EP2744236 - Control plane solution for location service to support wireless access based on Downlink positioning message [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.01.2021 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 14.02.2020 | ||
Former | Grant of patent is intended Status updated on 06.10.2019 | ||
Former | Examination is in progress Status updated on 11.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121 / US | [2017/24] |
Former [2014/25] | For all designated states Qualcomm Technologies, Inc. 5775 Morehouse Drive San Diego, CA 92121 / US | Inventor(s) | 01 /
Edge, Stephen, W. 5775 Morehouse Drive San Diego, CA California 92121 / US | 02 /
Burroughs, Kirk Allan 5775 Morehouse Drive San Diego, CA California 92121 / US | [2014/25] | Representative(s) | Howe, Steven Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2020/12] |
Former [2014/25] | Howe, Steven Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 14159468.9 | 17.08.2009 | [2014/25] | Priority number, date | US20080089795P | 18.08.2008 Original published format: US 89795 P | US20090142556P | 05.01.2009 Original published format: US 142556 P | US20090541841 | 14.08.2009 Original published format: US 541841 | [2014/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2744236 | Date: | 18.06.2014 | Language: | EN | [2014/25] | Type: | B1 Patent specification | No.: | EP2744236 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.05.2014 | Classification | IPC: | H04W4/02, H04W64/00, H04W4/20, H04L29/08, // H04W76/50, H04W4/90 | [2019/26] | CPC: |
H04W4/20 (EP);
H04W64/00 (US);
H04L67/52 (EP,US);
H04W4/02 (EP);
H04W4/029 (US);
H04W4/90 (EP,US);
H04W76/50 (EP,US)
(-)
|
Former IPC [2014/25] | H04W4/02, H04W4/22, H04W76/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/12] |
Former [2014/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Steuerebenenlösung für einen Lokalisierungsdienst zur Unterstützung von drahtlosem Zugang basierend auf abwärtsgerichteter Positionsnachricht | [2014/25] | English: | Control plane solution for location service to support wireless access based on Downlink positioning message | [2014/25] | French: | Solution de plan de commande destinée à des services de localisation pour supporter un accès sans fil basé sur une message de position en voie descendant | [2014/25] | Examination procedure | 12.12.2014 | Amendment by applicant (claims and/or description) | 12.12.2014 | Examination requested [2015/04] | 11.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.09.2018 | Reply to a communication from the examining division | 18.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.05.2019 | Reply to a communication from the examining division | 07.10.2019 | Communication of intention to grant the patent | 07.02.2020 | Fee for grant paid | 07.02.2020 | Fee for publishing/printing paid | 07.02.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP09791597.9 / EP2338266 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20090791597) is 08.05.2014 | Opposition(s) | 21.12.2020 | No opposition filed within time limit [2021/08] | Fees paid | Renewal fee | 13.03.2014 | Renewal fee patent year 03 | 13.03.2014 | Renewal fee patent year 04 | 13.03.2014 | Renewal fee patent year 05 | 07.08.2014 | Renewal fee patent year 06 | 07.08.2015 | Renewal fee patent year 07 | 05.08.2016 | Renewal fee patent year 08 | 10.08.2017 | Renewal fee patent year 09 | 10.08.2018 | Renewal fee patent year 10 | 08.08.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 18.03.2020 | CY | 18.03.2020 | CZ | 18.03.2020 | DK | 18.03.2020 | EE | 18.03.2020 | HR | 18.03.2020 | LT | 18.03.2020 | LV | 18.03.2020 | MC | 18.03.2020 | MK | 18.03.2020 | MT | 18.03.2020 | PL | 18.03.2020 | RO | 18.03.2020 | SE | 18.03.2020 | SI | 18.03.2020 | SK | 18.03.2020 | SM | 18.03.2020 | TR | 18.03.2020 | BG | 18.06.2020 | NO | 18.06.2020 | GR | 19.06.2020 | IS | 18.07.2020 | PT | 12.08.2020 | IE | 17.08.2020 | LU | 17.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | [2022/32] |
Former [2022/27] | AT | 18.03.2020 | |
CY | 18.03.2020 | ||
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
MT | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
TR | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 17.08.2020 | ||
LU | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 17.08.2020 | ||
LU | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
LU | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/24] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
LU | 17.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
LU | 17.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/11] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/08] | CZ | 18.03.2020 | |
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/50] | CZ | 18.03.2020 | |
EE | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/49] | CZ | 18.03.2020 | |
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/48] | HR | 18.03.2020 | |
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
RO | 18.03.2020 | ||
SE | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/47] | HR | 18.03.2020 | |
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
Former [2020/46] | HR | 18.03.2020 | |
LV | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
Former [2020/39] | HR | 18.03.2020 | |
LV | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
Former [2020/38] | HR | 18.03.2020 | |
LV | 18.03.2020 | ||
SE | 18.03.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
Former [2020/37] | HR | 18.03.2020 | |
LV | 18.03.2020 | ||
SE | 18.03.2020 | ||
NO | 18.06.2020 | ||
Former [2020/35] | NO | 18.06.2020 | Documents cited: | Search | [IP] - QUALCOMM EUROPE, "LCS Control Plane Alternatives for EPS", 3GPP DRAFT; S2-085599 (LCS CONTROL PLANE SOLUTION FOR EPS), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080819), vol. SA WG2, no. Sophia Antipolis, France; 20080825 - 20080829, XP050628859 [IP] 1-13 * figures 6,7,10 * | [XPI] - QUALCOMM EUROPE ET AL, "Details on Architectural Alternative #2 for LCS Control Plane Solutions for EPS", 3GPP DRAFT; S2-088298_E-MAIL-REV1-S2-088148_(LCS CP SOLUTION FOR EPS - ARCHITECTURE ALTERNATIVE #2), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081129), vol. SA WG2, no. Miami; 20081117 - 20081121, XP050629278 [XP] 1,5,7,11,13 * chapter 6.2.3.4, figure 6.2.9 * [I] 1-13 | Examination | US2002110096 | - BEMING P ET AL, "LTE-SAE ARCHITECTURE AND PERFORMANCE", ERICSSON REVIEW (INCL. ON), TELEFONAKTIEBOLAGET L M ERICSSON, SE, (20070101), no. 3, ISSN 0014-0171, pages 98 - 104, XP001507749 |