EP3030372 - METHOD FOR MANUFACTURING A WELDED CONNECTION [Right-click to bookmark this link] | |||
Former [2016/24] | METHOD FOR PRODUCING A WELDED JOINT | ||
[2019/22] | Status | No opposition filed within time limit Status updated on 26.05.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 17.06.2022 | ||
Former | Grant of patent is intended Status updated on 18.04.2022 | ||
Former | Examination is in progress Status updated on 30.03.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states MAGNA STEYR Fahrzeugtechnik AG & Co KG Liebenauer Hauptstrasse 317 8041 Graz / AT | [2019/51] |
Former [2016/24] | For all designated states MAGNA STEYR Engineering AG & Co KG Liebenauer Hauptstrasse 317 8041 Graz / AT | Inventor(s) | 01 /
KARNER, Werner Kaiserwiesenweg 31B A-8055 Graz / AT | 02 /
TREVEN, Helmut Veilchenweg 1/1 A-8077 Gössendorf / AT | [2016/24] | Representative(s) | Zangger, Bernd Magna International Europe GmbH Patentabteilung Liebenauer Hauptstraße 317 8041 Graz / AT | [2016/24] | Application number, filing date | 14747929.9 | 05.08.2014 | [2016/24] | WO2014EP66829 | Priority number, date | EP20130179352 | 06.08.2013 Original published format: EP 13179352 | [2016/24] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015018833 | Date: | 12.02.2015 | Language: | DE | [2015/06] | Type: | A1 Application with search report | No.: | EP3030372 | Date: | 15.06.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 12.02.2015 takes the place of the publication of the European patent application. | [2016/24] | Type: | B1 Patent specification | No.: | EP3030372 | Date: | 20.07.2022 | Language: | DE | [2022/29] | Search report(s) | International search report - published on: | EP | 12.02.2015 | Classification | IPC: | B23K9/235, B23K33/00 | [2022/14] | CPC: |
B23K9/232 (EP,US);
B23K33/004 (EP,US);
B23K9/125 (EP,US);
B23K9/235 (EP,US);
B23K2103/20 (EP,US)
|
Former IPC [2019/22] | B23K9/12, B23K103/20, B23K9/23 | ||
Former IPC [2016/24] | B23K9/23, B23K15/00, B23K26/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN EINER SCHWEISSVERBINDUNG | [2016/24] | English: | METHOD FOR MANUFACTURING A WELDED CONNECTION | [2019/22] | French: | PROCÉDÉ DE FABRICATION D'UNE LIAISON SOUDÉE | [2019/22] |
Former [2016/24] | METHOD FOR PRODUCING A WELDED JOINT | ||
Former [2016/24] | PROCÉDÉ DE PRODUCTION D'UN JOINT SOUDÉ | Entry into regional phase | 01.02.2016 | National basic fee paid | 01.02.2016 | Designation fee(s) paid | 01.02.2016 | Examination fee paid | Examination procedure | 01.02.2016 | Examination requested [2016/24] | 14.06.2016 | Amendment by applicant (claims and/or description) | 04.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 17.09.2018 | Reply to a communication from the examining division | 08.08.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.11.2019 | Reply to a communication from the examining division | 19.04.2022 | Communication of intention to grant the patent | 09.06.2022 | Fee for grant paid | 09.06.2022 | Fee for publishing/printing paid | 09.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 21.04.2023 | No opposition filed within time limit [2023/26] | Fees paid | Renewal fee | 22.08.2016 | Renewal fee patent year 03 | 22.08.2017 | Renewal fee patent year 04 | 28.08.2018 | Renewal fee patent year 05 | 26.08.2019 | Renewal fee patent year 06 | 20.08.2020 | Renewal fee patent year 07 | 23.08.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.08.2014 | AL | 20.07.2022 | CY | 20.07.2022 | CZ | 20.07.2022 | DK | 20.07.2022 | EE | 20.07.2022 | ES | 20.07.2022 | FI | 20.07.2022 | HR | 20.07.2022 | IT | 20.07.2022 | LT | 20.07.2022 | LV | 20.07.2022 | MC | 20.07.2022 | MK | 20.07.2022 | NL | 20.07.2022 | PL | 20.07.2022 | RO | 20.07.2022 | RS | 20.07.2022 | SE | 20.07.2022 | SI | 20.07.2022 | SK | 20.07.2022 | SM | 20.07.2022 | TR | 20.07.2022 | IE | 05.08.2022 | LU | 05.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | NO | 20.10.2022 | GR | 21.10.2022 | IS | 20.11.2022 | PT | 21.11.2022 | [2024/29] |
Former [2024/27] | HU | 05.08.2014 | |
AL | 20.07.2022 | ||
CY | 20.07.2022 | ||
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
IT | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
MK | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2024/26] | HU | 05.08.2014 | |
AL | 20.07.2022 | ||
CY | 20.07.2022 | ||
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
IT | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2024/20] | HU | 05.08.2014 | |
AL | 20.07.2022 | ||
CY | 20.07.2022 | ||
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2024/18] | HU | 05.08.2014 | |
AL | 20.07.2022 | ||
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/42] | AL | 20.07.2022 | |
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/37] | AL | 20.07.2022 | |
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SI | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/33] | AL | 20.07.2022 | |
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/29] | AL | 20.07.2022 | |
CZ | 20.07.2022 | ||
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/23] | CZ | 20.07.2022 | |
DK | 20.07.2022 | ||
EE | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SK | 20.07.2022 | ||
SM | 20.07.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/22] | CZ | 20.07.2022 | |
DK | 20.07.2022 | ||
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
MC | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RO | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SM | 20.07.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/21] | DK | 20.07.2022 | |
ES | 20.07.2022 | ||
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SM | 20.07.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/20] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
SM | 20.07.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/12] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
IS | 20.11.2022 | ||
PT | 21.11.2022 | ||
Former [2023/11] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
PL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
PT | 21.11.2022 | ||
Former [2023/10] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
HR | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
NO | 20.10.2022 | ||
GR | 21.10.2022 | ||
PT | 21.11.2022 | ||
Former [2023/09] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
LT | 20.07.2022 | ||
LV | 20.07.2022 | ||
NL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
NO | 20.10.2022 | ||
PT | 21.11.2022 | ||
Former [2023/08] | ES | 20.07.2022 | |
FI | 20.07.2022 | ||
LT | 20.07.2022 | ||
NL | 20.07.2022 | ||
RS | 20.07.2022 | ||
SE | 20.07.2022 | ||
NO | 20.10.2022 | ||
Former [2023/06] | NL | 20.07.2022 | Cited in | International search | [Y]DE3909620 (BUEDENBENDER BERND [DE]) [Y] 1-15* column 2, lines 27-63; figure 2 *; | [Y]US2013028659 (LEITNER ALOIS [AT], et al) [Y] 1-15 * paragraphs [0027] - [0035]; figures 1, 2 * | Examination | EP0534704 |