EP2989077 - PREPARATION OF METHYL METHACRYLATE VIA AN OXIDATIVE ESTERIFICATION PROCESS [Right-click to bookmark this link] | |||
Former [2016/09] | PREPARATION OF METHYL ACRYLATE VIA AN OXIDATIVE ESTERIFICATION PROCESS | ||
[2017/31] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 23.07.2017 | ||
Former | Request for examination was made Status updated on 23.06.2017 | ||
Former | Grant of patent is intended Status updated on 02.04.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Rohm and Haas Company 100 Independence Mall West Philadelphia, PA 19106 / US | [2016/09] | Inventor(s) | 01 /
LIMBACH, Kirk 3 Aiman Circle Dresher, PA 19025 / US | 02 /
KRAPTCHETOV, Dmitri A. 2034 Ryans Run Lansdale, PA 19446 / US | 03 /
FRICK, Christopher D. 573 Kline Avenue Pottstown, PA 19465 / US | [2016/09] | Representative(s) | Houghton, Mark Phillip Patent Outsourcing Limited 1 King Street Bakewell, Derbyshire DE45 1DZ / GB | [2016/09] | Application number, filing date | 14750669.5 | 29.07.2014 | [2016/09] | WO2014US48667 | Priority number, date | US201361859551P | 29.07.2013 Original published format: US 201361859551 P | [2016/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015017437 | Date: | 05.02.2015 | Language: | EN | [2015/05] | Type: | A1 Application with search report | No.: | EP2989077 | Date: | 02.03.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.02.2015 takes the place of the publication of the European patent application. | [2016/09] | Type: | B1 Patent specification | No.: | EP2989077 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Search report(s) | International search report - published on: | EP | 05.02.2015 | Classification | IPC: | C07C67/39, C07C69/54 | [2016/09] | CPC: |
C07C67/39 (EP,US);
B01J21/04 (EP,US);
B01J23/002 (EP,US);
B01J23/6447 (EP,US);
B01J23/6484 (US);
B01J23/6525 (EP,US);
B01J27/186 (US);
B01J37/031 (EP,US);
B01J37/038 (EP,US);
| C-Set: |
C07C67/39, C07C69/54 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/32, B01J2523/54, B01J2523/824 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/35, B01J2523/54, B01J2523/824 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/36, B01J2523/54, B01J2523/824 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/54, B01J2523/824 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/3725, B01J2523/54, B01J2523/824 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/51, B01J2523/54, B01J2523/824 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/54, B01J2523/56, B01J2523/824 (US,EP); | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HERSTELLUNG VON METHYLMETHACRYLAT ÜBER EIN VERFAHREN DER OXIDATIVEN VERESTERUNG | [2017/31] | English: | PREPARATION OF METHYL METHACRYLATE VIA AN OXIDATIVE ESTERIFICATION PROCESS | [2017/31] | French: | PRÉPARATION DU MÉTHACRYLATE DE MÉTHYLE PAR LE BIAIS D'UN PROCÉDÉ D'ESTÉRIFICATION OXYDATIVE | [2017/31] |
Former [2016/09] | HERSTELLUNG VON METHYLACRYLAT ÜBER EIN VERFAHREN DER OXIDATIVEN VERESTERUNG | ||
Former [2016/09] | PREPARATION OF METHYL ACRYLATE VIA AN OXIDATIVE ESTERIFICATION PROCESS | ||
Former [2016/09] | PRÉPARATION D'ACRYLATE DE MÉTHYLE PAR LE BIAIS D'UN PROCÉDÉ D'ESTÉRIFICATION OXYDATIVE | Entry into regional phase | 27.11.2015 | National basic fee paid | 27.11.2015 | Designation fee(s) paid | 27.11.2015 | Examination fee paid | Examination procedure | 27.11.2015 | Examination requested [2016/09] | 17.06.2016 | Amendment by applicant (claims and/or description) | 03.04.2017 | Communication of intention to grant the patent | 15.06.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.07.2017 | Communication of intention to grant the patent | 16.11.2017 | Fee for grant paid | 16.11.2017 | Fee for publishing/printing paid | 16.11.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 11.07.2016 | Renewal fee patent year 03 | 12.07.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.07.2014 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | DK | 27.12.2017 | EE | 27.12.2017 | ES | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | IT | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SE | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | IS | 27.04.2018 | IE | 29.07.2018 | LU | 29.07.2018 | MT | 29.07.2018 | CH | 31.07.2018 | LI | 31.07.2018 | [2020/34] |
Former [2020/31] | HU | 29.07.2014 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/30] | HU | 29.07.2014 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/29] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/28] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/08] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
MT | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/33] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/21] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
LU | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/17] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
LU | 29.07.2018 | ||
Former [2019/15] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/13] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/51] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/40] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/39] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Cited in | International search | [YD]GB2051056 (ASAHI CHEMICAL IND) [YD] 1-14 * abstract * * page 1, column r, line 119 - page 2, column l, line 21 * * examples 1-8 * * claims 1-13 *; | [Y]US4714695 (PAPARIZOS CHRISTOS [US], et al) [Y] 1-14 * abstract * * column 2, lines 33-51 * * column 3, lines 1-2 * * examples 1-6 * * table 1 ** claims 1-6 *; | [Y]JPH05148184 (MITSUI TOATSU CHEMICALS) [Y] 1-14 * abstract * * paragraphs [0008] - [0010] * * examples 1-5 * * claims 1-4 *; | [Y]JPH10263399 (ASAHI CHEMICAL IND) [Y] 1-14 * abstract * * paragraphs [0021] - [0025]; examples 1-13 * * claims 1-6 *; | [YD]US5892102 (MIKAMI YUJI [JP], et al) [YD] 1-14 * abstract * * examples 1-71 * * column 21 - column 22; table 1 * * claims 1-6 *; | [Y]JP2004137173 (ASAHI CHEMICAL CORP) [Y] 1-14 * abstract * * paragraphs [0017] , [0 21] - [0025] * * examples 1, 2 * * tables 1-3 * * claims 1-3 *; | [Y]JP2004345973 (ASAHI KASEI CHEMICALS CORP) [Y] 1-14 * abstract * * paragraphs [0021] - [0023] * * examples 1-3 * * claim 1 * |