EP2770358 - Water-block element for fiber-optic blown tube [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 30.10.2019 | ||
Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Prysmian S.p.A. Via Chiese, 6 20126 Milano / IT | [2017/19] |
Former [2014/35] | For all designated states Prysmian S.p.A. Viale Sarca 222 20126 Milano / IT | Inventor(s) | 01 /
Kerry, Matt Prysmian S.p.A. Viale Sarca 222 I-20126 Milano / IT | 02 /
Millard, Steve Prysmian S.p.A. Viale Sarca 222 I-20126 Milano / IT | 03 /
Griffiths, Ian Prysmian S.p.A. Viale Sarca 222 I-20126 Milano / IT | [2014/35] | Representative(s) | Maccalli, Marco, et al Maccalli & Pezzoli S.r.l. Via Settembrini, 40 20124 Milano / IT | [2014/35] | Application number, filing date | 14156070.6 | 21.02.2014 | [2014/35] | Priority number, date | IT2013MI00255 | 22.02.2013 Original published format: IT MI20130255 | [2014/35] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2770358 | Date: | 27.08.2014 | Language: | EN | [2014/35] | Type: | B1 Patent specification | No.: | EP2770358 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.05.2014 | Classification | IPC: | G02B6/44 | [2014/35] | CPC: |
G02B6/4459 (EP);
G02B6/44775 (EP);
G02B6/52 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] |
Former [2014/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Wasserblockelement für faseroptisches geblasenes Rohr | [2014/35] | English: | Water-block element for fiber-optic blown tube | [2014/35] | French: | Élément imperméable à l'eau pour tube soufflé à fibres optiques | [2019/45] |
Former [2014/35] | Élément d'échangeur à eau pour tube soufflé à fibres optiques | Examination procedure | 26.02.2015 | Amendment by applicant (claims and/or description) | 26.02.2015 | Examination requested [2015/15] | 11.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 07.11.2017 | Reply to a communication from the examining division | 24.09.2019 | Cancellation of oral proceeding that was planned for 09.10.2019 | 09.10.2019 | Date of oral proceedings (cancelled) | 31.10.2019 | Communication of intention to grant the patent | 03.02.2020 | Fee for grant paid | 03.02.2020 | Fee for publishing/printing paid | 03.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.07.2017 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 26.02.2016 | Renewal fee patent year 03 | 27.02.2017 | Renewal fee patent year 04 | 27.02.2018 | Renewal fee patent year 05 | 27.02.2019 | Renewal fee patent year 06 | 27.02.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.02.2014 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | ES | 08.04.2020 | HR | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | BG | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2024/41] |
Former [2024/22] | HU | 21.02.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/30] | HU | 21.02.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/27] | HU | 21.02.2014 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/41] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
ES | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | HR | 08.04.2020 | |
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
BG | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | HR | 08.04.2020 | |
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | HR | 08.04.2020 | |
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | LT | 08.04.2020 | |
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [X]EP0363188 (BRITISH TELECOMM [GB]) [X] 1 * column 2; figure 2 *; | [XI]DE202005013818U (CCS TECHNOLOGY INC [US]) [X] 1-3 * the whole document * [I] 4,5; | [X]GB2425365 (BRITISH ENGINES LTD [GB]) [X] 1,6,7 * the whole document *; | [A]WO2008056091 (PRYSMIAN CABLES & SYSTEM LTD [GB], et al) [A] 1-7* page 1 - page 6 * |