EP3043947 - MEASURING GEOMETRY, MEASURING DEVICE COMPRISING SAID TYPE OF MEASURING GEOMETRY AND MEASURING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 21.01.2025 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 09.03.2021 | ||
Former | Examination is in progress Status updated on 26.06.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Gleason-Pfauter Maschinenfabrik GmbH Daimlerstrasse 14 71636 Ludwigsburg / DE | [2016/29] | Inventor(s) | 01 /
KRESCHEL, Jürgen Flauchhalde 7 71282 Hemmingen / DE | 02 /
WEPPELMANN, Edgar Birkenweg 2 71679 Asperg / DE | [2021/20] |
Former [2016/29] | 01 /
KRESCHEL, Jürgen Seestrasse 28 71282 Hemmingen / DE | ||
02 /
WEPPELMANN, Edgar Birkenweg 2 71679 Asperg / DE | Representative(s) | Leinweber & Zimmermann Patentanwalts-PartG mbB European Patent Attorneys Viktualienmarkt 8 80331 München / DE | [2021/20] |
Former [2016/29] | Leinweber & Zimmermann Rosental 7, II. Aufgang 80331 München / DE | Application number, filing date | 14771194.9 | 04.09.2014 | [2016/29] | WO2014EP02394 | Priority number, date | DE20131015253 | 13.09.2013 Original published format: DE102013015253 | [2016/29] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2015036104 | Date: | 19.03.2015 | Language: | DE | [2015/11] | Type: | A2 Application without search report | No.: | EP3043947 | Date: | 20.07.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 19.03.2015 takes the place of the publication of the European patent application. | [2016/29] | Type: | B1 Patent specification | No.: | EP3043947 | Date: | 19.05.2021 | Language: | DE | [2021/20] | Search report(s) | International search report - published on: | EP | 28.05.2015 | Classification | IPC: | B23F5/16, B23F23/12, B23Q17/22 | [2016/29] | CPC: |
B23F5/163 (EP,KR,US);
B23F23/12 (EP,KR,US);
G05B19/182 (KR,US);
B23Q17/20 (KR,US);
G01B5/20 (KR,US);
G05B2219/35035 (KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MESSGEOMETRIE, MESSEINRICHTUNG MIT EINER SOLCHEN MESSGEOMETRIE UND MESSVERFAHREN | [2016/29] | English: | MEASURING GEOMETRY, MEASURING DEVICE COMPRISING SAID TYPE OF MEASURING GEOMETRY AND MEASURING METHOD | [2016/29] | French: | GÉOMÉTRIE DE MESURE, DISPOSITIF DE MESURE PRÉSENTANT UNE TELLE GÉOMÉTRIE DE MESURE ET PROCÉDÉ DE MESURE CORRESPONDANT | [2016/29] | Entry into regional phase | 18.03.2016 | National basic fee paid | 18.03.2016 | Designation fee(s) paid | 18.03.2016 | Examination fee paid | Examination procedure | 18.03.2016 | Examination requested [2016/29] | 02.11.2016 | Amendment by applicant (claims and/or description) | 01.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.07.2019 | Reply to a communication from the examining division | 10.03.2021 | Communication of intention to grant the patent | 07.04.2021 | Fee for grant paid | 07.04.2021 | Fee for publishing/printing paid | 07.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 08.09.2016 | Renewal fee patent year 03 | 27.09.2017 | Renewal fee patent year 04 | 27.09.2018 | Renewal fee patent year 05 | 27.09.2019 | Renewal fee patent year 06 | 28.09.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.09.2014 | AL | 19.05.2021 | CY | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | MT | 19.05.2021 | NL | 19.05.2021 | PL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | TR | 19.05.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | AT | 04.09.2021 | GB | 04.09.2021 | IE | 04.09.2021 | LU | 04.09.2021 | IS | 19.09.2021 | PT | 20.09.2021 | BE | 30.09.2021 | FR | 30.09.2021 | [2024/41] |
Former [2024/29] | HU | 04.09.2014 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
MK | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
TR | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
AT | 04.09.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2024/22] | HU | 04.09.2014 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
MK | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
AT | 04.09.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2023/30] | HU | 04.09.2014 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
AT | 04.09.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2023/29] | HU | 04.09.2014 | |
AL | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
AT | 04.09.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2023/07] | AL | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
AT | 04.09.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/35] | AL | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
GB | 04.09.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
LU | 04.09.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/25] | AL | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | DK | 19.05.2021 | |
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/10] | DK | 19.05.2021 | |
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/08] | DK | 19.05.2021 | |
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | ES | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/04] | ES | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/52] | ES | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | ES | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/47] | FI | 19.05.2021 | |
LT | 19.05.2021 | ||
BG | 19.08.2021 | ||
Former [2021/46] | FI | 19.05.2021 | |
LT | 19.05.2021 | Cited in | International search | [A]US2679109 (REYNOLDS WILLIAM E); | [A]US5271271 (FRAZIER CHARLES H [US]); | [XAI]JPH07102483B ; | [AD]EP2537615 (KLINGELNBERG AG [CH]) | Examination | DE20203661U | by applicant | EP2537615 |