EP3014871 - GENERATING A VIDEO PANE LAYOUT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.10.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 29.10.2021 | ||
Former | Grant of patent is intended Status updated on 08.07.2021 | ||
Former | Examination is in progress Status updated on 11.06.2021 | ||
Former | Grant of patent is intended Status updated on 09.03.2021 | ||
Former | Examination is in progress Status updated on 04.06.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 West Tasman Drive San Jose, CA 95134 / US | [2016/18] | Inventor(s) | 01 /
HANSEN, Robert c/o Cisco Systems Limited 14 Waterside Drive Langley Slough Berkshire SL3 6EZ / GB | 02 /
WALTERS, Malcolm 2 Ashenden Close Abingdon OX14 1QE / GB | 03 /
BERGER, Espen Jolly Kramer Johansens Gate 2 0475 Oslo / NO | 04 /
STAURNES, Jarl Asbjorn Klostersvei 11 1472 Fjellhamar / NO | [2016/18] | Representative(s) | Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2021/48] |
Former [2016/18] | Kazi, Ilya Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 14740016.2 | 17.06.2014 | [2016/18] | WO2014US42664 | Priority number, date | US201361840294P | 27.06.2013 Original published format: US 201361840294 P | US201314134559 | 19.12.2013 Original published format: US201314134559 | [2016/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014209670 | Date: | 31.12.2014 | Language: | EN | [2014/53] | Type: | A1 Application with search report | No.: | EP3014871 | Date: | 04.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.12.2014 takes the place of the publication of the European patent application. | [2016/18] | Type: | B1 Patent specification | No.: | EP3014871 | Date: | 01.12.2021 | Language: | EN | [2021/48] | Search report(s) | International search report - published on: | EP | 31.12.2014 | Classification | IPC: | H04N7/15, H04N21/2343 | [2016/18] | CPC: |
H04N7/15 (EP,US);
H04N7/152 (US);
H04N21/234363 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ERZEUGUNG EINES VIDEOFENSTERLAYOUTS | [2021/13] | English: | GENERATING A VIDEO PANE LAYOUT | [2016/18] | French: | GÉNÉRATION DE PRÉSENTATION DE SOUS-FENÊTRES VIDÉO | [2016/18] |
Former [2016/18] | ERZEUGUNG EINES VIDEOSCHEIBENLAYOUTS | Entry into regional phase | 09.10.2015 | National basic fee paid | 09.10.2015 | Designation fee(s) paid | 09.10.2015 | Examination fee paid | Examination procedure | 09.10.2015 | Examination requested [2016/18] | 15.08.2016 | Amendment by applicant (claims and/or description) | 07.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 10.10.2019 | Reply to a communication from the examining division | 07.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 04.03.2020 | Reply to a communication from the examining division | 19.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 28.07.2020 | Reply to a communication from the examining division | 10.03.2021 | Communication of intention to grant the patent | 09.06.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.07.2021 | Communication of intention to grant the patent | 25.10.2021 | Fee for grant paid | 25.10.2021 | Fee for publishing/printing paid | 25.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.09.2022 | No opposition filed within time limit [2022/45] | Fees paid | Renewal fee | 27.06.2016 | Renewal fee patent year 03 | 27.06.2017 | Renewal fee patent year 04 | 27.06.2018 | Renewal fee patent year 05 | 27.06.2019 | Renewal fee patent year 06 | 29.06.2020 | Renewal fee patent year 07 | 28.06.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.06.2014 | AL | 01.12.2021 | AT | 01.12.2021 | CY | 01.12.2021 | CZ | 01.12.2021 | DK | 01.12.2021 | EE | 01.12.2021 | ES | 01.12.2021 | FI | 01.12.2021 | HR | 01.12.2021 | IT | 01.12.2021 | LT | 01.12.2021 | LV | 01.12.2021 | MC | 01.12.2021 | MK | 01.12.2021 | MT | 01.12.2021 | PL | 01.12.2021 | RO | 01.12.2021 | RS | 01.12.2021 | SE | 01.12.2021 | SI | 01.12.2021 | SK | 01.12.2021 | SM | 01.12.2021 | TR | 01.12.2021 | BG | 01.03.2022 | NO | 01.03.2022 | GR | 02.03.2022 | IS | 01.04.2022 | PT | 01.04.2022 | IE | 17.06.2022 | LU | 17.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | FR | 30.06.2022 | LI | 30.06.2022 | [2024/41] |
Former [2024/29] | HU | 17.06.2014 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
MK | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
TR | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/22] | HU | 17.06.2014 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
MK | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/20] | HU | 17.06.2014 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/18] | HU | 17.06.2014 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/22] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
LU | 17.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/20] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
IE | 17.06.2022 | ||
Former [2023/08] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/01] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/49] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/46] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/42] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/35] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/34] | AT | 01.12.2021 | |
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/33] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/25] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/24] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/23] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/22] | AT | 01.12.2021 | |
FI | 01.12.2021 | ||
LT | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/21] | AT | 01.12.2021 | |
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/19] | BG | 01.03.2022 | Cited in | International search | [X]WO2009152158 (VIDYO INC [US], et al) [X] 1-20 * abstract * * page 6, line 20 - page 9, line 5 * * page 20, lines 8-15 * * page 26, line 2 - page 32, line 19 *; | [A]US2013091290 (HIROKAWA YOHEI [JP], et al) [A] 1-20 * abstract * * paragraph [0023] ** paragraphs [0029] - [0035] * |