blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2759660

EP2759660 - Flange portion for a tower of a wind power system [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  08.12.2017
Database last updated on 03.09.2024
FormerRequest for examination was made
Status updated on  31.08.2017
Most recent event   Tooltip08.12.2017Application deemed to be withdrawnpublished on 10.01.2018  [2018/02]
Applicant(s)For all designated states
Siegthalerfabrik GmbH
Siegtalstraße 32-34
57080 Siegen / DE
[2014/31]
Inventor(s)01 / Wolf, Dietmar
Fortunastr. 6
57234 Wilnsdorf / DE
02 / Koop, Karsten
Friedrichstr. 8
18057 Rostock / DE
03 / Manteuffel, Christine
Am Hegehof 3
19069 Lübstorf / DE
 [2014/31]
Representative(s)Bendel, Christian
Kleinstraße 15
61194 Niddatal / DE
[N/P]
Former [2014/31]Bendel, Christian
European Patent Attorney
Hermann-Harry-Schmitz-Straße 22
40227 Düsseldorf / DE
Application number, filing date14150680.809.01.2014
[2014/31]
Priority number, dateDE20131020107223.01.2013         Original published format: DE102013201072
[2014/31]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2759660
Date:30.07.2014
Language:DE
[2014/31]
ClassificationIPC:E04H12/08
[2014/31]
CPC:
E04H12/085 (EP); E02B17/0004 (EP); E02B2017/0091 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/31]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Flanschteil für einen Turm einer Windkraftanlage[2014/31]
English:Flange portion for a tower of a wind power system[2014/31]
French:Pièce de bride pour une tour d'éolienne[2014/31]
Examination procedure09.01.2014Examination requested  [2014/31]
01.08.2017Application deemed to be withdrawn, date of legal effect  [2018/02]
31.08.2017Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2018/02]
Fees paidRenewal fee
01.02.2016Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.01.201704   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inby applicantUS8046902
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.