EP3022014 - METHOD FOR THE CENTRELESS GRINDING OF SHAFT PARTS, IN PARTICULAR OF TUBES FOR ASSEMBLED CAMSHAFTS [Right-click to bookmark this link] | |||
Former [2016/21] | METHOD FOR THE CENTRELESS GRINDING OF SHAFT PARTS, IN PARTICULAR OF TUBES FOR ASSEMBLED CAMSHAFTS, AND GRINDING-WHEEL AND REGULATING-WHEEL PAIR PROVIDED FOR THIS PURPOSE | ||
[2019/29] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 11.07.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Erwin Junker Grinding Technology a.s. Ripská 863 27601 Mélník / CZ | [2016/21] | Inventor(s) | 01 /
JUNKER, Erwin Kappelwindeckstraße 95d 77815 Bühl / DE | [2016/21] | Representative(s) | Leske, Thomas FROHWITTER Patent- und Rechtsanwälte Possartstr. 20 81679 München / DE | [2016/21] | Application number, filing date | 14731228.4 | 16.06.2014 | [2016/21] | WO2014EP62525 | Priority number, date | DE201310214226 | 19.07.2013 Original published format: DE102013214226 | [2016/21] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015007444 | Date: | 22.01.2015 | Language: | DE | [2015/03] | Type: | A1 Application with search report | No.: | EP3022014 | Date: | 25.05.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 22.01.2015 takes the place of the publication of the European patent application. | [2016/21] | Type: | B1 Patent specification | No.: | EP3022014 | Date: | 23.10.2019 | Language: | DE | [2019/43] | Search report(s) | International search report - published on: | EP | 22.01.2015 | Classification | IPC: | B24B5/28, B24B5/22, B24B5/24 | [2016/21] | CPC: |
B24B5/30 (EP,US);
B24B5/22 (EP,RU,US);
B24B5/24 (EP,US);
B24B5/28 (EP,RU,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM CENTERLESS-SCHLEIFEN VON WELLENTEILEN, INSBESONDERE VON ROHREN FÜR GEBAUTE NOCKENWELLEN | [2019/29] | English: | METHOD FOR THE CENTRELESS GRINDING OF SHAFT PARTS, IN PARTICULAR OF TUBES FOR ASSEMBLED CAMSHAFTS | [2019/29] | French: | PROCÉDÉ DE RECTIFICATION CENTERLESS DE PARTIES D'ARBRES, NOTAMMENT DE TUBES POUR ARBRES À CAMES ASSEMBLÉS | [2019/29] |
Former [2016/21] | VERFAHREN ZUM CENTERLESS-SCHLEIFEN VON WELLENTEILEN, INSBESONDERE VON ROHREN FÜR GEBAUTE NOCKENWELLEN, SOWIE DAFÜR VORGESEHENES SCHLEIFSCHEIBEN- UND REGELSCHEIBENPAAR | ||
Former [2016/21] | METHOD FOR THE CENTRELESS GRINDING OF SHAFT PARTS, IN PARTICULAR OF TUBES FOR ASSEMBLED CAMSHAFTS, AND GRINDING-WHEEL AND REGULATING-WHEEL PAIR PROVIDED FOR THIS PURPOSE | ||
Former [2016/21] | PROCÉDÉ DE RECTIFICATION CENTERLESS DE PARTIES D'ARBRES, NOTAMMENT DE TUBES POUR ARBRES À CAMES ASSEMBLÉS, AINSI QUE PAIRE CONSTITUÉE D'UNE MEULE DE RECTIFICATION ET D'UNE MEULE DE RÉGLAGE PRÉVUE À CET EFFET | Entry into regional phase | 28.01.2016 | National basic fee paid | 28.01.2016 | Designation fee(s) paid | 28.01.2016 | Examination fee paid | Examination procedure | 28.01.2016 | Amendment by applicant (claims and/or description) | 28.01.2016 | Examination requested [2016/21] | 11.07.2019 | Communication of intention to grant the patent | 09.09.2019 | Fee for grant paid | 09.09.2019 | Fee for publishing/printing paid | 09.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 28.06.2016 | Renewal fee patent year 03 | 29.06.2017 | Renewal fee patent year 04 | 27.06.2018 | Renewal fee patent year 05 | 25.06.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2014 | AL | 23.10.2019 | CY | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | AT | 16.06.2020 | GB | 16.06.2020 | IE | 16.06.2020 | LU | 16.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | FR | 30.06.2020 | LI | 30.06.2020 | [2022/32] |
Former [2022/27] | HU | 16.06.2014 | |
AL | 23.10.2019 | ||
CY | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
AT | 16.06.2020 | ||
GB | 16.06.2020 | ||
IE | 16.06.2020 | ||
LU | 16.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/46] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
AT | 16.06.2020 | ||
GB | 16.06.2020 | ||
IE | 16.06.2020 | ||
LU | 16.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/23] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
GB | 16.06.2020 | ||
IE | 16.06.2020 | ||
LU | 16.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/22] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
GB | 16.06.2020 | ||
IE | 16.06.2020 | ||
LU | 16.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/20] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
IE | 16.06.2020 | ||
LU | 16.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/15] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
LU | 16.06.2020 | ||
Former [2021/12] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | FI | 23.10.2019 | |
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Cited in | International search | [A]US3418763 (SODERQUIST JOHN ERIC V); | [X]JPS6025640 (TOYODA MACHINE WORKS LTD) | Examination | JP2004167610 |