EP3024869 - METHOD FOR MANUFACTURING POLYISOCYANATES AND THEIR APPLICATION [Right-click to bookmark this link] | |||
Former [2016/22] | METHOD FOR PRODUCING POLYISOCYANATES AND USE OF SAID POLYISOCYANATES | ||
[2020/02] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Examination is in progress Status updated on 01.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Covestro Deutschland AG Kaiser-Wilhelm-Allee 60 51373 Leverkusen / DE | [2016/22] | Inventor(s) | 01 /
RICHTER, Frank Heymannstrasse 40 51373 Leverkusen / DE | 02 /
HALPAAP, Reihard In der Hildscheid 6 51519 Odenthal / DE | [2016/22] | Representative(s) | Levpat c/o Covestro AG Gebäude 4825 51365 Leverkusen / DE | [2020/19] |
Former [2016/22] | Levpat c/o Covestro AG Alfred-Nobel-Straße 10 40789 Monheim am Rhein / DE | Application number, filing date | 14741319.9 | 21.07.2014 | [2016/22] | WO2014EP65576 | Priority number, date | EP20130177979 | 25.07.2013 Original published format: EP 13177979 | [2016/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015011069 | Date: | 29.01.2015 | Language: | DE | [2015/04] | Type: | A1 Application with search report | No.: | EP3024869 | Date: | 01.06.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 29.01.2015 takes the place of the publication of the European patent application. | [2016/22] | Type: | B1 Patent specification | No.: | EP3024869 | Date: | 06.05.2020 | Language: | DE | [2020/19] | Search report(s) | International search report - published on: | EP | 29.01.2015 | Classification | IPC: | C08G18/78, C07D273/04, C08G18/79, C08G18/02, C08G18/09 | [2016/22] | CPC: |
C07D273/04 (EP,US);
C08G18/027 (US);
C08G18/02 (EP,US);
C08G18/022 (EP,US);
C08G18/09 (EP,US);
C08G18/092 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON POLYISOCYANATEN UND DEREN VERWENDUNG | [2016/22] | English: | METHOD FOR MANUFACTURING POLYISOCYANATES AND THEIR APPLICATION | [2020/02] | French: | PROCÉDÉ DE FABRICATION DE POLYISOCYANATES ET LEUR UTILISATION | [2020/02] |
Former [2016/22] | METHOD FOR PRODUCING POLYISOCYANATES AND USE OF SAID POLYISOCYANATES | ||
Former [2016/22] | PROCÉDÉ DE PRODUCTION DE POLYISOCYANATES ET UTILISATION DESDITS POLYISOCYANATES | Entry into regional phase | 25.02.2016 | National basic fee paid | 25.02.2016 | Designation fee(s) paid | 25.02.2016 | Examination fee paid | Examination procedure | 25.02.2016 | Examination requested [2016/22] | 06.09.2016 | Amendment by applicant (claims and/or description) | 30.08.2017 | Despatch of a communication from the examining division (Time limit: M06) | 08.03.2018 | Reply to a communication from the examining division | 08.01.2020 | Communication of intention to grant the patent | 24.03.2020 | Fee for grant paid | 24.03.2020 | Fee for publishing/printing paid | 24.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 11.07.2016 | Renewal fee patent year 03 | 12.07.2017 | Renewal fee patent year 04 | 11.07.2018 | Renewal fee patent year 05 | 15.07.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.07.2014 | AL | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | ES | 06.05.2020 | FI | 06.05.2020 | HR | 06.05.2020 | IT | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | MT | 06.05.2020 | NL | 06.05.2020 | PL | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SE | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | TR | 06.05.2020 | AT | 21.07.2020 | IE | 21.07.2020 | LU | 21.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | BG | 06.08.2020 | GB | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | [2022/32] |
Former [2022/27] | HU | 21.07.2014 | |
AL | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
MT | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
TR | 06.05.2020 | ||
AT | 21.07.2020 | ||
IE | 21.07.2020 | ||
LU | 21.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
GB | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/47] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
AT | 21.07.2020 | ||
IE | 21.07.2020 | ||
LU | 21.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
GB | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/38] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
IE | 21.07.2020 | ||
LU | 21.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
GB | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/37] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
IE | 21.07.2020 | ||
LU | 21.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
LU | 21.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/20] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
LU | 21.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/13] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Cited in | International search | [XD]EP0339396 (BAYER AG [DE]) [XD] 14 * example 5 *; | [XD]EP0379914 (BAYER AG [DE]) [XD] 1,5,6,9-15 * page 4, lines 29-33; examples 1,2,6 *; | [XD]EP0447074 (ASAHI DENKA KOGYO KK [JP]) [XD] 14* example 3 *; | [XDI]EP0962455 (BAYER AG [DE]) [XD] 1,5-15 * examples 3-4; table 1 * [I] 2-4; | [X]EP1645577 (BAYER MATERIALSCIENCE AG [DE]) [X] 1,5-15 * examples 1,5; table 1 * |