EP2979379 - METHOD FOR TIME SYNCHRONISATION IN A COMMUNICATION NETWORK WITH A PLURALITY OF NODES [Right-click to bookmark this link] | |||
Former [2016/05] | METHOD FOR TIME-SYNCHRONISATION IN A COMMUNICATIONS NETWORK WITH A PLURALITY OF NETWORK NODES | ||
[2021/49] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 22.11.2021 | ||
Former | Examination is in progress Status updated on 17.12.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2017/35] |
Former [2016/05] | For all designated states Siemens Aktiengesellschaft Wittelsbacherplatz 2 80333 München / DE | Inventor(s) | 01 /
ARMBRUSTER, Michael Heimeranstrasse 2 80339 München / DE | 02 /
BUHL, Michael, Bernhard Rotwandstr. 10a 85567 Grafing / DE | 03 /
OBRADOVIC, Dragan Unterhachinger 22 85521 Ottobrunn / DE | [2016/05] | Representative(s) | Siemens Patent Attorneys Postfach 22 16 34 80506 München / DE | [N/P] | Application number, filing date | 14728121.6 | 23.05.2014 | [2016/05] | WO2014EP60699 | Priority number, date | DE201310210775 | 10.06.2013 Original published format: DE102013210775 | [2016/05] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014198517 | Date: | 18.12.2014 | Language: | DE | [2014/51] | Type: | A1 Application with search report | No.: | EP2979379 | Date: | 03.02.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.12.2014 takes the place of the publication of the European patent application. | [2016/05] | Type: | B1 Patent specification | No.: | EP2979379 | Date: | 30.03.2022 | Language: | DE | [2022/13] | Search report(s) | International search report - published on: | EP | 18.12.2014 | Classification | IPC: | H04J3/06, H04J3/14 | [2016/05] | CPC: |
H04J3/0638 (EP,US);
G06F1/10 (US);
H04J3/14 (EP,US);
H04J3/0667 (EP,US);
H04J3/0673 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR ZEITSYNCHRONISATION IN EINEM KOMMUNIKATIONSNETZ MIT EINER VIELZAHL VON NETZKNOTEN | [2016/05] | English: | METHOD FOR TIME SYNCHRONISATION IN A COMMUNICATION NETWORK WITH A PLURALITY OF NODES | [2021/49] | French: | PROCÉDÉ DE SYNCHRONISATION D'HORLOGE DANS UN RÉSEAU DE COMMUNICATION AVEC PLUSIEURS NOEDS | [2021/49] |
Former [2016/05] | METHOD FOR TIME-SYNCHRONISATION IN A COMMUNICATIONS NETWORK WITH A PLURALITY OF NETWORK NODES | ||
Former [2016/05] | PROCÉDÉ DE SYNCHRONISATION TEMPORELLE DANS UN RÉSEAU DE COMMUNICATION COMPRENANT UNE PLURALITÉ DE N UDS DE RÉSEAU | Entry into regional phase | 30.10.2015 | National basic fee paid | 30.10.2015 | Designation fee(s) paid | 30.10.2015 | Examination fee paid | Examination procedure | 30.10.2015 | Examination requested [2016/05] | 18.11.2015 | Amendment by applicant (claims and/or description) | 20.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.04.2020 | Reply to a communication from the examining division | 22.10.2021 | Cancellation of oral proceeding that was planned for 07.12.2021 | 23.11.2021 | Communication of intention to grant the patent | 07.12.2021 | Date of oral proceedings (cancelled) | 16.02.2022 | Receipt of the translation of the claim(s) | 17.02.2022 | Fee for grant paid | 17.02.2022 | Fee for publishing/printing paid | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Fees paid | Renewal fee | 20.05.2016 | Renewal fee patent year 03 | 19.05.2017 | Renewal fee patent year 04 | 18.05.2018 | Renewal fee patent year 05 | 17.05.2019 | Renewal fee patent year 06 | 19.05.2020 | Renewal fee patent year 07 | 19.05.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.05.2014 | AL | 30.03.2022 | CY | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | ES | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | MC | 30.03.2022 | MK | 30.03.2022 | MT | 30.03.2022 | NL | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | AT | 23.05.2022 | IE | 23.05.2022 | LU | 23.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 30.06.2022 | GB | 30.06.2022 | NO | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | [2024/41] |
