EP2763456 - Method of Handling Interference Measurement in TDD System and Related Communication Device [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.01.2020 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 25.01.2019 | ||
Former | Grant of patent is intended Status updated on 28.08.2018 | ||
Former | Examination is in progress Status updated on 20.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Acer Incorporated 8F, 88, Sec. 1, Hsin Tai Wu Road Xizhi District New Taipei City 221 / TW | [2014/32] | Inventor(s) | 01 /
Wei, Hung-Yu c/o ACER INCORPORATED 8F, 88, Sec. 1, Hsin Tai Wu Rd., Xizhi Dist. 221 New Taipei City / TW | [2014/32] | Representative(s) | Straus, Alexander, et al 2K Patent- und Rechtsanwälte Bajuwarenring 14 82041 Oberhaching / DE | [N/P] |
Former [2014/32] | Becker Kurig Straus Patentanwälte Bavariastrasse 7 80336 München / DE | Application number, filing date | 14152820.8 | 28.01.2014 | [2014/32] | Priority number, date | US201361760181P | 04.02.2013 Original published format: US 201361760181 P | US201414164277 | 27.01.2014 Original published format: US201414164277 | [2014/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2763456 | Date: | 06.08.2014 | Language: | EN | [2014/32] | Type: | B1 Patent specification | No.: | EP2763456 | Date: | 27.02.2019 | Language: | EN | [2019/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.03.2014 | Classification | IPC: | H04W24/10, // H04W24/02 | [2014/32] | CPC: |
H04W24/10 (EP,US);
H04W24/08 (US);
H04L5/22 (US);
H04W24/02 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/09] |
Former [2014/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Handhabung der Interferenzmessung in einem TDD-System und zugehörige Kommunikationsvorrichtung | [2014/32] | English: | Method of Handling Interference Measurement in TDD System and Related Communication Device | [2014/32] | French: | Procédé de gestion de la mesure d'interférence dans un système TDD et dispositif de communication associé | [2014/32] | Examination procedure | 22.12.2014 | Amendment by applicant (claims and/or description) | 22.12.2014 | Examination requested [2015/07] | 29.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 19.01.2017 | Reply to a communication from the examining division | 25.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 16.10.2017 | Reply to a communication from the examining division | 29.08.2018 | Communication of intention to grant the patent | 21.12.2018 | Fee for grant paid | 21.12.2018 | Fee for publishing/printing paid | 21.12.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.09.2016 | Opposition(s) | 28.11.2019 | No opposition filed within time limit [2020/06] | Fees paid | Renewal fee | 11.01.2016 | Renewal fee patent year 03 | 11.01.2017 | Renewal fee patent year 04 | 15.01.2018 | Renewal fee patent year 05 | 15.01.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.01.2014 | AL | 27.02.2019 | AT | 27.02.2019 | CY | 27.02.2019 | CZ | 27.02.2019 | DK | 27.02.2019 | EE | 27.02.2019 | ES | 27.02.2019 | FI | 27.02.2019 | HR | 27.02.2019 | IT | 27.02.2019 | LT | 27.02.2019 | LV | 27.02.2019 | MC | 27.02.2019 | MK | 27.02.2019 | MT | 27.02.2019 | NL | 27.02.2019 | PL | 27.02.2019 | RO | 27.02.2019 | RS | 27.02.2019 | SE | 27.02.2019 | SI | 27.02.2019 | SK | 27.02.2019 | SM | 27.02.2019 | TR | 27.02.2019 | BG | 27.05.2019 | NO | 27.05.2019 | GR | 28.05.2019 | IS | 27.06.2019 | PT | 27.06.2019 | [2022/32] |
Former [2022/27] | HU | 28.01.2014 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/39] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/17] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/13] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/03] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/52] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/49] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/48] | DK | 27.02.2019 | |
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/47] | ES | 27.02.2019 | |
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/46] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/39] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/38] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/37] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/34] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/33] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | Documents cited: | Search | [X]EP2221985 (SONY CORP [JP]) [X] 1-14 * paragraph [0041] * * paragraph [0056] - paragraph [0057]; figures 7a, 7b * * paragraph [0059]; figure 9 *; | [X]WO2012115811 (MOTOROLA MOBILITY LLC [US], et al) [X] 1,13,14 * page 2, line 4 - page 3, line 25 * * page 6, line 16 - page 7, line 2 * * page 18, line 1 - page 23, line 12; figures 8-9 ** page 23, line 25 - page 28, line l; figures 10a-11 *; | [X]US2012236736 (FRANK COLIN D [US], et al) [X] 1-14 * abstract * * paragraph [0018] * * paragraph [0041] - paragraph [0051]; figure 3 * * paragraph [0073]; figure 5 *; | [X] - ITRI, "Evaluation of eIMTA with dual CSI feedbacks", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130118), 3GPP DRAFT; R1-130148 EVALUATION OF EIMTA WITH DUAL CSI FEEDBACKS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRAN, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130118), XP050663332 [X] 1-14 * 1. Introduction; page 1 * * 2. Dual CSI Measurement Reports; page 1 * | [X] - CATT, "Interference mitigation schemes for TDD eIMTA", vol. RAN WG1, no. St. Julian; 20130128 - 20130201, (20130118), 3GPP DRAFT; R1-130049, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130118), XP050663295 [X] 1-14 * the whole document * | Examination | - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 11)", 3GPP STANDARD; 3GPP TS 36.213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20121220), vol. RAN WG1, no. V11.1.0, pages 1 - 160, XP050691223 |