blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2777543

EP2777543 - Method of fabricating modifiable occlusion device [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.10.2018
Database last updated on 21.09.2024
FormerThe patent has been granted
Status updated on  27.10.2017
FormerGrant of patent is intended
Status updated on  15.06.2017
FormerRequest for examination was made
Status updated on  24.05.2017
FormerGrant of patent is intended
Status updated on  07.02.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL, IS
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
DePuy Synthes Products, LLC
325 Paramount Drive
Raynham, MA 02767 / US
[2014/38]
Inventor(s)01 / Slazas, Robert
c/o DePuy Synthes Products, LLC
325 Paramount Drive
Raynham, MA 02767 / US
02 / Geest, Dr. Jonathan Vande
8465 E. Bowline Rd.
Tucson, AZ 85710 / US
 [2017/48]
Former [2014/38]01 / Slazas, Robert
c/o Depuy Synthes Products, LLC
325 Paramount Drive
Raynham, MA Massachusetts 02767 / US
02 / Geest, Dr. Jonathan Vande
8465 E. Bowline Rd.
Tucson, AZ Arizona 85710 / US
Representative(s)Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
[2014/38]
Application number, filing date14158741.011.03.2014
[2014/38]
Priority number, dateUS20131379641512.03.2013         Original published format: US201313796415
[2014/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2777543
Date:17.09.2014
Language:EN
[2014/38]
Type: B1 Patent specification 
No.:EP2777543
Date:29.11.2017
Language:EN
[2017/48]
Search report(s)(Supplementary) European search report - dispatched on:EP31.07.2014
ClassificationIPC:A61B17/12
[2014/38]
CPC:
A61B17/12109 (EP,CN); A61B17/1215 (EP,CN); A61B2017/00526 (EP,CN);
A61B2090/037 (EP,CN)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/48]
Former [2014/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Herstellung einer modifizierbaren Okklusionsvorrichtung[2014/38]
English:Method of fabricating modifiable occlusion device[2014/38]
French:Procédé de fabrication de dispositif d'occlusion modifiable[2014/38]
Examination procedure13.02.2015Amendment by applicant (claims and/or description)
13.02.2015Examination requested  [2015/13]
08.02.2017Communication of intention to grant the patent
18.05.2017Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
12.06.2017Communication of intention to grant the patent
23.10.2017Fee for grant paid
23.10.2017Fee for publishing/printing paid
23.10.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.02.2017
Opposition(s)30.08.2018No opposition filed within time limit [2018/45]
Fees paidRenewal fee
10.03.2016Renewal fee patent year 03
10.03.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.03.2014
AL29.11.2017
AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
MT11.03.2018
IS29.03.2018
BE31.03.2018
[2020/33]
Former [2020/31]HU11.03.2014
AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
MT11.03.2018
BE31.03.2018
Former [2020/28]HU11.03.2014
AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
MT11.03.2018
BE31.03.2018
Former [2020/16]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
MT11.03.2018
BE31.03.2018
Former [2020/08]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
MT11.03.2018
BE31.03.2018
Former [2019/12]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
BE31.03.2018
Former [2019/09]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE11.03.2018
LU11.03.2018
Former [2019/04]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
LU11.03.2018
Former [2018/52]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/40]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/37]AT29.11.2017
CY29.11.2017
CZ29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RS29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/34]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
RS29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/24]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
RS29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/23]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
RS29.11.2017
SE29.11.2017
NO28.02.2018
GR01.03.2018
Former [2018/22]ES29.11.2017
FI29.11.2017
LT29.11.2017
NO28.02.2018
Documents cited:Search[Y]US2004123435  (SOLDANI GIORGIO [IT]) [Y] 1-17 * paragraphs [0021] , [0043] , [0051] , [0053] - [0055] *;
 [YD]US2012253377  (SLAZAS ROBERT [US], et al) [YD] 1-17 * paragraphs [0018] , [0019] , [0040] *;
 [YD]US2012179237  (MILNER KEITH R [US], et al) [YD] 16 * paragraphs [0025] , [0026] *
by applicantUS6187036
 US7156871
 US2007239261
 US7556837
 US2008167724
 US2012179237
 US2012253377
 US2048651
 US692631
 US705691
 US1975504
 US2349950
    - SOLDANI ET AL., "Small diameter polyurethane-polydimethylsiloxane vascular prostheses made by a spraying, phase-inversion process", J. MATERIALS SCIENCE: MATERIALS IN MEDICINE, (1992), vol. 3, pages 106 - 113
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.