EP2984596 - INVERSE-CONTOUR MACHINING TO ELIMINATE RESIDUAL STRESS DISTORTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.09.2020 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 27.09.2019 | ||
Former | Grant of patent is intended Status updated on 16.07.2019 | ||
Former | Examination is in progress Status updated on 02.02.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Raytheon Company 870 Winter Street Waltham, MA 02451 / US | [2019/33] |
Former [2016/07] | For all designated states Raytheon Company 870 Winter Street Waltham, MA 02451-1449 / US | Inventor(s) | 01 /
SIMON, Robert T. 870 Winter Street Waltham, Massachusetts 02451 / US | 02 /
GREGORY, Kris E. 870 Winter Street Waltham, Massachusetts 02451 / US | 03 /
HORSTMAN, Thomas 870 Winter Street Waltham, Massachusetts 02451 / US | [2016/07] | Representative(s) | Dentons UK and Middle East LLP One Fleet Place London EC4M 7WS / GB | [2019/44] |
Former [2016/07] | Hill, Justin John, et al Olswang LLP 90 High Holborn London WC1V 6XX / GB | Application number, filing date | 14783260.4 | 11.02.2014 | [2016/07] | WO2014US15862 | Priority number, date | US201361811012P | 11.04.2013 Original published format: US 201361811012 P | [2016/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014168681 | Date: | 16.10.2014 | Language: | EN | [2014/42] | Type: | A1 Application with search report | No.: | EP2984596 | Date: | 17.02.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.10.2014 takes the place of the publication of the European patent application. | [2016/07] | Type: | B1 Patent specification | No.: | EP2984596 | Date: | 30.10.2019 | Language: | EN | [2019/44] | Search report(s) | International search report - published on: | US | 16.10.2014 | (Supplementary) European search report - dispatched on: | EP | 13.06.2016 | Classification | IPC: | G05B19/401, B23Q15/22, B23C3/00, G05B19/404, G05B19/4097 | [2019/32] | CPC: |
B23C3/00 (EP,US);
G05B19/4097 (US);
G05B19/404 (EP,US);
B23C2250/00 (US);
G05B2219/37308 (US);
G05B2219/37576 (EP,US);
|
Former IPC [2016/28] | G06F19/00, B23Q15/22, G05B19/401, B23C3/00, G05B19/404, G05B19/4097 | ||
Former IPC [2016/07] | G06F19/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | INVERSE KONTURENBEARBEITUNG ZUR ELIMINIERUNG EINER RESTSPANNUNGSVERZERRUNG | [2016/07] | English: | INVERSE-CONTOUR MACHINING TO ELIMINATE RESIDUAL STRESS DISTORTION | [2016/07] | French: | USINAGE DE CONTOUR INVERSE À DES FINS D'ÉLIMINATION DE DÉFORMATION DE CONTRAINTE RÉSIDUELLE | [2016/07] | Entry into regional phase | 11.11.2015 | National basic fee paid | 11.11.2015 | Search fee paid | 11.11.2015 | Designation fee(s) paid | 11.11.2015 | Examination fee paid | Examination procedure | 11.02.2015 | Request for preliminary examination filed International Preliminary Examining Authority: US | 11.11.2015 | Examination requested [2016/07] | 23.12.2016 | Amendment by applicant (claims and/or description) | 05.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 04.06.2018 | Reply to a communication from the examining division | 17.07.2019 | Communication of intention to grant the patent | 20.09.2019 | Fee for grant paid | 20.09.2019 | Fee for publishing/printing paid | 20.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.02.2018 | Opposition(s) | 31.07.2020 | No opposition filed within time limit [2020/41] | Fees paid | Renewal fee | 11.11.2015 | Renewal fee patent year 03 | 10.02.2017 | Renewal fee patent year 04 | 14.02.2018 | Renewal fee patent year 05 | 13.02.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.02.2014 | AL | 30.10.2019 | AT | 30.10.2019 | CY | 30.10.2019 | CZ | 30.10.2019 | DK | 30.10.2019 | EE | 30.10.2019 | ES | 30.10.2019 | FI | 30.10.2019 | HR | 30.10.2019 | IT | 30.10.2019 | LT | 30.10.2019 | LV | 30.10.2019 | MC | 30.10.2019 | MK | 30.10.2019 | MT | 30.10.2019 | NL | 30.10.2019 | PL | 30.10.2019 | RO | 30.10.2019 | RS | 30.10.2019 | SE | 30.10.2019 | SI | 30.10.2019 | SK | 30.10.2019 | SM | 30.10.2019 | TR | 30.10.2019 | BG | 30.01.2020 | NO | 30.01.2020 | GR | 31.01.2020 | IE | 11.02.2020 | LU | 11.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | FR | 29.02.2020 | IS | 29.02.2020 | LI | 29.02.2020 | PT | 02.03.2020 | [2022/32] |
Former [2022/27] | HU | 11.02.2014 | |
AL | 30.10.2019 | ||
AT | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
MT | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
TR | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IE | 11.02.2020 | ||
LU | 11.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
IS | 29.02.2020 | ||
LI | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/12] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IE | 11.02.2020 | ||
LU | 11.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
IS | 29.02.2020 | ||
LI | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/07] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IE | 11.02.2020 | ||
LU | 11.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
IS | 29.02.2020 | ||
LI | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/51] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
LU | 11.02.2020 | ||
CH | 29.02.2020 | ||
IS | 29.02.2020 | ||
LI | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/50] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
LU | 11.02.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/48] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
LU | 11.02.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/38] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/37] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/36] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/35] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/32] | AL | 30.10.2019 | |
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/25] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/24] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/23] | ES | 30.10.2019 | |
FI | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/22] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/21] | NO | 30.01.2020 | Documents cited: | Search | [A]EP1787176 (RENISHAW PLC [GB]) [A] 1-15 * paragraph [0014] - paragraph [0024] ** paragraph [0051] - paragraph [0056] *; | [XI]US2009132080 (GLASSER ARNDT [DE]) [X] 1,14,15 * paragraph [0001] - paragraph [0028] * * paragraph [0039] - paragraph [0044] * * figures 3-5 * [I] 2-13; | [A] - SUK-HWAN S ET AL, "Incorporation of Tool Deflection in Tool Path Computation: Simulation and Analysis", JOURNAL OF MANUFACTURING SYSTEMS, SOCIETY OF MANUFACTURING ENGINEERS, DEARBORN, MI, US, (19960101), vol. 15, no. 3, ISSN 0278-6125, pages 190 - 199, XP004008185 [A] 1-15 * abstract * * page 193:"Path Modification" * | International search | [A]US2004267462 (BERRY JOHN T [US], et al); | [A]US6934642 (BERRY JOHN T [US], et al); | [X]US6947809 (REN FENG [US], et al); | [A]WO2006008554 (ISIS INNOVATION [GB], et al); | [A] - "Minimizing Destortion in Machining. Diffraction Notes", LAMBDA RESEARCH., (1999), pages 1 - 4, URL: http://www.lambdatechs.com/documents/dn_24.pdf, (20140515), XP055236778 | by applicant | US2009132080 |