blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2827561

EP2827561 - Server controlled adaptive back off for overload protection using internal error counts [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.10.2018
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  03.11.2017
FormerGrant of patent is intended
Status updated on  05.06.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL, IS
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Synchronoss Technologies, Inc.
200 Crossing Boulevard
Bridgewater, NJ 08807 / US
[2017/49]
Former [2015/04]For all designated states
Synchronoss Technologies, Inc.
200 Crossing Boulevard
Bridgewater, NJ 08807 / US
Inventor(s)01 / Byrne, Eoin
2 Fonthill Court
Rathfarnham
Dublin, 14 / IE
 [2015/04]
Representative(s)Branderhorst, Matthijs Pieter Arie, et al
Marks & Clerk LLP
2nd Floor, Wytham Court
11 West Way
Oxford OX2 0JB / GB
[N/P]
Former [2017/49]Branderhorst, Matthijs Pieter Arie, et al
Marks & Clerk LLP
Fletcher House
Heatley Road The Oxford Science Park
Oxford OX4 4GE / GB
Former [2015/04]Goddar, Heinz J., et al
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Patentanwälte Rechtsanwälte
Pettenkoferstrasse 20-22
80336 München / DE
Application number, filing date14177582.518.07.2014
[2015/04]
Priority number, dateUS201361847876P18.07.2013         Original published format: US 201361847876 P
US20141433303816.07.2014         Original published format: US201414333038
[2015/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2827561
Date:21.01.2015
Language:EN
[2015/04]
Type: B1 Patent specification 
No.:EP2827561
Date:06.12.2017
Language:EN
[2017/49]
Search report(s)(Supplementary) European search report - dispatched on:EP21.11.2014
ClassificationIPC:H04L29/08
[2015/04]
CPC:
H04L67/1008 (EP,US); G06F11/079 (US); G06F11/3409 (US);
H04L67/62 (EP,US); H04L67/1034 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/36]
Former [2015/04]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Servergesteuertes, adaptives Zurücksetzen zum Überlastungsschutz mittels Zählungen interner Fehler[2015/04]
English:Server controlled adaptive back off for overload protection using internal error counts[2015/04]
French:Réduction adaptative contrôlée de serveur pour protection contre les surcharges au moyen de décomptes d'erreurs internes[2015/04]
Examination procedure21.07.2015Amendment by applicant (claims and/or description)
21.07.2015Examination requested  [2015/36]
08.03.2016Despatch of a communication from the examining division (Time limit: M04)
15.07.2016Reply to a communication from the examining division
06.06.2017Communication of intention to grant the patent
10.10.2017Fee for grant paid
10.10.2017Fee for publishing/printing paid
10.10.2017Receipt of the translation of the claim(s)
Opposition(s)07.09.2018No opposition filed within time limit [2018/46]
Fees paidRenewal fee
11.07.2016Renewal fee patent year 03
12.07.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.07.2014
AL06.12.2017
AT06.12.2017
CY06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
MK06.12.2017
NL06.12.2017
PL06.12.2017
PT06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
TR06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
IS06.04.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
[2020/33]
Former [2020/31]HU18.07.2014
AT06.12.2017
CY06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
MK06.12.2017
NL06.12.2017
PL06.12.2017
PT06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
TR06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/28]HU18.07.2014
AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
PT06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
TR06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/16]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
TR06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/08]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/24]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/21]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/17]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
LU18.07.2018
Former [2019/15]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
MC06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/52]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SI06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/51]AT06.12.2017
CZ06.12.2017
DK06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/40]AT06.12.2017
CZ06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RO06.12.2017
RS06.12.2017
SE06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/39]AT06.12.2017
CZ06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
IT06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RS06.12.2017
SE06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/38]AT06.12.2017
CZ06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RS06.12.2017
SE06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/37]CZ06.12.2017
EE06.12.2017
FI06.12.2017
HR06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
PL06.12.2017
RS06.12.2017
SE06.12.2017
SK06.12.2017
SM06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/34]FI06.12.2017
HR06.12.2017
LT06.12.2017
LV06.12.2017
NL06.12.2017
RS06.12.2017
SE06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/24]FI06.12.2017
HR06.12.2017
LT06.12.2017
LV06.12.2017
RS06.12.2017
SE06.12.2017
BG06.03.2018
NO06.03.2018
GR07.03.2018
Former [2018/23]FI06.12.2017
HR06.12.2017
LT06.12.2017
RS06.12.2017
SE06.12.2017
NO06.03.2018
GR07.03.2018
Former [2018/22]FI06.12.2017
LT06.12.2017
NO06.03.2018
Documents cited:Search[X]US2005102393  (MURRAY CHRISTOPHER [GB], et al) [X] 1-15 * abstract * * paragraph [0030] - paragraph [0037] * * paragraph [0040] - paragraph [0046] * * paragraph [0052] - paragraph [0066] * * paragraph [0068] - paragraph [0081] * * figures 1-5; claims 1-29 *;
 [X]US2012030326  (CASSIDY BRENDAN [CA], et al) [X] 1-15 * abstract * * paragraph [0016] - paragraph [0019] * * paragraph [0022] - paragraph [0029] * * paragraph [0032] - paragraph [0061] ** figures 1-7; claims 1-20 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.