Former [2024/22] | HU | 23.05.2014 | |
AL | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
MK | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
AT | 23.05.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GB | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2024/20] | HU | 23.05.2014 | |
AL | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
AT | 23.05.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GB | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2024/18] | HU | 23.05.2014 | |
AL | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
AT | 23.05.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GB | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/35] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
AT | 23.05.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GB | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/27] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GB | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/25] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/20] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 23.05.2022 | ||
LU | 23.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/09] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 23.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/08] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 23.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/06] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | ES | 30.03.2022 | |
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/44] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | |
NO | 30.06.2022 | Cited in | International search | [A]US2013100832 (FLINN JASSON [CA], et al) [A] 4 * paragraph [0026] - paragraph [0027]; figure 1 *; | [I] - "7. Clock synchronization model for a bridged local area network (Informative) ; as-mjt-clause-7-d0-1009", IEEE DRAFT; AS-MJT-CLAUSE-7-D0-1009, IEEE-SA, PISCATAWAY, NJ USA, (20091014), vol. 802.1, no. d0-1009, pages 1 - 8, XP068007692 [I] 1-15 * paragraph [07.1] - paragraph [07.3]; figures 7-1, 7-2 * * paragraph [7.3.3] * | [A] - MICHEL OUELLETTE ET AL, "Simulations of a chain of Telecom Boundary Clocks combined with Synchronous Ethernet for phase/time transfer", PRECISION CLOCK SYNCHRONIZATION FOR MEASUREMENT CONTROL AND COMMUNICATION (ISPCS), 2011 INTERNATIONAL IEEE SYMPOSIUM ON, IEEE, (20110912), doi:10.1109/ISPCS.2011.6070143, ISBN 978-1-61284-893-8, pages 105 - 113, XP031974494 [A] 1-15 * page 3, column l, paragraph l - page 4, column l, paragraph 4 * DOI: http://dx.doi.org/10.1109/ISPCS.2011.6070143 | [A] - "Epsilon Synchronization Supply Unit Model ESSU", (20120723), pages 1 - 3, URL: http://www.spectracomcorp.com/Portals/0/products/pdf/Epsilon_Model_ESSU.pdf, (20140730), XP055132496 [A] 1,14 * the whole document * | [A] - JASPERNEITE J ET AL, "Enhancements to the time synchronization standard IEEE-1588 for a system of cascaded bridges", FACTORY COMMUNICATION SYSTEMS, 2004. PROCEEDINGS. 2004 IEEE INTERNATIO NAL WORKSHOP ON VIENNA, AUSTRIA SEPT. 22-24, 2004, PISCATAWAY, NJ, USA,IEEE, (20040922), doi:10.1109/WFCS.2004.1377716, ISBN 978-0-7803-8734-8, pages 239 - 244, XP010756406 [A] 1,14 * page 241, column l, paragraph 3; figure 3 * DOI: http://dx.doi.org/10.1109/WFCS.2004.1377716 | Examination | US2010098202 | - "Dual Time Scale in Factory & Energy Automation ; as-goetz-ind-req-0712-v2", IEEE DRAFT; AS-GOETZ-IND-REQ-0712-V2, IEEE-SA, PISCATAWAY, NJ USA, (20120716), vol. 802.1, no. v2, pages 1 - 26, XP068008500 | - YASUYUKI KOZAKAI ET AL, "Keeping clock accuracy on a master clock failure in substation network", PRECISION CLOCK SYNCHRONIZATION FOR MEASUREMENT CONTROL AND COMMUNICATION (ISPCS), 2010 INTERNATIONAL IEEE SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20100927), ISBN 978-1-4244-5978-0, pages 25 - 29, XP031780883 |