EP2832464 - Lamella element and method for producing a lamella element [Right-click to bookmark this link] | |||
Former [2015/06] | Lamella element, method for producing a lamella element and tool for manufacturing the lamella element | ||
[2022/15] | Status | No opposition filed within time limit Status updated on 22.09.2023 Database last updated on 22.01.2025 | |
Former | The patent has been granted Status updated on 14.10.2022 | ||
Former | Grant of patent is intended Status updated on 07.09.2022 | ||
Former | Examination is in progress Status updated on 27.07.2022 | ||
Former | Grant of patent is intended Status updated on 31.03.2022 | ||
Former | Examination is in progress Status updated on 17.08.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states DBK David + Baader GmbH Nordring 26 76761 Rülzheim / DE | [2015/06] | Inventor(s) | 01 /
David, Clemens Rathausgasse 1 76870 Kandel / DE | 02 /
Jäger, Rupert Turmstraße 15 76744 Wörth-Büchelberg / DE | [2015/06] | Representative(s) | Winter, Brandl - Partnerschaft mbB Alois-Steinecker-Straße 22 85354 Freising / DE | [2022/46] |
Former [2015/06] | Winter, Brandl, Fürniss, Hübner, Röss, Kaiser, Polte - Partnerschaft mbB Patent- und Rechtsanwaltskanzlei Bavariaring 10 80336 München / DE | Application number, filing date | 14179522.9 | 01.08.2014 | [2015/06] | Priority number, date | DE201310108357 | 02.08.2013 Original published format: DE102013108357 | [2015/06] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2832464 | Date: | 04.02.2015 | Language: | DE | [2015/06] | Type: | B1 Patent specification | No.: | EP2832464 | Date: | 16.11.2022 | Language: | DE | [2022/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.12.2014 | Classification | IPC: | B21D13/08, B21D53/02, F24H3/04, F28F3/02, F28F1/12 | [2015/06] | CPC: |
B21D53/022 (EP);
B21D13/08 (EP);
F24H3/0435 (EP);
F28F1/126 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/35] |
Former [2015/06] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Lamellenelement und Verfahren zur Herstellung eines Lamellenelements | [2022/15] | English: | Lamella element and method for producing a lamella element | [2022/15] | French: | Élément lamellaire et procédé de fabrication d'un élément lamellaire | [2022/15] |
Former [2015/06] | Lamellenelement, Verfahren zur Herstellung eines Lamellenelements und Werkzeug zum Herstellen des Lamellenelements | ||
Former [2015/06] | Lamella element, method for producing a lamella element and tool for manufacturing the lamella element | ||
Former [2015/06] | Élément lamellaire, procédé de fabrication d'un élément lamellaire et outil de fabrication de l'élément lamellaire | Examination procedure | 15.07.2015 | Amendment by applicant (claims and/or description) | 15.07.2015 | Examination requested [2015/35] | 21.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.12.2018 | Reply to a communication from the examining division | 11.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.07.2021 | Reply to a communication from the examining division | 01.04.2022 | Communication of intention to grant the patent | 26.07.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.09.2022 | Communication of intention to grant the patent | 12.10.2022 | Fee for grant paid | 12.10.2022 | Fee for publishing/printing paid | 12.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 17.08.2023 | No opposition filed within time limit [2023/43] | Fees paid | Renewal fee | 02.08.2016 | Renewal fee patent year 03 | 31.07.2017 | Renewal fee patent year 04 | 12.07.2018 | Renewal fee patent year 05 | 08.07.2019 | Renewal fee patent year 06 | 06.08.2020 | Renewal fee patent year 07 | 09.07.2021 | Renewal fee patent year 08 | 04.08.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 16.11.2022 | BG | 16.11.2022 | CZ | 16.11.2022 | DK | 16.11.2022 | EE | 16.11.2022 | ES | 16.11.2022 | FI | 16.11.2022 | HR | 16.11.2022 | LT | 16.11.2022 | LV | 16.11.2022 | MC | 16.11.2022 | NL | 16.11.2022 | PL | 16.11.2022 | RO | 16.11.2022 | RS | 16.11.2022 | SI | 16.11.2022 | SK | 16.11.2022 | SM | 16.11.2022 | NO | 16.02.2023 | GR | 17.02.2023 | IS | 16.03.2023 | PT | 16.03.2023 | AT | 01.08.2023 | IE | 01.08.2023 | LU | 01.08.2023 | [2024/51] |
Former [2024/48] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
AT | 01.08.2023 | ||
IE | 01.08.2023 | ||
LU | 01.08.2023 | ||
Former [2024/33] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
IE | 01.08.2023 | ||
LU | 01.08.2023 | ||
Former [2024/21] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
LU | 01.08.2023 | ||
Former [2024/16] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/51] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/38] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/37] | AL | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/35] | CZ | 16.11.2022 | |
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/34] | DK | 16.11.2022 | |
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/33] | DK | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/29] | ES | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/26] | ES | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/24] | ES | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/23] | ES | 16.11.2022 | |
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/22] | ES | 16.11.2022 | |
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
NO | 16.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/20] | LT | 16.11.2022 | |
NO | 16.02.2023 | Documents cited: | Search | [X]US3673846 (LEVINGTON HENRY JOHN, et al) [X] 1-14 * figures 1,2,6,8 *; | [X]GB1535781 (COVRAD LTD) [X] 1-14* figure 1 *; | [X]JPH0347641 (MITSUBISHI HEAVY IND LTD) [X] 1-14 * abstract *; | [X]EP1918668 (BEHR GMBH & CO KG [DE]) [X] 1-14 * figures 1,2 *; | [XD]EP2022293 (VALEO SYSTEMES THERMIQUES [FR]) [XD] 1-14 * paragraphs [0040] , [0051]; figure - * | Examination | JPH09155487 | JPH09280754 | DE112011100691T | by applicant | EP1327834 | EP2022293 |