EP2979126 - IMPROVEMENTS IN AND RELATING TO DISPLAYS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.10.2023 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 28.10.2022 | ||
Former | Grant of patent is intended Status updated on 23.05.2022 | ||
Former | Examination is in progress Status updated on 08.07.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Snap Inc. 3000 31st Street Santa Monica, California 60405 / US | [2022/47] |
Former [2016/05] | For all designated states BAE SYSTEMS plc 6 Carlton Gardens London SW1Y 5AD / GB | Inventor(s) | 01 /
VALERA, Mohmed, Salim Santa Monica, California 60405 / GB | 02 /
SIMMONDS, Michael, David Santa Monica, California 60405 / GB | [2022/48] |
Former [2016/05] | 01 /
VALERA, Mohmed, Salim BAE SYSTEMS Airport Works Rochester Kent ME1 2XX / GB | ||
02 /
SIMMONDS, Michael, David BAE SYSTEMS Airport Works Rochester Kent ME1 2XX / GB | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2022/48] |
Former [2016/05] | BAE SYSTEMS plc Group IP Department Farnborough Aerospace Centre Farnborough Hampshire GU14 6YU / GB | Application number, filing date | 14712754.2 | 25.03.2014 | [2016/05] | WO2014GB50942 | Priority number, date | GB20130005691 | 28.03.2013 Original published format: GB 201305691 | EP20130275083 | 28.03.2013 Original published format: EP 13275083 | [2016/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014155096 | Date: | 02.10.2014 | Language: | EN | [2014/40] | Type: | A1 Application with search report | No.: | EP2979126 | Date: | 03.02.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.10.2014 takes the place of the publication of the European patent application. | [2016/05] | Type: | B1 Patent specification | No.: | EP2979126 | Date: | 30.11.2022 | Language: | EN | [2022/48] | Search report(s) | International search report - published on: | EP | 02.10.2014 | Classification | IPC: | G02B27/01, G02B27/00, // G02B5/04, F21V8/00 | [2022/19] | CPC: |
G02B27/0101 (EP,US);
G02B27/0081 (EP,US);
G02B27/0172 (EP,US);
G02B6/0031 (US);
G02B6/005 (EP,US);
G02B6/0053 (EP,US);
G02B6/0055 (US);
G02B6/0056 (EP,US);
G02B2027/0116 (EP,US);
|
Former IPC [2016/05] | G02B27/01, G02B27/00, F21V8/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/44] |
Former [2016/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERBESSERUNGEN VON UND IN ZUSAMMENHANG MIT ANZEIGEN | [2022/19] | English: | IMPROVEMENTS IN AND RELATING TO DISPLAYS | [2016/05] | French: | AMÉLIORATIONS DE ET ASSOCIÉES À DES AFFICHAGES | [2022/19] |
Former [2016/05] | VERBESSERUNGEN AN UND IM ZUSAMMENHANG MIT ANZEIGEN | ||
Former [2016/05] | PERFECTIONNEMENTS APPORTÉS OU SE RAPPORTANT À DES AFFICHAGES | Entry into regional phase | 27.10.2015 | National basic fee paid | 27.10.2015 | Designation fee(s) paid | 27.10.2015 | Examination fee paid | Examination procedure | 27.10.2015 | Examination requested [2016/05] | 22.06.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 01.09.2016 | Amendment by applicant (claims and/or description) | 11.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 21.11.2019 | Reply to a communication from the examining division | 30.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 08.09.2021 | Reply to a communication from the examining division | 24.05.2022 | Communication of intention to grant the patent | 29.09.2022 | Fee for grant paid | 29.09.2022 | Fee for publishing/printing paid | 29.09.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.07.2019 | Opposition(s) | 31.08.2023 | No opposition filed within time limit [2023/45] | Request for further processing for: | 01.09.2016 | Request for further processing filed | 01.09.2016 | Full payment received (date of receipt of payment) Request granted | 16.09.2016 | Decision despatched | Fees paid | Renewal fee | 25.03.2016 | Renewal fee patent year 03 | 24.03.2017 | Renewal fee patent year 04 | 29.03.2018 | Renewal fee patent year 05 | 29.03.2019 | Renewal fee patent year 06 | 27.03.2020 | Renewal fee patent year 07 | 29.03.2021 | Renewal fee patent year 08 | 25.03.