EP3053408 - LIGHTING SYSTEM AND A METHOD OF CONTROLLING A LIGHTING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 04.11.2020 | ||
Former | Examination is in progress Status updated on 14.12.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2019/11] |
Former [2018/50] | For all designated states Philips Lighting Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | ||
Former [2016/32] | For all designated states Philips Lighting Holding B.V. High Tech Campus 45 5656 AE Eindhoven / NL | Inventor(s) | 01 /
MEERBEEK, Berent, Willem c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | 02 /
VAN GHELUWE, Jochen, Renaat c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | 03 /
VAN BOVEN, Jacobus, Dingenis, Machiel c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | 04 /
SEUNTIENS, Petrus, Johannes, Hendrikus c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | 05 /
VAN LOENEN, Evert, Jan c/o High Tech Campus 45 NL-5656 AE Eindhoven / NL | [2017/34] |
Former [2016/32] | 01 /
MEERBEEK, Berent, Willem c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | ||
02 /
VAN GHELUWE, Jochen, Renaat c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | |||
03 /
VAN BOVEN, Jacobus, Dingenis, Machiel c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | |||
04 /
SEUNTIENS, Petrus, Johannes, Hendrikus c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | |||
05 /
VAN LOENEN, Evert, Jan c/o High Tech Campus Building 5 NL-5656 AE Eindhoven / NL | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [2021/14] |
Former [2016/32] | Verweij, Petronella Daniëlle Philips Lighting B.V. Philips Lighting Intellectual Property High Tech Campus 5 5656 AE Eindhoven / NL | Application number, filing date | 14772352.2 | 25.09.2014 | [2016/32] | WO2014EP70432 | Priority number, date | EP20130187108 | 02.10.2013 Original published format: EP 13187108 | [2016/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015049146 | Date: | 09.04.2015 | Language: | EN | [2015/14] | Type: | A1 Application with search report | No.: | EP3053408 | Date: | 10.08.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.04.2015 takes the place of the publication of the European patent application. | [2016/32] | Type: | B1 Patent specification | No.: | EP3053408 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | International search report - published on: | EP | 09.04.2015 | Classification | IPC: | H05B47/10, H05B47/155, H05B47/16, H05B45/00, H05B45/10, H05B45/24, F21V5/04, F21S10/00, F21V7/00, F21V14/06, F21Y113/17, F21Y115/10 | [2020/47] | CPC: |
F21S10/00 (EP,US);
F21V5/045 (EP,US);
H05B45/00 (EP,US);
H05B45/10 (EP,US);
H05B45/20 (EP,US);
H05B45/24 (EP,US);
H05B47/11 (US);
H05B47/155 (EP,US);
H05B47/16 (EP,US);
F21V14/06 (EP,US);
F21V7/0091 (EP,US);
F21Y2113/17 (EP,US);
|
Former IPC [2016/32] | H05B33/08, H05B37/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BELEUCHTUNGSSYSTEM UND VERFAHREN ZUM STEUERN DES BELEUCHTUNGSSYSTEMS | [2020/47] | English: | LIGHTING SYSTEM AND A METHOD OF CONTROLLING A LIGHTING SYSTEM | [2016/32] | French: | SYSTÈME D'ÉCLAIRAGE ET PROCÉDÉ DE COMMANDE D'UN SYSTÈME D'ÉCLAIRAGE | [2020/47] |
Former [2016/32] | BELEUCHTUNGSSYSTEM UND VERFAHREN ZUM STEUERN EINES BELEUCHTUNGSSYSTEMS | ||
Former [2016/32] | SYSTÈME D'ÉCLAIRAGE ET MÉTHODE DE COMMANDE D'UN SYSTÈME D'ÉCLAIRAGE | Entry into regional phase | 02.05.2016 | National basic fee paid | 02.05.2016 | Designation fee(s) paid | 02.05.2016 | Examination fee paid | Examination procedure | 15.03.2016 | Amendment by applicant (claims and/or description) | 02.05.2016 | Examination requested [2016/32] | 18.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.01.2020 | Reply to a communication from the examining division | 04.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 03.09.2020 | Reply to a communication from the examining division | 05.11.2020 | Communication of intention to grant the patent | 01.03.2021 | Fee for grant paid | 01.03.2021 | Fee for publishing/printing paid | 01.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 30.09.2016 | Renewal fee patent year 03 | 02.10.2017 | Renewal fee patent year 04 | 01.10.2018 | Renewal fee patent year 05 | 30.09.2019 | Renewal fee patent year 06 | 30.09.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2014 | AL | 07.04.2021 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | ES | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | NL | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | TR | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | IE | 25.09.2021 | LU | 25.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/41] |
Former [2024/29] | HU | 25.09.2014 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
TR | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2024/22] | HU | 25.09.2014 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | HU | 25.09.2014 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/28] | HU | 25.09.2014 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/25] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
NL | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Cited in | International search | [A]EP1270324 (DAIMLER CHRYSLER AG [DE]) [A] 1-15* page 2, column 1, paragraph 1 - page 5, column 7, paragraph 31; figures 1-2 *; | [I]WO2004049765 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [I] 1-15 * the whole document *; | [I]US2007132892 (NISHIGAKI JUNJI [JP], et al) [I] 1-15 * the whole document *; | [I]WO2013061189 (KONINKL PHILIPS ELECTRONICS NV [NL]) [I] 1-15 * the whole document *; | [I] - Matthias Bues, Franz Miller, Britta Widmann, "MEDIENDIENST", Fraunhofer-Institut für Arbeitswirtschaft und Organisation IAO - Fraunhofer Presse, Stuttgart - Deutschland, (20120131), pages 1 - 4, URL: http://www.fraunhofer.de/content/dam/zv/de/presse-medien/2012/pdf/md01_2012_JANUAR.pdf, (20140311), XP002721467 [I] 1-15 * the whole document * |