blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2786863

EP2786863 - Plastic sheathed steel tube [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.06.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  03.07.2020
FormerGrant of patent is intended
Status updated on  17.03.2020
FormerExamination is in progress
Status updated on  04.05.2018
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Mannesmann Line Pipe GmbH
In der Steinwiese 31
57074 Siegen / DE
[2018/12]
Former [2014/41]For all designated states
Salzgitter Mannesmann Line Pipe Gmbh
In der Steinwiese 31
57074 Siegen / DE
Inventor(s)01 / Winkels, Jörn
Scheidinger Str. 40
59457 Werl / DE
02 / Kocks, Hans-Jürgen
Friedenshortstraße 5
57258 Freudenberg / DE
 [2014/41]
Representative(s)Meissner, Peter E.
Meissner & Meissner
Patentanwaltsbüro
Hohenzollerndamm 89
14199 Berlin / DE
[2020/32]
Former [2014/41]Meissner, Peter E.
Meissner & Meissner Patentanwaltsbüro Hohenzollerndamm 89
14199 Berlin / DE
Application number, filing date14075018.318.03.2014
[2014/41]
Priority number, dateDE2013100620604.04.2013         Original published format: DE102013006206
[2014/41]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2786863
Date:08.10.2014
Language:DE
[2014/41]
Type: B1 Patent specification 
No.:EP2786863
Date:05.08.2020
Language:DE
[2020/32]
Search report(s)(Supplementary) European search report - dispatched on:EP26.06.2014
ClassificationIPC:F16L59/06, F16L59/14, F16L59/04, B32B5/18, B32B5/20, B32B15/04, B32B27/06, B32B15/18, B32B27/30, F16L9/147, F28F19/04, B32B27/36, B32B1/08
[2020/12]
CPC:
B32B1/08 (EP); B32B15/046 (EP); B32B15/18 (EP);
B32B27/065 (EP); B32B27/302 (EP); B32B27/308 (EP);
B32B27/365 (EP); B32B5/18 (EP); B32B5/20 (EP);
F16L59/06 (EP); F16L59/143 (EP); F16L9/147 (EP);
F28F19/04 (EP); B32B2266/025 (EP); B32B2266/0278 (EP);
B32B2597/00 (EP); F28F2265/26 (EP) (-)
Former IPC [2014/41]B32B5/18, B32B5/20, B32B15/04, B32B15/18, B32B27/06, B32B27/30, B32B27/36, B32B1/08, F16L9/147, E04H12/02, E04H12/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
Former [2014/41]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Kunststoffummanteltes Rohr aus Stahl[2014/41]
English:Plastic sheathed steel tube[2014/41]
French:Tube en acier avec gaine en matière synthétique[2014/41]
Examination procedure27.01.2015Examination requested  [2015/11]
12.03.2015Amendment by applicant (claims and/or description)
03.05.2018Despatch of a communication from the examining division (Time limit: M04)
14.06.2018Reply to a communication from the examining division
25.01.2019Despatch of a communication from the examining division (Time limit: M04)
16.05.2019Reply to a communication from the examining division
18.03.2020Communication of intention to grant the patent
23.06.2020Fee for grant paid
23.06.2020Fee for publishing/printing paid
23.06.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  03.05.2018
Opposition(s)07.05.2021No opposition filed within time limit [2021/28]
Fees paidRenewal fee
25.03.2016Renewal fee patent year 03
24.03.2017Renewal fee patent year 04
23.03.2018Renewal fee patent year 05
26.03.2019Renewal fee patent year 06
24.03.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.03.2014
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
MT05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT18.03.2021
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
[2024/41]
Former [2024/22]HU18.03.2014
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT18.03.2021
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/30]HU18.03.2014
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT18.03.2021
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/27]HU18.03.2014
AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT18.03.2021
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/36]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT18.03.2021
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/34]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
GB18.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/11]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
GB18.03.2021
IE18.03.2021
LU18.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/08]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
GB18.03.2021
IE18.03.2021
LU18.03.2021
FR31.03.2021
Former [2022/07]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE18.03.2021
Former [2021/45]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/36]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/34]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/28]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/25]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/23]CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/22]CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/20]DK05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/12]ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/10]ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/09]ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
PT07.12.2020
Former [2021/08]ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
PT07.12.2020
Former [2021/07]FI05.08.2020
LT05.08.2020
NO05.11.2020
Documents cited:Search[XYI]DE2636973  (LANGMATZ HANS) [X] 1-5 * page 5, line 2 - line 13; figure 1; claims 1,4 * * page 7, line 8 - page 9, line 24 * [Y] 1-5 [I] 6-10;
 [X]EP1260547  (BOREALIS TECH OY [FI]) [X] 1,4,5,10 * paragraphs [0035] , [0039] , [0040] , [0049] , [0054] *;
 [X]US2002182357  (SOLES DENNIS C [US], et al) [X] 1,4,5 * paragraphs [0012] , [0021] , [0022] , [0039] , [0040] , [0044] - [0046]; examples 33,34; claims 1,2,4,6,9,11,12,14,15,18,21 *;
 [Y]DE10238520  (TICONA GMBH [DE]) [Y] 1-5* paragraphs [0002] - [0010]; claims 1,4,6,10 *;
 [X]JP2006348976  (FURUKAWA ELECTRIC CO LTD) [X] 1,5 * abstract *;
 [E]DE102012016916  (SALZGITTER MANNESMANN LINE PIPE GMBH [DE]) [E] 1,4,9 * paragraphs [0010] - [0017]; figure 1; claim - *
by applicantDE3247512
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.