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 30.11.2022 | AT | 30.11.2022 | BG | 30.11.2022 | CZ | 30.11.2022 | DK | 30.11.2022 | EE | 30.11.2022 | ES | 30.11.2022 | FI | 30.11.2022 | HR | 30.11.2022 | IT | 30.11.2022 | LT | 30.11.2022 | LV | 30.11.2022 | MC | 30.11.2022 | PL | 30.11.2022 | RO | 30.11.2022 | RS | 30.11.2022 | SE | 30.11.2022 | SI | 30.11.2022 | SK | 30.11.2022 | SM | 30.11.2022 | NO | 28.02.2023 | GR | 01.03.2023 | IE | 25.03.2023 | LU | 25.03.2023 | IS | 30.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | PT | 31.03.2023 | [2024/51] |
Former [2024/26] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
IT | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IE | 25.03.2023 | ||
LU | 25.03.2023 | ||
IS | 30.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
PT | 31.03.2023 | ||
Former [2024/12] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IE | 25.03.2023 | ||
LU | 25.03.2023 | ||
IS | 30.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
PT | 31.03.2023 | ||
Former [2024/09] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IE | 25.03.2023 | ||
LU | 25.03.2023 | ||
IS | 30.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
PT | 31.03.2023 | ||
Former [2024/08] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IE | 25.03.2023 | ||
LU | 25.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2024/02] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
LU | 25.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/51] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SI | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/48] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
MC | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/38] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SK | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/37] | AL | 30.11.2022 | |
AT | 30.11.2022 | ||
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/35] | AT | 30.11.2022 | |
CZ | 30.11.2022 | ||
DK | 30.11.2022 | ||
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RO | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/34] | DK | 30.11.2022 | |
EE | 30.11.2022 | ||
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/33] | DK | 30.11.2022 | |
ES | 30.11.2022 | ||
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
SM | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/26] | ES | 30.11.2022 | |
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
PL | 30.11.2022 | ||
RS | 30.11.2022 | ||
SE | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
IS | 30.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/24] | ES | 30.11.2022 | |
FI | 30.11.2022 | ||
HR | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
SE | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/23] | ES | 30.11.2022 | |
FI | 30.11.2022 | ||
LT | 30.11.2022 | ||
LV | 30.11.2022 | ||
SE | 30.11.2022 | ||
NO | 28.02.2023 | ||
GR | 01.03.2023 | ||
PT | 31.03.2023 | ||
Former [2023/22] | ES | 30.11.2022 | |
FI | 30.11.2022 | ||
LT | 30.11.2022 | ||
SE | 30.11.2022 | ||
NO | 28.02.2023 | ||
PT | 31.03.2023 | ||
Former [2023/20] | LT | 30.11.2022 | |
NO | 28.02.2023 | Cited in | International search | [XA]EP1385023 (FIAT RICERCHE [IT]) [X] 10,11 * paragraph [0017] - paragraph [0051]; figures 1-8 * [A] 1-3,5-8,12-15; | [XI]EP1748305 (NIKON CORP [JP]) [X] 1-3,5-7,10-15 * paragraph [0103] - paragraph [0109]; figure 34 * [I] 4,8,9; | [XI]US2010111472 (DEJONG CHRISTIAN DEAN [US]) [X] 1-3,5-8,10-15 * paragraph [0038] - paragraph [0046]; figures 3-4 * * paragraph [0058] - paragraph [0061]; figures 9-10 * [I] 4,9; | [XP]US8665178 (WANG CHIA-JEAN [US]) [XP] 1-3,7,8,10-13 * column 2, line 10 - column 5, line 43; figures 1-3 ** figures 4, 5 * |