EP3020059 - ELECTRONIC PROTECTION CIRCUIT AND METHOD OF CONTROLLING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 09.03.2020 | ||
Former | Examination is in progress Status updated on 14.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Eaton Intelligent Power Limited 30 Pembroke Road Dublin 4 / IE | [2020/45] |
Former [2016/20] | For all designated states Eaton Corporation 1000 Eaton Boulevard Cleveland, OH 44122 / US | Inventor(s) | 01 /
SU, Nan Zanye Road 15 8 501 SIP Suzhou Jiangsu 215121 / CN | 02 /
XIN, Jiankun Longxi Road Longxi Xincun 28-204 Suzhou Jiangsu 215121 / CN | 03 /
CHEN, Zhenbo Louyang Road 2 SIP Suzhou Jiangsu 215121 / CN | 04 /
CHEN, Yibo Louyang Road 2 SIP Suzhou Jiangsu 215121 / CN | [2016/20] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [N/P] |
Former [2020/31] | Emde, Eric Wagner & Geyer Partnerschaft mbB Patent- und Rechtsanwälte Gewürzmühlstrasse 5 80538 München / DE | ||
Former [2016/20] | Emde, Eric Wagner & Geyer Gewürzmühlstrasse 5 80538 München / DE | Application number, filing date | 14742066.5 | 26.06.2014 | [2016/20] | WO2014US44226 | Priority number, date | US201313936303 | 08.07.2013 Original published format: US201313936303 | [2016/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015006057 | Date: | 15.01.2015 | Language: | EN | [2015/02] | Type: | A1 Application with search report | No.: | EP3020059 | Date: | 18.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.01.2015 takes the place of the publication of the European patent application. | [2016/20] | Type: | B1 Patent specification | No.: | EP3020059 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | International search report - published on: | EP | 15.01.2015 | Classification | IPC: | H01H71/12, H02H3/093, H02H7/22 | [2016/20] | CPC: |
H02H3/10 (EP,US);
H01H71/123 (EP,US);
H02H3/027 (EP,US);
H02H3/087 (EP,US);
H02H3/093 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRONISCHE SCHUTZSCHALTUNG UND STEUERUNGSVERFAHREN DAFÜR | [2020/11] | English: | ELECTRONIC PROTECTION CIRCUIT AND METHOD OF CONTROLLING THE SAME | [2016/20] | French: | CIRCUIT DE PROTECTION ÉLECTRONIQUE ET SON PROCÉDÉ DE CONTRÔLE | [2020/11] |
Former [2016/20] | ELEKTRONISCHE SCHUTZSCHALTUNG UND VERFAHREN ZUR STEUERUNG DAVON | ||
Former [2016/20] | CIRCUIT DE PROTECTION ÉLECTRONIQUE ET PROCÉDÉ DE COMMANDE DE CELUI-CI | Entry into regional phase | 30.12.2015 | National basic fee paid | 30.12.2015 | Designation fee(s) paid | 30.12.2015 | Examination fee paid | Examination procedure | 30.12.2015 | Examination requested [2016/20] | 18.08.2016 | Amendment by applicant (claims and/or description) | 14.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 23.11.2017 | Reply to a communication from the examining division | 23.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 02.08.2018 | Reply to a communication from the examining division | 29.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 06.05.2019 | Reply to a communication from the examining division | 10.03.2020 | Communication of intention to grant the patent | 17.06.2020 | Fee for grant paid | 17.06.2020 | Fee for publishing/printing paid | 17.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 31.03.2016 | Renewal fee patent year 03 | 08.06.2017 | Renewal fee patent year 04 | 22.06.2018 | Renewal fee patent year 05 | 21.06.2019 | Renewal fee patent year 06 | 22.06.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2014 | AL | 29.07.2020 | AT | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | MT | 29.07.2020 | NL | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | [2024/41] |
Former [2024/29] | HU | 26.06.2014 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
TR | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2024/22] | HU | 26.06.2014 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2023/30] | HU | 26.06.2014 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2023/27] | HU | 26.06.2014 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2022/08] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/23] | AT | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | AT | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | AT | 29.07.2020 | |
DK | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/17] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/08] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | FI | 29.07.2020 | |
LT | 29.07.2020 | ||
NO | 29.10.2020 | Cited in | International search | [XY]US2005273207 (DOUGHERTY JOHN J [US]) [X] 1-3,6-15 * paragraphs [029 ] - [ 113]; figures 1-9 * [Y] 4,5; | [X]US2007008670 (FLETCHER DAVID G [US], et al) [X] 1-3,6-15 * paragraphs [092 ] - [ 116]; figure 9 *; | [X]US2006279884 (VALDES MARCELO [US], et al) [X] 1-3,6-15 * paragraphs [018 ] - [0 43]; figures 1-4 *; | [Y]US2013057247 (RUSSELL JAMES K [US], et al) [Y] 4 * paragraph [0076]; figure 5 *; | [Y]EP0279691 (WESTINGHOUSE ELECTRIC CORP [US]) [Y] 5 * page 12, line 56 - page 13, line 30; figure 10 * | Examination | - ABB, "REF541,543,545 Protection, Monitoring and Control Technical Reference Manual Part 1, General", 19990630, (19990630), vol. G/30.06.1999, pages 1 - 79, XP002505594 |