blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2816558

EP2816558 - SPEECH PROCESSING DEVICE AND METHOD [Right-click to bookmark this link]
Former [2014/52]Speech processing device and method
[2019/13]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  24.02.2019
FormerExamination is in progress
Status updated on  09.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
FUJITSU LIMITED
1-1, Kamikodanaka 4-chome, Nakahara-ku Kawasaki-shi
Kanagawa 211-8588 / JP
[2014/52]
Inventor(s)01 / Togawa, Taro
c/o FUJITSU LIMITED
1-1, Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi
Kanagawa, 211-8588 / JP
02 / Shioda, Chisato
c/o FUJITSU LIMITED
1-1, Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi
Kanagawa, 211-8588 / JP
03 / Otani, Takeshi
c/o FUJITSU LIMITED
1-1, Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi
Kanagawa, 211-8588 / JP
 [2014/52]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2014/52]
Application number, filing date14166346.829.04.2014
[2014/52]
Priority number, dateJP2013012630317.06.2013         Original published format: JP 2013126303
[2014/52]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2816558
Date:24.12.2014
Language:EN
[2014/52]
Type: B1 Patent specification 
No.:EP2816558
Date:12.06.2019
Language:EN
[2019/24]
Search report(s)(Supplementary) European search report - dispatched on:EP18.11.2014
ClassificationIPC:G10L21/057, G10L15/04, G10L15/02, G10L21/02, // G10L15/08
[2019/11]
CPC:
G10L21/057 (EP,US); G10L13/027 (US); G10L15/02 (EP,US);
G10L15/04 (EP,US); G10L15/08 (US); G10L21/02 (EP,US);
G10L21/0364 (US) (-)
Former IPC [2014/52]G10L21/057, G10L15/04, G10L15/02, G10L21/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/25]
Former [2014/52]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SPRACHVERARBEITUNGSVORRICHTUNG UND -VERFAHREN[2019/13]
English:SPEECH PROCESSING DEVICE AND METHOD[2019/13]
French:DISPOSITIF ET PROCÉDÉ DE TRAITEMENT DE LA PAROLE[2019/13]
Former [2014/52]Sprachverarbeitungsvorrichtung und -verfahren
Former [2014/52]Speech processing device and method
Former [2014/52]Dispositif et procédé de traitement de la parole
Examination procedure11.05.2015Examination requested  [2015/25]
23.06.2015Amendment by applicant (claims and/or description)
08.11.2018Despatch of a communication from the examining division (Time limit: M04)
25.01.2019Reply to a communication from the examining division
25.02.2019Communication of intention to grant the patent
02.05.2019Fee for grant paid
02.05.2019Fee for publishing/printing paid
02.05.2019Receipt of the translation of the claim(s)
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Fees paidRenewal fee
02.02.2016Renewal fee patent year 03
08.02.2017Renewal fee patent year 04
01.03.2018Renewal fee patent year 05
05.02.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.04.2014
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MK12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
[2022/32]
Former [2022/27]HU29.04.2014
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/52]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/36]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/24]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/13]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/11]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
AT12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/09]AL12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2020/07]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/51]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/50]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
NO12.09.2019
GR13.09.2019
Former [2019/49]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/48]FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/47]FI12.06.2019
LT12.06.2019
NO12.09.2019
Documents cited:Search[A]US7065485  (CHONG-WHITE NICOLA R [US], et al) [A] 1,11 * abstract *;
 [A]US2012203553  (MARUTA YUZO [JP]) [A] 1,11 * abstract ** paragraph [0006] *;
 [XAI]  - DANIEL FELPS ET AL, "Foreign Accent Conversion Through Concatenative Synthesis in the Articulatory Domain", IEEE TRANSACTIONS ON AUDIO, SPEECH AND LANGUAGE PROCESSING, IEEE SERVICE CENTER, NEW YORK, NY, USA, (20121001), vol. 20, no. 8, doi:10.1109/TASL.2012.2201474, ISSN 1558-7916, pages 2301 - 2312, XP011456070 [X] 1,10,11 * abstract * * paragraphs [00II] , [ IVA] * [A] 5,8 [I] 2-4,6,7,9,12-14

DOI:   http://dx.doi.org/10.1109/TASL.2012.2201474
 [A]  - FELPS D ET AL, "Foreign accent conversion in computer assisted pronunciation training", SPEECH COMMUNICATION, ELSEVIER SCIENCE PUBLISHERS, AMSTERDAM, NL, vol. 51, no. 10, ISSN 0167-6393, (20091001), pages 920 - 932, (20081130), XP026448174 [A] 1-15 * abstract * * paragraphs [0001] , [ 4.1] , [ 4.1.1.] *
 [A]  - QIN YAN ET AL, "Analysis by synthesis of acoustic correlates of British, Australian and american accents", ACOUSTICS, SPEECH, AND SIGNAL PROCESSING, 2004. PROCEEDINGS. (ICASSP ' 04). IEEE INTERNATIONAL CONFERENCE ON MONTREAL, QUEBEC, CANADA 17-21 MAY 2004, PISCATAWAY, NJ, USA,IEEE, PISCATAWAY, NJ, USA, (20040517), vol. 1, ISBN 978-0-7803-8484-2, pages 637 - 640, XP010717709 [A] 1-15 * abstract * * paragraph [I.A.3] * * paragraph [I.A.4] * * paragraph [0V.A] * * paragraph [00VI] *
 [A]  - Keiichi Tajima ET AL, "Ef fects of temporal correction on intelligibility of foreign-accented English 1", Journal of Phonetics, (19970101), pages 1 - 24, URL: http://www.sciencedirect.com/science/article/pii/S0095447096900315/pdf?md5=a13bab6f37ae98ec26df73a6d5bac5e7&pid=1-s2.0-S0095447096900315-main.pdf, (20141105), XP055151147 [A] 1,11 * abstract * * paragraph [2.1.3] *
ExaminationUS2003157468
by applicantJPS6254297
 JPS63155200
 JPH04255900
 JP2009258366
 WO2009145192
 JP4942860B
 JP5160594B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.