blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2853854

EP2853854 - Ballistic vest system with ballistic ridge component [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.04.2018
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  15.06.2017
FormerGrant of patent is intended
Status updated on  22.12.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
TYR Tactical, LLC
9330 N 91st Ave.
Peoria, AZ 85345 / US
[2017/50]
Former [2015/14]For all designated states
TYR Tactical, LLC
16661 N. 84th Avenue
Suite 110
Peoria, AZ 85382 / US
Inventor(s)01 / Beck, Jason
16661 N. 84th Avenue
Suite 110
Peoria, AZ Arizona 85382 / US
 [2015/14]
Representative(s)Glansdorp, Freija Gwendolyn, et al
Greaves Brewster LLP
Copa House
Station Road
Cheddar
Somerset BS27 3AH / GB
[2015/14]
Application number, filing date14186620.226.09.2014
[2015/14]
Priority number, dateUS201361883140P26.09.2013         Original published format: US 201361883140 P
[2015/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2853854
Date:01.04.2015
Language:EN
[2015/14]
Type: B1 Patent specification 
No.:EP2853854
Date:07.06.2017
Language:EN
[2017/23]
Search report(s)(Supplementary) European search report - dispatched on:EP22.01.2015
ClassificationIPC:F41H1/02
[2015/14]
CPC:
F41H1/02 (EP,US); A41D1/04 (US); A41D27/02 (US);
A41D31/04 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/46]
Former [2015/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Kugelsicheres Westensystem mit kugelsicherer "Rippe" Komponente[2015/14]
English:Ballistic vest system with ballistic ridge component[2015/14]
French:Système de gilet pare-balles avec composant balistique "crête"[2015/14]
Examination procedure01.10.2015Amendment by applicant (claims and/or description)
01.10.2015Examination requested  [2015/46]
19.02.2016Despatch of a communication from the examining division (Time limit: M06)
26.08.2016Reply to a communication from the examining division
23.12.2016Communication of intention to grant the patent
28.04.2017Fee for grant paid
28.04.2017Fee for publishing/printing paid
28.04.2017Receipt of the translation of the claim(s)
Opposition(s)08.03.2018No opposition filed within time limit [2018/20]
Fees paidRenewal fee
13.09.2016Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.09.2014
AL07.06.2017
AT07.06.2017
CY07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
MK07.06.2017
PL07.06.2017
PT07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
TR07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
[2020/34]
Former [2020/28]HU26.09.2014
AT07.06.2017
CY07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
MK07.06.2017
PL07.06.2017
PT07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
TR07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2020/15]HU26.09.2014
AT07.06.2017
CY07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
MK07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
TR07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2019/52]HU26.09.2014
AT07.06.2017
CY07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
MK07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2019/47]HU26.09.2014
AT07.06.2017
CY07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2019/31]HU26.09.2014
AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2018/43]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
MT26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2018/36]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2018/34]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IE26.09.2017
LU26.09.2017
CH30.09.2017
LI30.09.2017
IS07.10.2017
Former [2018/29]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
MC07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IS07.10.2017
Former [2018/25]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SI07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IS07.10.2017
Former [2018/11]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
IT07.06.2017
LT07.06.2017
LV07.06.2017
PL07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SK07.06.2017
SM07.06.2017
BG07.09.2017
GR08.09.2017
IS07.10.2017
Former [2018/10]AT07.06.2017
CZ07.06.2017
EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
LT07.06.2017
LV07.06.2017
RO07.06.2017
RS07.06.2017
SE07.06.2017
SK07.06.2017
BG07.09.2017
GR08.09.2017
Former [2018/09]EE07.06.2017
ES07.06.2017
FI07.06.2017
HR07.06.2017
LT07.06.2017
LV07.06.2017
RS07.06.2017
SE07.06.2017
BG07.09.2017
GR08.09.2017
Former [2017/50]ES07.06.2017
FI07.06.2017
HR07.06.2017
LT07.06.2017
LV07.06.2017
RS07.06.2017
SE07.06.2017
BG07.09.2017
GR08.09.2017
Former [2017/49]ES07.06.2017
FI07.06.2017
HR07.06.2017
LT07.06.2017
GR08.09.2017
Documents cited:Search[XYI]WO2011008319  (MINE SAFETY APPLIANCES CO [US], et al) [X] 1,2,5-7,9,10,13,15 * abstract * * paragraphs [0035] , [0036] , [0038] , [0043] , [0052] * * figures 3C,3F,4C,4F * [Y] 8 [I] 3,4,11,12,14;
 [Y]US2012180178  (GALLO MASSIMO ALEXANDRO [US]) [Y] 8 * figures 1,2,3A-3C *;
 [XI]WO2006040754  (GLASSCERAX LTD [IL], et al) [X] 1,5-7,9,10,13,15 * page 12, lines 18-27 * * page 15, lines 8-11 * * page 18, lines 10-18 * * page 19, line 19 - page 20, line 23 * * figures 3a,3b * [I] 2-4,11,12,14;
 [X]DE2344222  (FELDMUEHLE ANLAGEN PROD) [X] 1,7,9,13,15 * page 7 * * page 8, paragraph last * * figures 1-7 *;
 [XI]DE10030747  (WARWICK MILLS INC [US]) [X] 13,15 * column 1, lines 13-15,49-51 * * column 9, line 61 - column 10, line 34 * * figures 11,12a,12b * [I] 14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.