EP2965853 - Processing of material using elongated laser beams [Right-click to bookmark this link] | |||
Former [2016/02] | Processing of material using asymmetric laser beams | ||
[2016/11] | Status | Patent maintained as amended Status updated on 21.02.2020 Database last updated on 02.11.2024 | Most recent event Tooltip | 19.06.2020 | Lapse of the patent in a contracting state New state(s): HR | published on 22.07.2020 [2020/30] | Applicant(s) | For all designated states High Q Laser GmbH Feldgut 9 6830 Rankweil / AT | [2016/02] | Inventor(s) | 01 /
Matylitsky, Victor V. Hundweilerstrasse 31 88131 Lindau / DE | 02 /
Hendricks, Frank Gewerbestrasse 14a 6822 Satteins / AT | [2016/38] |
Former [2016/02] | 01 /
Matylitsky, Victor V. Hoyerbergweg 12 D-88131 Bodolz / DE | ||
02 /
Hendricks, Frank Gewerbestrasse 14a A-6822 Satteins / AT | Representative(s) | Kaminski Harmann Patentanwälte AG Landstrasse 124 9490 Vaduz / LI | [2020/13] |
Former [2016/02] | Holzheu, Christian Kaminski Harmann Patentanwälte AG Landstrasse 124 9490 Vaduz / LI | Application number, filing date | 14176292.2 | 09.07.2014 | [2016/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2965853 | Date: | 13.01.2016 | Language: | EN | [2016/02] | Type: | B1 Patent specification | No.: | EP2965853 | Date: | 21.09.2016 | Language: | EN | [2016/38] | Type: | B2 New European patent specification | No.: | EP2965853 | Date: | 25.03.2020 | Language: | EN | [2020/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.02.2015 | Classification | IPC: | B23K26/073, B23K26/00, B23K26/06, B23K26/40 | [2016/02] | CPC: |
B23K26/53 (EP,KR,US);
B23K26/0006 (EP,CN,KR,US);
B23K26/0624 (EP,CN,KR,US);
B23K26/0626 (US);
B23K26/0736 (EP,CN,KR,US);
B23K26/38 (US);
B23K26/40 (EP,CN,KR,US);
C03B33/0222 (EP,CN,KR,US);
C03B33/04 (EP,CN,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Bearbeitung von Material unter Verwendung asymmetrischer Laserstrahlen | [2019/14] | English: | Processing of material using elongated laser beams | [2016/11] | French: | Traitement de matériaux au moyen de faisceaux laser asymétriques | [2019/14] |
Former [2016/02] | Bearbeitung von Material unter Verwendung asymmetrischer Laserstrahlen | ||
Former [2016/02] | Processing of material using asymmetric laser beams | ||
Former [2016/02] | Traitement de matériaux au moyen de faisceaux laser asymétriques | Examination procedure | 31.07.2015 | Amendment by applicant (claims and/or description) | 31.07.2015 | Examination requested [2016/02] | 01.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 20.10.2015 | Reply to a communication from the examining division | 18.03.2016 | Communication of intention to grant the patent | 14.07.2016 | Fee for grant paid | 14.07.2016 | Fee for publishing/printing paid | 14.07.2016 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
21.06.2017
26.06.2017
ADMISSIBLE Ponti & Partners, S.L.P. C. Consell de Cent, 322 08007 Barcelona / ES | [2018/21] |
Former [2017/30] | |||
Opponent(s) | 01
21.06.2017
Oficina Ponti, S.L.P. C. Consell de Cent, 322 08007 Barcelona / ES | 26.07.2017 | Invitation to proprietor to file observations on the notice of opposition | 21.11.2017 | Reply of patent proprietor to notice(s) of opposition | 26.02.2019 | Date of oral proceedings | 22.05.2019 | Despatch of interlocutory decision in opposition | 22.05.2019 | Despatch of minutes of oral proceedings | 13.09.2019 | Legal effect of interlocutory decision in opposition | 26.11.2019 | Despatch of communication that the patent will be maintained as amended | 12.02.2020 | Fee for printing new specification paid | Appeal following opposition | 19.07.2019 | Appeal received No. T2086/19 | 13.09.2019 | Result of appeal procedure: appeal of the opponent withdrawn | Fees paid | Renewal fee | 20.07.2016 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.07.2014 | AL | 21.09.2016 | BE | 21.09.2016 | CY | 21.09.2016 | CZ | 21.09.2016 | DK | 21.09.2016 | EE | 21.09.2016 | ES | 21.09.2016 | FI | 21.09.2016 | HR | 21.09.2016 | IT | 21.09.2016 | LV | 21.09.2016 | MC | 21.09.2016 | MK | 21.09.2016 | NL | 21.09.2016 | PL | 21.09.2016 | RO | 21.09.2016 | RS | 21.09.2016 | SE | 21.09.2016 | SI | 21.09.2016 | SK | 21.09.2016 | SM | 21.09.2016 | TR | 21.09.2016 | BG | 21.12.2016 | NO | 21.12.2016 | GR | 22.12.2016 | IS | 21.01.2017 | PT | 23.01.2017 | LU | 09.07.2017 | MT | 09.07.2017 | [2020/30] |
Former [2020/15] | HU | 09.07.2014 | |
AL | 21.09.2016 | ||
BE | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MK | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
TR | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2019/52] | HU | 09.07.2014 | |
AL | 21.09.2016 | ||
BE | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
MK | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2019/47] | HU | 09.07.2014 | |
AL | 21.09.2016 | ||
BE | 21.09.2016 | ||
CY | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2019/31] | HU | 09.07.2014 | |
AL | 21.09.2016 | ||
BE | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2019/30] | AL | 21.09.2016 | |
BE | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
MC | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2018/47] | AL | 21.09.2016 | |
BE | 21.09.2016 | ||
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2018/43] | BE | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
MT | 09.07.2017 | ||
Former [2018/34] | BE | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
LU | 09.07.2017 | ||
Former [2017/52] | BE | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SI | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/34] | BE | 21.09.2016 | |
CZ | 21.09.2016 | ||
DK | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/32] | BE | 21.09.2016 | |
CZ | 21.09.2016 | ||
EE | 21.09.2016 | ||
ES | 21.09.2016 | ||
FI | 21.09.2016 | ||
IT | 21.09.2016 | ||
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
PL | 21.09.2016 | ||
RO | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
SK | 21.09.2016 | ||
SM | 21.09.2016 | ||
BG | 21.12.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
IS | 21.01.2017 | ||
PT | 23.01.2017 | ||
Former [2017/13] | FI | 21.09.2016 | |
LV | 21.09.2016 | ||
NL | 21.09.2016 | ||
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
Former [2017/11] | FI | 21.09.2016 | |
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
GR | 22.12.2016 | ||
Former [2017/10] | FI | 21.09.2016 | |
RS | 21.09.2016 | ||
SE | 21.09.2016 | ||
NO | 21.12.2016 | ||
Former [2017/09] | FI | 21.09.2016 | |
NO | 21.12.2016 | Documents cited: | Search | [X]US2012111310 (RYU BENG SO [KR], et al) [X] 1-15 * abstract * * paragraphs [0050] , [0055] , [0056] , [0079] , [0097] - [0102] - [0124] , [0139] * * claims 1,16 ** figures 5,7,12,13,15,16 *; | [X]DE102012110971 (SCHOTT AG [DE]) [X] 1-15 * paragraphs [0001] , [0013] , [0014] , [0016] , [0021] , [0026] , [0033] , [0059] , [0064] * * figures 1-2 * | by applicant | - D. HELIE; R. VALLEE, "Micromashining of Thin Glass Plates with a Femtosecond Laser", PROC. OF SPIE, (2009), vol. 7386, doi:doi:10.1117/12.840553, page 738639, XP055166847 DOI: http://dx.doi.org/10.1117/12.840553 | - F. AHMED; M.S. LEE; H. SEKITA, "Display Glass Cutting by Femtosecond Laser induced single shot periodic void array", APPL. PHYS. A, (2008), vol. 93, pages 189 - 192, XP019626882 | Opposition | WO2012006736 | US2012111310 | DE102012110971 |