EP3025205 - METHOD OF ESTIMATION ON A CURVE OF A RELEVANT POINT FOR THE DETECTION OF AN ANOMALY OF A MOTOR AND DATA PROCESSING SYSTEM FOR THE IMPLEMENTATION THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.08.2018 | ||
Former | Grant of patent is intended Status updated on 05.04.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Safran Aircraft Engines 2 boulevard du Général Martial Valin 75015 Paris / FR | [2018/28] |
Former [2016/22] | For all designated states SNECMA 2 Boulevard du Général Martial Valin 75015 Paris / FR | Inventor(s) | 01 /
RABENORO, Tsirizo c/o Snecma PI (AJI) Rond Point René Ravaud Réau F-77550 Moissy-Cramayel Cedex / FR | 02 /
LACAILLE, Jérôme, Henri, Noël c/o Snecma PI (AJI) Rond Point René Ravaud Réau F-77550 Moissy-Cramayel Cedex / FR | [2016/22] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2016/22] | Application number, filing date | 14755870.4 | 21.07.2014 | [2016/22] | WO2014FR51882 | Priority number, date | FR20130057252 | 23.07.2013 Original published format: FR 1357252 | [2016/22] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015011395 | Date: | 29.01.2015 | Language: | FR | [2015/04] | Type: | A1 Application with search report | No.: | EP3025205 | Date: | 01.06.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 29.01.2015 takes the place of the publication of the European patent application. | [2016/22] | Type: | B1 Patent specification | No.: | EP3025205 | Date: | 05.09.2018 | Language: | FR | [2018/36] | Search report(s) | International search report - published on: | EP | 29.01.2015 | Classification | IPC: | G05B23/02, F02C7/00, F01D21/00 | [2016/22] | CPC: |
F01D21/003 (EP,US);
G05B23/02 (RU);
G07C5/0808 (US);
F02C7/00 (EP,US);
G05B17/00 (RU);
G05B23/0243 (EP,US);
G05B23/0254 (EP,US);
G07C5/0825 (US);
G07C5/12 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHÄTZUNGSVERFAHREN EINES RELEVANTEN PUNKTES AUF EINER KURVE ZUR ERKENNUNG VON ANOMALIEN EINES MOTORS UND DATENVERARBEITUNGSSYSTEM ZUR IMPLEMENTIERUNG DAVON | [2016/22] | English: | METHOD OF ESTIMATION ON A CURVE OF A RELEVANT POINT FOR THE DETECTION OF AN ANOMALY OF A MOTOR AND DATA PROCESSING SYSTEM FOR THE IMPLEMENTATION THEREOF | [2016/22] | French: | PROCÉDÉ D'ESTIMATION SUR UNE COURBE D'UN POINT PERTINENT POUR LA DÉTECTION D'ANOMALIE D'UN MOTEUR ET SYSTÈME DE TRAITEMENT DE DONNÉES POUR SA MISE EN OEUVRE | [2018/18] |
Former [2016/22] | PROCEDE D'ESTIMATION SUR UNE COURBE D'UN POINT PERTINENT POUR LA DETECTION D'ANOMALIE D'UN MOTEUR ET SYSTEME DE TRAITEMENT DE DONNEES POUR SA MISE EN OEUVRE | Entry into regional phase | 22.02.2016 | National basic fee paid | 22.02.2016 | Designation fee(s) paid | 22.02.2016 | Examination fee paid | Examination procedure | 22.02.2016 | Examination requested [2016/22] | 30.08.2016 | Amendment by applicant (claims and/or description) | 05.04.2018 | Communication of intention to grant the patent | 25.07.2018 | Fee for grant paid | 25.07.2018 | Fee for publishing/printing paid | 25.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 06.06.2019 | No opposition filed within time limit [2019/33] | Fees paid | Renewal fee | 22.07.2016 | Renewal fee patent year 03 | 21.07.2017 | Renewal fee patent year 04 | 24.07.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.07.2014 | AL | 05.09.2018 | AT | 05.09.2018 | CY | 05.09.2018 | CZ | 05.09.2018 | DK | 05.09.2018 | EE | 05.09.2018 | ES | 05.09.2018 | FI | 05.09.2018 | HR | 05.09.2018 | LT | 05.09.2018 | LV | 05.09.2018 | MC | 05.09.2018 | MK | 05.09.2018 | MT | 05.09.2018 | NL | 05.09.2018 | PL | 05.09.2018 | RO | 05.09.2018 | RS | 05.09.2018 | SI | 05.09.2018 | SK | 05.09.2018 | SM | 05.09.2018 | TR | 05.09.2018 | BG | 05.12.2018 | NO | 05.12.2018 | GR | 06.12.2018 | IS | 05.01.2019 | PT | 05.01.2019 | [2022/31] |
Former [2021/34] | HU | 21.07.2014 | |
AL | 05.09.2018 | ||
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
MT | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2021/32] | HU | 21.07.2014 | |
AL | 05.09.2018 | ||
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2021/26] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CY | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2020/17] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
TR | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2020/14] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
MC | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/37] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SI | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/34] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
DK | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/26] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SK | 05.09.2018 | ||
SM | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
PT | 05.01.2019 | ||
Former [2019/23] | AL | 05.09.2018 | |
AT | 05.09.2018 | ||
CZ | 05.09.2018 | ||
EE | 05.09.2018 | ||
ES | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
SK | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/22] | AL | 05.09.2018 | |
CZ | 05.09.2018 | ||
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
PL | 05.09.2018 | ||
RO | 05.09.2018 | ||
RS | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/21] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
RS | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
IS | 05.01.2019 | ||
Former [2019/20] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
NL | 05.09.2018 | ||
RS | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/12] | AL | 05.09.2018 | |
FI | 05.09.2018 | ||
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
LV | 05.09.2018 | ||
RS | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/11] | FI | 05.09.2018 | |
HR | 05.09.2018 | ||
LT | 05.09.2018 | ||
RS | 05.09.2018 | ||
BG | 05.12.2018 | ||
NO | 05.12.2018 | ||
GR | 06.12.2018 | ||
Former [2019/08] | FI | 05.09.2018 | |
LT | 05.09.2018 | ||
NO | 05.12.2018 | ||
Former [2019/07] | LT | 05.09.2018 | Cited in | International search | [A]US2003065409 (RAETH PETER G [US], et al); | [XI]US2005267702 (SHAH MINESH [US], et al); | [A]FR2939170 (SNECMA [FR]); | [A]EP2570880 (BOEING CO [US]) |