EP2967748 - ELECTROSURGICAL INSTRUMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 31.01.2021 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Megadyne Medical Products, Inc. 11506 South State Street Draper, UT 84020 / US | [2021/41] |
Former [2016/03] | For all designated states Megadyne Medical Products, Inc. 11506 South State Street Draper, UT 84020 / US | Inventor(s) | 01 /
GREEP, Darcy 14256 Long Ridge Drive Herriman, UT 84096 / US | 02 /
BORGMEIER, Paul 1417 East Winderbrook Way Salt Lake City, UT 84124 / US | 03 /
FRAMPTON, Chad 536 North 580 West American Fork, UT 84003 / US | [2021/41] |
Former [2016/03] | 01 /
GREEP, Darcy 14256 Long Ridge Drive Herriman, Utah 84096 / US | ||
02 /
BORGMEIER, Paul 1417 East Winderbrook Way Salt Lake City, Utah 84124 / US | |||
03 /
FRAMPTON, Chad 536 North 580 West American Fork, Utah 84003 / US | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2021/41] |
Former [2016/03] | Fulton, David James, et al Lincoln IP 9 Victoria Street Aberdeen AB10 1XB / GB | Application number, filing date | 14770601.4 | 14.03.2014 | [2016/03] | WO2014US28080 | Priority number, date | US201313831502 | 14.03.2013 Original published format: US201313831502 | [2016/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014152874 | Date: | 25.09.2014 | Language: | EN | [2014/39] | Type: | A2 Application without search report | No.: | EP2967748 | Date: | 20.01.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.09.2014 takes the place of the publication of the European patent application. | [2016/03] | Type: | B1 Patent specification | No.: | EP2967748 | Date: | 13.10.2021 | Language: | EN | [2021/41] | Search report(s) | International search report - published on: | US | 13.11.2014 | (Supplementary) European search report - dispatched on: | EP | 25.11.2016 | Classification | IPC: | A61B18/14, // A61B18/00, A61C1/00 | [2016/52] | CPC: |
A61B18/1402 (EP,IL,US);
A61C1/00 (EP,IL,US);
A61C1/052 (EP,IL,US);
A61C1/14 (EP,IL,US);
B25F1/04 (IL,US);
A61B2018/00321 (EP,IL,US);
|
Former IPC [2016/03] | A61B18/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTROCHIRURGISCHES INSTRUMENT | [2016/03] | English: | ELECTROSURGICAL INSTRUMENT | [2016/03] | French: | INSTRUMENT ÉLECTROCHIRURGICAL | [2016/03] | Entry into regional phase | 11.09.2015 | National basic fee paid | 11.09.2015 | Search fee paid | 11.09.2015 | Designation fee(s) paid | 11.09.2015 | Examination fee paid | Examination procedure | 11.09.2015 | Examination requested [2016/03] | 12.06.2017 | Amendment by applicant (claims and/or description) | 01.02.2021 | Communication of intention to grant the patent | 02.07.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 01.09.2021 | Fee for grant paid | 01.09.2021 | Fee for publishing/printing paid | 01.09.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.02.2021 | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 01.09.2021 | Request for further processing filed | 01.09.2021 | Full payment received (date of receipt of payment) Request granted | 10.09.2021 | Decision despatched | Fees paid | Renewal fee | 10.03.2016 | Renewal fee patent year 03 | 10.03.2017 | Renewal fee patent year 04 | 13.03.2018 | Renewal fee patent year 05 | 13.03.2019 | Renewal fee patent year 06 | 12.03.2020 | Renewal fee patent year 07 | 12.03.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.03.2014 | AL | 13.10.2021 | AT | 13.10.2021 | CY | 13.10.2021 | CZ | 13.10.2021 | DK | 13.10.2021 | EE | 13.10.2021 | ES | 13.10.2021 | FI | 13.10.2021 | HR | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | MT | 13.10.2021 | PL | 13.10.2021 | RO | 13.10.2021 | RS | 13.10.2021 | SE | 13.10.2021 | SI | 13.10.2021 | SK | 13.10.2021 | SM | 13.10.2021 | TR | 13.10.2021 | BG | 13.01.2022 | NO | 13.01.2022 | GR | 14.01.2022 | IS | 13.02.2022 | PT | 14.02.2022 | IE | 14.03.2022 | LU | 14.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | [2024/41] |
Former [2024/29] | HU | 14.03.2014 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
TR | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/22] | HU | 14.03.2014 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 14.03.2014 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 14.03.2014 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
IE | 14.03.2022 | ||
LU | 14.03.2022 | ||
Former [2023/01] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/49] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/47] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | AT | 13.10.2021 | |
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/25] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/23] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | AT | 13.10.2021 | |
FI | 13.10.2021 | ||
LT | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/21] | AT | 13.10.2021 | |
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/19] | BG | 13.01.2022 | Documents cited: | Search | [A]US2006264928 (KORNERUP NIELS [DK], et al) [A] 1-18* abstract *; | [XI]US7329253 (BROUNSTEIN DANIEL M [US], et al) [X] 1 * columns 1,9; figures 20-27 * [I] 2-18 | International search | [X]US5234429 (GOLDHABER NEIL G [US]); | [A]USD493350S (WEGMAN THOMAS [US]); | [Y]US2013006236 (GREEP DARCY W [US], et al) | by applicant | US4936842 | US7329253 |