EP2765709 - Apparatus and method for improved modulation and coding schemes for broadband satellite communications systems [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.07.2017 Database last updated on 13.11.2024 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Hughes Network Systems, LLC 11717 Exploration Lane Germantown, MD 20876 / US | [2014/33] | Inventor(s) | 01 /
Eroz, Mustafa 17007 Indian Grass Drive Germantown, MD 20874 / US | 02 /
Lee, Lin-Nan 10004 Flower Gate Terrace Potomac, MD 20854 / US | [2014/33] | Representative(s) | Körfer, Thomas Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | [N/P] |
Former [2014/33] | Körfer, Thomas Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | Application number, filing date | 14154487.4 | 10.02.2014 | [2014/33] | Priority number, date | US201313763723 | 10.02.2013 Original published format: US201313763723 | [2014/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2765709 | Date: | 13.08.2014 | Language: | EN | [2014/33] | Type: | A3 Search report | No.: | EP2765709 | Date: | 27.08.2014 | [2014/35] | Type: | B1 Patent specification | No.: | EP2765709 | Date: | 31.08.2016 | Language: | EN | [2016/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.07.2014 | Classification | IPC: | H03M13/11, H03M13/25, H03M13/27, H03M13/29, // H03M13/15 | [2016/08] | CPC: |
H03M13/1165 (EP,BR);
H04L27/20 (BR,US);
H03M13/13 (US);
H03M13/152 (EP,BR);
H03M13/255 (EP,BR);
H03M13/271 (EP,BR);
H03M13/2906 (EP,BR)
(-)
|
Former IPC [2014/35] | H03M13/11, H03M13/25, H03M13/27, H03M13/29, H04L1/00, // H03M13/15 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/35] |
Former [2014/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung und Verfahren zur verbesserten Modulation und Codierung für breitbandige Satellitenkommunikationssysteme | [2014/33] | English: | Apparatus and method for improved modulation and coding schemes for broadband satellite communications systems | [2014/33] | French: | Appareil et procédé de schémas de modulation et de codage améliorés pour systèmes de communications par satellite à large bande | [2014/33] | Examination procedure | 13.08.2014 | Examination requested [2014/39] | 19.08.2014 | Amendment by applicant (claims and/or description) | 18.09.2014 | Despatch of a communication from the examining division (Time limit: M04) | 05.11.2014 | Reply to a communication from the examining division | 20.01.2016 | Cancellation of oral proceeding that was planned for 26.01.2016 | 26.01.2016 | Date of oral proceedings (cancelled) | 19.02.2016 | Communication of intention to grant the patent | 06.06.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.06.2016 | Fee for grant paid | 06.06.2016 | Fee for publishing/printing paid | 15.07.2016 | Information about intention to grant a patent | 15.07.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.09.2014 | Opposition(s) | 01.06.2017 | No opposition filed within time limit [2017/32] | Fees paid | Renewal fee | 10.02.2016 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.02.2014 | AL | 31.08.2016 | AT | 31.08.2016 | CY | 31.08.2016 | CZ | 31.08.2016 | DK | 31.08.2016 | EE | 31.08.2016 | ES | 31.08.2016 | FI | 31.08.2016 | HR | 31.08.2016 | LT | 31.08.2016 | LV | 31.08.2016 | MC | 31.08.2016 | MK | 31.08.2016 | NL | 31.08.2016 | PL | 31.08.2016 | RO | 31.08.2016 | RS | 31.08.2016 | SE | 31.08.2016 | SI | 31.08.2016 | SK | 31.08.2016 | SM | 31.08.2016 | TR | 31.08.2016 | BG | 30.11.2016 | NO | 30.11.2016 | GR | 01.12.2016 | IS | 31.12.2016 | PT | 02.01.2017 | IE | 10.02.2017 | LU | 10.02.2017 | MT | 10.02.2017 | CH | 28.02.2017 | LI | 28.02.2017 | [2020/33] |
Former [2020/15] | HU | 10.02.2014 | |
AL | 31.08.2016 | ||
AT | 31.08.2016 | ||
CY | 31.08.2016 | ||
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
MK | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
TR | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/52] | HU | 10.02.2014 | |
AL | 31.08.2016 | ||
AT | 31.08.2016 | ||
CY | 31.08.2016 | ||
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
MK | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/46] | HU | 10.02.2014 | |
AL | 31.08.2016 | ||
AT | 31.08.2016 | ||
CY | 31.08.2016 | ||
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/31] | HU | 10.02.2014 | |
AL | 31.08.2016 | ||
AT | 31.08.2016 | ||
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/46] | AL | 31.08.2016 | |
AT | 31.08.2016 | ||
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/43] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
MT | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/13] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
IE | 10.02.2017 | ||
LU | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/04] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
LU | 10.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/51] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/45] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
MC | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
Former [2017/37] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SI | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
Former [2017/32] | AT | 31.08.2016 | |
CZ | 31.08.2016 | ||
DK | 31.08.2016 | ||
EE | 31.08.2016 | ||
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
NL | 31.08.2016 | ||
PL | 31.08.2016 | ||
RO | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
SK | 31.08.2016 | ||
SM | 31.08.2016 | ||
BG | 30.11.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
PT | 02.01.2017 | ||
Former [2017/13] | AT | 31.08.2016 | |
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
LV | 31.08.2016 | ||
NL | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
Former [2017/11] | AT | 31.08.2016 | |
ES | 31.08.2016 | ||
FI | 31.08.2016 | ||
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
NO | 30.11.2016 | ||
GR | 01.12.2016 | ||
Former [2017/10] | FI | 31.08.2016 | |
HR | 31.08.2016 | ||
LT | 31.08.2016 | ||
RS | 31.08.2016 | ||
SE | 31.08.2016 | ||
NO | 30.11.2016 | ||
Former [2017/09] | FI | 31.08.2016 | |
LT | 31.08.2016 | ||
NO | 30.11.2016 | ||
Former [2017/07] | LT | 31.08.2016 | Documents cited: | Search | [XP] - DVB ORGANIZATION, "CfT_Hughes_r1.pdf", DVB, DIGITAL VIDEO BROADCASTING, C/O EBU - 17A ANCIENNE ROUTE - CH-1218 GRAND SACONNEX, GENEVA - SWITZERLAND, (20130213), XP017840327 [XP] 1-9,12-20 * the whole document * | [XP] - DVB ORGANIZATION, "Sx_new_modcods.docx", DVB, DIGITAL VIDEO BROADCASTING, C/O EBU - 17A ANCIENNE ROUTE - CH-1218 GRAND SACONNEX, GENEVA - SWITZERLAND, (20130704), XP017841240 [XP] 1-9,12-20 * the whole document * | [XP] - DVB ORGANIZATION, "tm4878.Sx_new_modcods[1].pdf", DVB, DIGITAL VIDEO BROADCASTING, C/O EBU - 17A ANCIENNE ROUTE - CH-1218 GRAND SACONNEX, GENEVA - SWITZERLAND, (20130603), XP017840644 [XP] 1-9,12-20 * the whole document * | [A] - "Digital Video Broadcasting (DVB);Second generation framing structure, channel coding and modulation systems for Broadcasting,Interactive Services, News Gathering and other broadband satellite applications (DVB-S2)", vol. 302 307, no. V1.2.1, (20090801), pages 22 - 28,37, ETSI EN 302 307 V1.2.1, SOPHIA ANTIPOLIS CEDEX - FRANCE, URL: http://www.etsi.org/deliver/etsi_en/302300_302399/302307/01.02.01_60/ en_302307v010201p.pdf, (20120619), XP002678089 [A] 1-9,12-20 * the whole document * |