EP2826548 - WASTE WATER TREATMENT SYSTEM [Right-click to bookmark this link] | |||
Former [2015/04] | Waste water treatment system | ||
[2017/21] | Status | No opposition filed within time limit Status updated on 24.08.2018 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 15.09.2017 | ||
Former | Grant of patent is intended Status updated on 15.05.2017 | ||
Former | Examination is in progress Status updated on 28.02.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Van Den Berg, Zacharias Joseph 53 Hawer Street 2515 Fochville / ZA | [2015/04] | Inventor(s) | 01 /
see applicant ... | [2015/04] | Representative(s) | Smaggasgale, Gillian Helen WP Thompson 138 Fetter Lane London EC4A 1BT / GB | [2017/42] |
Former [2015/04] | Smaggasgale, Gillian Helen WP Thompson 55 Drury Lane London WC2B 5SQ / GB | Application number, filing date | 14181999.5 | 03.03.2011 | [2015/04] | Priority number, date | ZA20100001553 | 03.03.2010 Original published format: ZA 201001553 | [2015/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2826548 | Date: | 21.01.2015 | Language: | EN | [2015/04] | Type: | B1 Patent specification | No.: | EP2826548 | Date: | 18.10.2017 | Language: | EN | [2017/42] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.12.2014 | Classification | IPC: | B01F5/10, B01F7/16, B01F13/10, C02F3/12, C02F3/28, // B01F3/12, B01F15/00 | [2015/04] | CPC: |
C02F3/1284 (EP,US);
B01F25/50 (EP,US);
B01F27/81 (EP,US);
B01F27/811 (EP,US);
B01F33/81 (EP,US);
B01F33/813 (EP,US);
C02F3/2873 (EP,US);
B01F2101/305 (EP,US);
B01F23/50 (EP,US);
Y02W10/10 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/35] |
Former [2015/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM ZUR ABWASSERBEHANDLUNG | [2017/21] | English: | WASTE WATER TREATMENT SYSTEM | [2017/21] | French: | SYSTÈME DE TRAITEMENT DES EAUX USÉES | [2017/21] |
Former [2015/04] | Abwasserbehandlung | ||
Former [2015/04] | Waste water treatment system | ||
Former [2015/04] | Système de traitement des eaux usées | Examination procedure | 21.07.2015 | Amendment by applicant (claims and/or description) | 21.07.2015 | Examination requested [2015/35] | 15.01.2016 | Invitation to indicate the basis for amendments (Time limit: M01) | 11.03.2016 | Reply to an invitation to indicate the basis for amendments | 29.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2016 | Reply to a communication from the examining division | 17.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 30.03.2017 | Reply to a communication from the examining division | 16.05.2017 | Communication of intention to grant the patent | 08.09.2017 | Fee for grant paid | 08.09.2017 | Fee for publishing/printing paid | 08.09.2017 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP11715610.9 / EP2542333 | Divisional application(s) | EP17196707.8 / EP3308849 | Opposition(s) | 19.07.2018 | No opposition filed within time limit [2018/39] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 11.03.2016 | Request for further processing filed | 11.03.2016 | Full payment received (date of receipt of payment) Request granted | 23.03.2016 | Decision despatched | Fees paid | Renewal fee | 22.08.2014 | Renewal fee patent year 03 | 22.08.2014 | Renewal fee patent year 04 | 10.03.2015 | Renewal fee patent year 05 | 10.03.2016 | Renewal fee patent year 06 | 10.03.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.03.2011 | AL | 18.10.2017 | AT | 18.10.2017 | CY | 18.10.2017 | CZ | 18.10.2017 | EE | 18.10.2017 | FI | 18.10.2017 | HR | 18.10.2017 | LT | 18.10.2017 | LV | 18.10.2017 | MC | 18.10.2017 | MK | 18.10.2017 | PL | 18.10.2017 | RO | 18.10.2017 | RS | 18.10.2017 | SI | 18.10.2017 | SK | 18.10.2017 | SM | 18.10.2017 | BG | 18.01.2018 | GR | 19.01.2018 | IS | 18.02.2018 | LU | 03.03.2018 | MT | 03.03.2018 | CH | 31.03.2018 | LI | 31.03.2018 | [2020/34] |
Former [2020/31] | HU | 03.03.2011 | |
AT | 18.10.2017 | ||
CY | 18.10.2017 | ||
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
MK | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 03.03.2018 | ||
MT | 03.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
Former [2020/28] | HU | 03.03.2011 | |
AT | 18.10.2017 | ||
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 03.03.2018 | ||
MT | 03.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
Former [2020/08] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 03.03.2018 | ||
MT | 03.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
Former [2019/12] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 03.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
Former [2019/04] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 03.03.2018 | ||
Former [2018/52] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/40] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
PL | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/37] | AT | 18.10.2017 | |
CZ | 18.10.2017 | ||
EE | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
PL | 18.10.2017 | ||
RS | 18.10.2017 | ||
SK | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/24] | AT | 18.10.2017 | |
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
RS | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/22] | FI | 18.10.2017 | |
LT | 18.10.2017 | Documents cited: | Search | [A]US1947851 (JEWETT JOSEPH E) [A] 1-11 * page 1, lines 1-44 * * page 1, line 88 - page 2, line 14 * * page 2, line 141 - page 3, line 47 * * page 3, lines 137-148 * * figures 1-5 *; | [A]US2090384 (DURDIN AUGUSTUS C) [A] 1-11 * figure 1 *; | [X]US2987186 (BURGOON DAVID W, et al) [X] 1-11 * column 1, lines 10-52 * * column 2, line 50 - column 3, line 38 * * column 3, line 66 - column 6, line 31 * * figures 1-5 *; | [X]US3053390 (WOOD FRED J) [X] 1-11 * column 1, lines 7-31 * * column 2, line 12 - column 4, line 56 * * figures 1-7 *; | [X]US3207314 (PEARSON CHESTER H) [X] 1-11 * column 1, lines 8-18 * * column 1, line 43 - column 2, line 39 * * figure 1 *; | [X]WO9113034 (ETLIN VLADIMIR [US]) [X] 1-11 * page 3, lines 7-19 * * page 5, line 1 - page 7, line 15 * * page 8, line 18 - page 9, line 26 * * abstract *; | [A]US5525269 (CONNOLLY JOHN R [US], et al) [A] 1-11* abstract *; | [A]DE29703844U (SCHMALENBERGER GMBH & CO [DE]) [A] 1-11 * page 1, paragraph 1 * * page 5, paragraph 4 - page 7, paragraph 1 * * page 8, paragraph 3 * * figure 1 *; | [A]US5868172 (GRAVES JAN D [US]) [A] 1-11 * figures 1,2 *; | [X]WO2005093261 (VAN DEN BERG ZACHARIAS JOSEPH [ZA]) [X] 1-11 * page 1, lines 5-18 * * page 2, lines 16-22 * * page 3, line 1 - page 6, line 28 * * abstract * | Examination | US3984001 |