EP2772894 - Method and Apparatus for Automated Service Schedule Derivation and Updating [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.04.2023 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 20.05.2022 | ||
Former | Grant of patent is intended Status updated on 13.01.2022 | ||
Former | Examination is in progress Status updated on 25.05.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states HERE Global B.V. Kennedyplein 222 5611 ZT Eindhoven / NL | [2016/25] |
Former [2014/36] | For all designated states HERE Global B.V. De Run 1115 5503 LB Veldhoven / NL | Inventor(s) | 01 /
Modica, Leo 1502 McCormick Place Wheaton, IL Illinois 60189 / US | 02 /
Stenneth, Leon 1036 W Cullerton Ave Apt 2R Chicago, IL Illinois 60608 / US | [2014/36] | Representative(s) | Potter Clarkson Chapel Quarter Mount Street Nottingham NG1 6HQ / GB | [N/P] |
Former [2022/25] | Potter Clarkson The Belgrave Centre Talbot Street Nottingham NG1 5GG / GB | ||
Former [2014/36] | Nokia Corporation Intellectual Property Department Karakaari 7 02610 Espoo / FI | Application number, filing date | 14152592.3 | 27.01.2014 | [2014/36] | Priority number, date | US201313780901 | 28.02.2013 Original published format: US201313780901 | [2014/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2772894 | Date: | 03.09.2014 | Language: | EN | [2014/36] | Type: | B1 Patent specification | No.: | EP2772894 | Date: | 22.06.2022 | Language: | EN | [2022/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.07.2014 | Classification | IPC: | G08G1/123 | [2014/36] | CPC: |
G08G1/123 (EP,US);
G01C21/34 (US);
G01C21/3423 (US);
G01C21/3446 (US);
G01S19/42 (US);
G06Q10/06311 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/25] |
Former [2014/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren und Vorrichtung für automatisierte Wartungsplanungsableitung und -aktualisierung | [2014/36] | English: | Method and Apparatus for Automated Service Schedule Derivation and Updating | [2014/36] | French: | Procédé et appareil de dérivation et mise à jour de planification de service automatisée | [2014/36] | Examination procedure | 26.02.2015 | Amendment by applicant (claims and/or description) | 27.02.2015 | Examination requested [2015/15] | 28.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 26.11.2018 | Reply to a communication from the examining division | 08.06.2020 | Despatch of a communication from the examining division (Time limit: M06) | 10.11.2020 | Reply to a communication from the examining division | 09.12.2021 | Cancellation of oral proceeding that was planned for 10.12.2021 | 10.12.2021 | Date of oral proceedings (cancelled) | 14.01.2022 | Communication of intention to grant the patent | 11.05.2022 | Fee for grant paid | 11.05.2022 | Fee for publishing/printing paid | 11.05.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.05.2018 | Opposition(s) | 23.03.2023 | No opposition filed within time limit [2023/22] | Fees paid | Renewal fee | 11.01.2016 | Renewal fee patent year 03 | 11.01.2017 | Renewal fee patent year 04 | 15.01.2018 | Renewal fee patent year 05 | 15.01.2019 | Renewal fee patent year 06 | 14.01.2020 | Renewal fee patent year 07 | 13.01.2021 | Renewal fee patent year 08 | 17.12.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 22.06.2022 | AT | 22.06.2022 | CZ | 22.06.2022 | DK | 22.06.2022 | EE | 22.06.2022 | ES | 22.06.2022 | FI | 22.06.2022 | HR | 22.06.2022 | IT | 22.06.2022 | LT | 22.06.2022 | LV | 22.06.2022 | MC | 22.06.2022 | PL | 22.06.2022 | RO | 22.06.2022 | RS | 22.06.2022 | SE | 22.06.2022 | SI | 22.06.2022 | SK | 22.06.2022 | SM | 22.06.2022 | BG | 22.09.2022 | NO | 22.09.2022 | GR | 23.09.2022 | IS | 22.10.2022 | PT | 24.10.2022 | GB | 27.01.2023 | IE | 27.01.2023 | LU | 27.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | FR | 31.01.2023 | LI | 31.01.2023 | [2024/29] |
Former [2024/11] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
GB | 27.01.2023 | ||
IE | 27.01.2023 | ||
LU | 27.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/08] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
GB | 27.01.2023 | ||
IE | 27.01.2023 | ||
LU | 27.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/52] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
GB | 27.01.2023 | ||
LU | 27.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/49] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
GB | 27.01.2023 | ||
LU | 27.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
GB | 27.01.2023 | ||
LU | 27.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
LU | 27.01.2023 | ||
Former [2023/37] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/21] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/17] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/12] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/11] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/09] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/08] | AT | 22.06.2022 | |
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2023/07] | AT | 22.06.2022 | |
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/50] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/49] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/47] | FI | 22.06.2022 | |
LT | 22.06.2022 | ||
SE | 22.06.2022 | ||
NO | 22.09.2022 | Documents cited: | Search | [A]GB2178210 (LONDON BUSES LIMITED) [A] 1-15 * the whole document *; | [A]EP1796058 (FIAT RICERCHE [IT]) [A] 1-15* the whole document *; | [X]US2008054072 (KATRAGADDA LALITESH [US], et al) [X] 1-15 * paragraphs [0039] , [0040] , [0064] , [0065] , [0066] , [0067] , [0071] , [0076] , [0079] , [0096]; figures 2,3 *; | [X]US2012010803 (MIN WANLI [US], et al) [X] 1-15 * paragraphs [0027] , [0029] , [0030] , [0050]; figure 7b * | Examination | US2012066251 | - Raan Hee Jeong, "THE PREDICTION OF BUS ARRIVAL TIME USING AUTOMATIC VEHICLE LOCATION SYSTEMS DATA", Texas, (20041201), URL: https://core.ac.uk/download/pdf/4268915.pdf, (20200525), XP055698037 | - RANHEE JEONG ET AL, "Bus arrival time prediction using artificial neural network model", INTELLIGENT TRANSPORTATION SYSTEMS, 2004. PROCEEDINGS. THE 7TH INTERNA TIONAL IEEE CONFERENCE ON WASHINGTON, DC, USA OCT. 3-6, 2004, PISCATAWAY, NJ, USA,IEEE, (20041003), ISBN 978-0-7803-8500-9, pages 988 - 993, XP010772200 |