EP2987102 - METHOD OF MODELING A WORKPIECE, IN PARTUCILAR A TURBINE BLADE [Right-click to bookmark this link] | |||
Former [2016/08] | METHOD FOR MODELLING A PART, IN PARTICULAR A TURBINE BLADE | ||
[2021/45] | Status | No opposition filed within time limit Status updated on 02.12.2022 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 24.12.2021 | ||
Former | Grant of patent is intended Status updated on 03.11.2021 | ||
Former | Examination is in progress Status updated on 21.12.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Safran Aircraft Engines 2 boulevard du Général Martial Valin 75015 Paris / FR | [2018/28] |
Former [2016/08] | For all designated states Snecma 2 Boulevard du Général Martial Valin 75015 Paris / FR | Inventor(s) | 01 /
CELLIER, Damien, Joseph c/o Snecma PI (AJI) Rond-Point René Ravaud - Réau F-77550 Moissy-Cramayel Cedex / FR | 02 /
PERROT, Vincent, Paul, Gabriel c/o Snecma PI (AJI) Rond-Point René Ravaud - Réau F-77550 Moissy-Cramayel Cedex / FR | [2016/08] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2016/08] | Application number, filing date | 14722281.4 | 16.04.2014 | [2016/08] | WO2014FR50934 | Priority number, date | FR20130053439 | 16.04.2013 Original published format: FR 1353439 | [2016/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014170612 | Date: | 23.10.2014 | Language: | FR | [2014/43] | Type: | A1 Application with search report | No.: | EP2987102 | Date: | 24.02.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 23.10.2014 takes the place of the publication of the European patent application. | [2016/08] | Type: | B1 Patent specification | No.: | EP2987102 | Date: | 26.01.2022 | Language: | FR | [2022/04] | Search report(s) | International search report - published on: | EP | 23.10.2014 | Classification | IPC: | F01D5/14, G06F30/20, // G06F113/28 | [2021/45] | CPC: |
F01D5/14 (EP,US);
G06F30/00 (RU,US);
G06F30/15 (US);
F01D5/141 (US);
F01D9/041 (US);
G06F30/20 (EP,US);
F05D2220/30 (US);
F05D2260/81 (US);
G06F2113/28 (EP);
Y02T50/60 (EP,US)
(-)
|
Former IPC [2016/08] | G06F17/50, F01D5/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM MODELLIEREN EINES BAUTEILS, INSBESONDERE EINER TURBINENSCHAUFEL | [2021/45] | English: | METHOD OF MODELING A WORKPIECE, IN PARTUCILAR A TURBINE BLADE | [2021/45] | French: | PROCÉDÉ DE MODÉLISATION D'UNE PIÈCE, EN PARTICULIER UN AUBAGE | [2016/08] |
Former [2016/08] | VERFAHREN ZUR MODELLIERUNG EINES TEILS, INSBESONDERE EINER TURBINENSCHAUFEL | ||
Former [2016/08] | METHOD FOR MODELLING A PART, IN PARTICULAR A TURBINE BLADE | Entry into regional phase | 13.11.2015 | National basic fee paid | 13.11.2015 | Designation fee(s) paid | 13.11.2015 | Examination fee paid | Examination procedure | 13.11.2015 | Examination requested [2016/08] | 01.06.2016 | Amendment by applicant (claims and/or description) | 20.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 18.04.2019 | Reply to a communication from the examining division | 07.10.2021 | Cancellation of oral proceeding that was planned for 15.10.2021 | 15.10.2021 | Date of oral proceedings (cancelled) | 04.11.2021 | Communication of intention to grant the patent | 21.12.2021 | Fee for grant paid | 21.12.2021 | Fee for publishing/printing paid | 21.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 27.10.2022 | No opposition filed within time limit [2023/01] | Fees paid | Renewal fee | 21.03.2016 | Renewal fee patent year 03 | 25.04.2017 | Renewal fee patent year 04 | 25.04.2018 | Renewal fee patent year 05 | 18.04.2019 | Renewal fee patent year 06 | 17.03.2020 | Renewal fee patent year 07 | 21.04.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.04.2014 | AL | 26.01.2022 | AT | 26.01.2022 | CY | 26.01.2022 | CZ | 26.01.2022 | DK | 26.01.2022 | EE | 26.01.2022 | ES | 26.01.2022 | FI | 26.01.2022 | HR | 26.01.2022 | LT | 26.01.2022 | LV | 26.01.2022 | MC | 26.01.2022 | MK | 26.01.2022 | NL | 26.01.2022 | PL | 26.01.2022 | RO | 26.01.2022 | RS | 26.01.2022 | SI | 26.01.2022 | SK | 26.01.2022 | SM | 26.01.2022 | IE | 16.04.2022 | LU | 16.04.2022 | BG | 26.04.2022 | NO | 26.04.2022 | GR | 27.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | IS | 26.05.2022 | PT | 26.05.2022 | [2024/22] |
Former [2024/20] | HU | 16.04.2014 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 16.04.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2024/18] | HU | 16.04.2014 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 16.04.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/20] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 16.04.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/10] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/09] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/08] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
LU | 16.04.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/06] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/01] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/49] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/48] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/47] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/46] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/42] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/39] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/36] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/35] | ES | 26.01.2022 | |
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/34] | ES | 26.01.2022 | |
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/33] | LT | 26.01.2022 | |
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
Former [2022/30] | NL | 26.01.2022 | Cited in | International search | [I]WO2007011355 (HONEYWELL INT INC [US], et al); |