reply to a communication from the examining division | 06.08.2019 | Communication of intention to grant the patent | 18.10.2019 | Fee for grant paid | 18.10.2019 | Fee for publishing/printing paid | 18.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.11.2018 | Opposition(s) | 28.08.2020 | No opposition filed within time limit [2020/45] | Fees paid | Renewal fee | 02.01.2016 | Renewal fee patent year 03 | 01.12.2016 | Renewal fee patent year 04 | 20.11.2017 | Renewal fee patent year 05 | 27.11.2018 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.01.2014 | AL | 27.11.2019 | CY | 27.11.2019 | CZ | 27.11.2019 | DK | 27.11.2019 | EE | 27.11.2019 | ES | 27.11.2019 | FI | 27.11.2019 | HR | 27.11.2019 | IT | 27.11.2019 | LT | 27.11.2019 | LV | 27.11.2019 | MC | 27.11.2019 | MK | 27.11.2019 | MT | 27.11.2019 | NL | 27.11.2019 | PL | 27.11.2019 | RO | 27.11.2019 | RS | 27.11.2019 | SE | 27.11.2019 | SI | 27.11.2019 | SK | 27.11.2019 | SM | 27.11.2019 | TR | 27.11.2019 | AT | 24.01.2020 | IE | 24.01.2020 | LU | 24.01.2020 | FR | 27.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | BG | 27.02.2020 | GB | 27.02.2020 | NO | 27.02.2020 | GR | 28.02.2020 | IS | 27.03.2020 | PT | 19.04.2020 | DE | 01.08.2020 | [2022/32] |
| Former [2022/27] | HU | 24.01.2014 | |
| AL | 27.11.2019 | ||
| CY | 27.11.2019 | ||
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| IT | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| MT | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| PL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SI | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| TR | 27.11.2019 | ||
| AT | 24.01.2020 | ||
| IE | 24.01.2020 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BE | 31.01.2020 | ||
| CH | 31.01.2020 | ||
| LI | 31.01.2020 | ||
| BG | 27.02.2020 | ||
| GB | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2021/25] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| IT | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| PL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SI | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| AT | 24.01.2020 | ||
| IE | 24.01.2020 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BE | 31.01.2020 | ||
| CH | 31.01.2020 | ||
| LI | 31.01.2020 | ||
| BG | 27.02.2020 | ||
| GB | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2021/10] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| IT | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| PL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SI | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| IE | 24.01.2020 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BE | 31.01.2020 | ||
| CH | 31.01.2020 | ||
| LI | 31.01.2020 | ||
| BG | 27.02.2020 | ||
| GB | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2021/08] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| PL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SI | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| IE | 24.01.2020 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BE | 31.01.2020 | ||
| CH | 31.01.2020 | ||
| LI | 31.01.2020 | ||
| BG | 27.02.2020 | ||
| GB | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2020/51] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| PL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SI | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BE | 31.01.2020 | ||
| CH | 31.01.2020 | ||
| LI | 31.01.2020 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2020/48] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| LU | 24.01.2020 | ||
| FR | 27.01.2020 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| DE | 01.08.2020 | ||
| Former [2020/46] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| LU | 24.01.2020 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| Former [2020/39] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| MC | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| Former [2020/37] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| SK | 27.11.2019 | ||
| SM | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| Former [2020/36] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| DK | 27.11.2019 | ||
| EE | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| PT | 19.04.2020 | ||
| Former [2020/35] | AL | 27.11.2019 | |
| CZ | 27.11.2019 | ||
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RO | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| Former [2020/32] | AL | 27.11.2019 | |
| ES | 27.11.2019 | ||
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| Former [2020/26] | ES | 27.11.2019 | |
| FI | 27.11.2019 | ||
| HR | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| RS | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| Former [2020/24] | ES | 27.11.2019 | |
| FI | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| IS | 27.03.2020 | ||
| Former [2020/23] | ES | 27.11.2019 | |
| FI | 27.11.2019 | ||
| LT | 27.11.2019 | ||
| LV | 27.11.2019 | ||
| NL | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| GR | 28.02.2020 | ||
| Former [2020/22] | FI | 27.11.2019 | |
| LT | 27.11.2019 | ||
| SE | 27.11.2019 | ||
| BG | 27.02.2020 | ||
| NO | 27.02.2020 | ||
| Former [2020/21] | NO | 27.02.2020 | Documents cited: | Search | [XY] EP0925871 (KOSMEK KK et al.) [X] 1-4,6,9-15 * column 6, lines 31-39 * * paragraphs [0001] , [0032] , [0091]; figures 1A,2,12 *[Y] 5,7,8 | [X] DE2502561 (FOELL REMSWERK et al.) [X] 1-4,6,9-14 * page 1, lines 1-6 * * page 1, lines 20-24 * * page 2, lines 23-27 * * page 3, lines 17-22; figures 1,2 * | [YA] DE9204822 (GLUTH SONDERMASCHINEN, 8440 STRAUBING, DE) [Y] 5,7,8 * page 6, lines 18-20; figures 1,2; claim 1 *[A] 9 | [A] DE629036 (HEINZ HASEBRINK et al.) [A] 5,9 * page 1, lines 1-8 * * page 1, lines 38-41; figures 1,2 * | [A] DE102009037233 (AUDI AG et al.) [A] 9 * paragraphs [0001] , [0011] , [0012]; figures 1,2 * |