EP2948200 - FLUID WASTE COLLECTION AND DISPOSAL METHOD [Right-click to bookmark this link] | |||
Former [2015/49] | FLUID WASTE COLLECTION AND DISPOSAL SYSTEM AND METHOD | ||
[2017/39] | Status | No opposition filed within time limit Status updated on 17.05.2019 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 08.06.2018 | ||
Former | Grant of patent is intended Status updated on 17.05.2018 | ||
Former | Request for examination was made Status updated on 09.04.2018 | ||
Former | Grant of patent is intended Status updated on 24.11.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Skyline Medical Inc. 2915 Commers Drive Suite 900 Eagan, MN 55121 / US | [2015/49] | Inventor(s) | 01 /
SCHMIDT, Rodney 1958 Kenwood Drive West Maplewood, MN 55117 / US | 02 /
JOHNSON, David 9912 Brookside Avenue Bloomington, MI 55431 / US | 03 /
DAUWALTER, David 2686 Nightingale Court Chaska, MN 55318 / US | [2015/49] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2018/28] |
Former [2015/49] | Wightman, David Alexander 100 Hagley Road Edgbaston Birmingham West Midlands B16 8QQ / GB | Application number, filing date | 14743665.3 | 25.01.2014 | [2015/49] | WO2014US13081 | Priority number, date | US201361756763P | 25.01.2013 Original published format: US 201361756763 P | [2015/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014117043 | Date: | 31.07.2014 | Language: | EN | [2014/31] | Type: | A1 Application with search report | No.: | EP2948200 | Date: | 02.12.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.07.2014 takes the place of the publication of the European patent application. | [2015/49] | Type: | B1 Patent specification | No.: | EP2948200 | Date: | 11.07.2018 | Language: | EN | [2018/28] | Search report(s) | International search report - published on: | US | 31.07.2014 | (Supplementary) European search report - dispatched on: | EP | 21.09.2016 | Classification | IPC: | A61M1/00 | [2015/49] | CPC: |
A61M1/631 (EP,US);
F15D1/002 (US);
B08B3/04 (US);
A61M1/882 (EP,US);
Y10T137/0396 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR SAMMLUNG UND ENTSORGUNG FLÜSSIGER ABFÄLLE | [2017/39] | English: | FLUID WASTE COLLECTION AND DISPOSAL METHOD | [2017/39] | French: | PROCÉDÉ DE COLLECTE ET D'ÉLIMINATION DE DÉCHETS FLUIDES | [2017/39] |
Former [2015/49] | SYSTEM UND VERFAHREN ZUR SAMMLUNG UND ENTSORGUNG FLÜSSIGER ABFÄLLE | ||
Former [2015/49] | FLUID WASTE COLLECTION AND DISPOSAL SYSTEM AND METHOD | ||
Former [2015/49] | SYSTÈME ET PROCÉDÉ DE COLLECTE ET D'ÉLIMINATION DE DÉCHETS FLUIDES | Entry into regional phase | 22.08.2015 | National basic fee paid | 22.08.2015 | Search fee paid | 22.08.2015 | Designation fee(s) paid | 22.08.2015 | Examination fee paid | Examination procedure | 22.08.2015 | Examination requested [2015/49] | 24.03.2016 | Amendment by applicant (claims and/or description) | 22.11.2017 | Communication of intention to grant the patent | 03.04.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.05.2018 | Communication of intention to grant the patent | 31.05.2018 | Fee for grant paid | 31.05.2018 | Fee for publishing/printing paid | 31.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18020324.2 / EP3437666 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.11.2017 | Opposition(s) | 12.04.2019 | No opposition filed within time limit [2019/25] | Fees paid | Renewal fee | 27.01.2016 | Renewal fee patent year 03 | 27.01.2017 | Renewal fee patent year 04 | 29.01.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.01.2014 | AL | 11.07.2018 | AT | 11.07.2018 | CY | 11.07.2018 | CZ | 11.07.2018 | DK | 11.07.2018 | EE | 11.07.2018 | FI | 11.07.2018 | HR | 11.07.2018 | LT | 11.07.2018 | LV | 11.07.2018 | MC | 11.07.2018 | MK | 11.07.2018 | RO | 11.07.2018 | RS | 11.07.2018 | SI | 11.07.2018 | SK | 11.07.2018 | SM | 11.07.2018 | TR | 11.07.2018 | BG | 11.10.2018 | GR | 12.10.2018 | IS | 11.11.2018 | PT | 11.11.2018 | LU | 25.01.2019 | MT | 25.01.2019 | CH | 31.01.2019 | LI | 31.01.2019 | [2022/31] |
Former [2021/32] | HU | 25.01.2014 | |
AL | 11.07.2018 | ||
AT | 11.07.2018 | ||
CY | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
PT | 11.11.2018 | ||
LU | 25.01.2019 | ||
MT | 25.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2021/26] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CY | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
PT | 11.11.2018 | ||
LU | 25.01.2019 | ||
MT | 25.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/29] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
PT | 11.11.2018 | ||
LU | 25.01.2019 | ||
MT | 25.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/16] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
LU | 25.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/04] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
LU | 25.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2019/44] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
LU | 25.01.2019 | ||
Former [2019/40] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/37] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/26] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/24] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
EE | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
SK | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/22] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
RO | 11.07.2018 | ||
RS | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/12] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
RS | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/11] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
RS | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/10] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
LT | 11.07.2018 | ||
RS | 11.07.2018 | ||
BG | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/08] | FI | 11.07.2018 | |
LT | 11.07.2018 | ||
IS | 11.11.2018 | ||
Former [2019/07] | LT | 11.07.2018 | Documents cited: | Search | [A]EP0351980 (PFIZER HOSPITAL PROD [US]) [A] 1-15* column 2, lines 5-27; figure 5 *; | [A]WO2006041406 (ASTRA TECH AB [SE], et al) [A] 1-15 * figure 10; claim 23 * | International search | [A]US5914047 (GRIFFITHS GERALD R [US]); | [A]US2009216205 (RYAN MARSHALL C [US], et al); | [A]US7621898 (LALOMIA BRENT S [US], et al) |