| EP2819357 - Automatic protection switching method, equipment and system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.03.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 10.04.2020 | ||
| Former | Grant of patent is intended Status updated on 08.12.2019 | ||
| Former | Examination is in progress Status updated on 11.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/20] |
| Former [2015/01] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
Long, Hao c/o Huawei Technologies Co., Ltd. Huawei Administration Building, Bantian, Longgang District 518129 Shenzhen / CN | [2015/01] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2015/01] | Application number, filing date | 14162838.8 | 17.05.2010 | [2015/01] | Priority number, date | CN20091091787 | 25.08.2009 Original published format: CN200910091787 | [2015/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2819357 | Date: | 31.12.2014 | Language: | EN | [2015/01] | Type: | A3 Search report | No.: | EP2819357 | Date: | 25.02.2015 | Language: | EN | [2015/09] | Type: | B1 Patent specification | No.: | EP2819357 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.01.2015 | Classification | IPC: | H04L12/729, H04L12/709, H04L12/711, H04W40/00, H04L12/24, H04L12/26, H04L12/707, H04L12/725 | [2015/09] | CPC: |
H04L45/24 (EP,BR,US);
H04L41/5025 (EP,BR,US);
H04L41/0654 (US);
H04L43/0882 (EP,BR,US);
H04L45/125 (EP,BR,US);
H04L45/22 (EP,BR,US);
|
| Former IPC [2015/01] | H04L12/729, H04L12/709, H04L12/711, H04W40/00, H04L12/24, H04L12/26, H04L12/707 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2015/01] | Title | German: | Automatisches Schutzumschaltverfahren, Ausrüstung und System | [2015/01] | English: | Automatic protection switching method, equipment and system | [2015/01] | French: | Procédé de commutation de protection automatique, équipement et système | [2015/01] | Examination procedure | 31.03.2014 | Examination requested [2015/01] | 25.08.2015 | Amendment by applicant (claims and/or description) | 15.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 24.09.2018 | Reply to a communication from the examining division | 04.02.2019 | Despatch of a communication from the examining division (Time limit: M06) | 08.08.2019 | Reply to a communication from the examining division | 09.12.2019 | Communication of intention to grant the patent | 15.03.2020 | Fee for grant paid | 15.03.2020 | Fee for publishing/printing paid | 02.04.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10811158.4 / EP2464055 | Divisional application(s) | EP20172670.0 / EP3739829 | EP22195286.4 / EP4125250 | Opposition(s) | 16.02.2021 | No opposition filed within time limit [2021/16] | Fees paid | Renewal fee | 31.03.2014 | Renewal fee patent year 03 | 31.03.2014 | Renewal fee patent year 04 | 31.03.2014 | Renewal fee patent year 05 | 21.05.2015 | Renewal fee patent year 06 | 31.05.2016 | Renewal fee patent year 07 | 29.05.2017 | Renewal fee patent year 08 | 29.05.2018 | Renewal fee patent year 09 | 29.05.2019 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.05.2010 | AL | 13.05.2020 | AT | 13.05.2020 | CY | 13.05.2020 | CZ | 13.05.2020 | DK | 13.05.2020 | EE | 13.05.2020 | FI | 13.05.2020 | HR | 13.05.2020 | LT | 13.05.2020 | LV | 13.05.2020 | MC | 13.05.2020 | MK | 13.05.2020 | MT | 13.05.2020 | NL | 13.05.2020 | PL | 13.05.2020 | RO | 13.05.2020 | SE | 13.05.2020 | SI | 13.05.2020 | SK | 13.05.2020 | SM | 13.05.2020 | TR | 13.05.2020 | IE | 17.05.2020 | LU | 17.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | FR | 13.07.2020 | BG | 13.08.2020 | NO | 13.08.2020 | GR | 14.08.2020 | IS | 13.09.2020 | PT | 14.09.2020 | [2022/32] |
| Former [2022/27] | HU | 17.05.2010 | |
| AL | 13.05.2020 | ||
| AT | 13.05.2020 | ||
| CY | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| MC | 13.05.2020 | ||
| MT | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SI | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| TR | 13.05.2020 | ||
| IE | 17.05.2020 | ||
| LU | 17.05.2020 | ||
| BE | 31.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| FR | 13.07.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/23] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| MC | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SI | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| IE | 17.05.2020 | ||
| LU | 17.05.2020 | ||
| BE | 31.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| FR | 13.07.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/20] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| MC | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| IE | 17.05.2020 | ||
| LU | 17.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/15] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| MC | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| LU | 17.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/13] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| MC | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/10] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| PL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SK | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/09] | AL | 13.05.2020 | |
| AT | 13.05.2020 | ||
| CZ | 13.05.2020 | ||
| DK | 13.05.2020 | ||
| EE | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/08] | AL | 13.05.2020 | |
| DK | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| RO | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| SM | 13.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/07] | AL | 13.05.2020 | |
| DK | 13.05.2020 | ||
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/04] | AL | 13.05.2020 | |
| FI | 13.05.2020 | ||
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| NL | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2021/01] | FI | 13.05.2020 | |
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| BG | 13.08.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2020/50] | FI | 13.05.2020 | |
| HR | 13.05.2020 | ||
| LT | 13.05.2020 | ||
| LV | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| NO | 13.08.2020 | ||
| GR | 14.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2020/48] | FI | 13.05.2020 | |
| LT | 13.05.2020 | ||
| SE | 13.05.2020 | ||
| NO | 13.08.2020 | ||
| IS | 13.09.2020 | ||
| PT | 14.09.2020 | ||
| Former [2020/47] | LT | 13.05.2020 | |
| NO | 13.08.2020 | ||
| IS | 13.09.2020 | ||
| Former [2020/46] | IS | 13.09.2020 | Documents cited: | Search | [XY] US2003216141 (ANTONIOU ZOE et al.) [X] 1,8 * the whole document *[Y] 2-7,9-11 | [A] US2006239271 (KHASNABISH BHUMIP et al.) [A] 1-11 * the whole document * | [A] US2009041015 (ZHANG FAN et al.) [A] 1-11 * the whole document * | [XY] SHARMA V ET AL: "Framework for Multi-Protocol Label Switching (MPLS)-based Recovery; rfc3469.txt", 20030201, 1 February 2003 (2003-02-01), XP015009252, ISSN: 0000-0003 [X] 1,8 * Chapters: 3.4.4.1, 3.5 *[Y] 2-7,9-11 | Examination | US2004114536 |