EP2986572 - AN OIL FILTRATION SYSTEM FOR SUBSEA OIL-FILLED MACHINES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 18.01.2025 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 13.09.2020 | ||
Former | Examination is in progress Status updated on 28.04.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Onesubsea Processing AS P.O. Box 174 5862 Sandsli, Bergen / NO | [2021/28] |
Former [2016/08] | For all designated states Framo Engineering AS P.O. Box 174 5862 Sandsli, Bergen / NO | Inventor(s) | 01 /
BERLE, Atle, Karstein Framo Engineering AS Sandslikroken 140 P.O. Box 174 N-5862 Bergen / NO | 02 /
ROGNE, Raymond Framo Engineering AS Sandslikroken 140 P.O. Box174 N-5862 Bergen / NO | [2016/08] | Representative(s) | Schlumberger Intellectual Property Department Parkstraat 83 2514 JG Den Haag / NL | [2021/08] |
Former [2016/08] | Haley, Stephen Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | Application number, filing date | 14784908.7 | 15.04.2014 | [2016/08] | WO2014US34107 | Priority number, date | US201361812297P | 16.04.2013 Original published format: US 201361812297 P | [2016/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014172324 | Date: | 23.10.2014 | Language: | EN | [2014/43] | Type: | A1 Application with search report | No.: | EP2986572 | Date: | 24.02.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.10.2014 takes the place of the publication of the European patent application. | [2016/08] | Type: | B1 Patent specification | No.: | EP2986572 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | International search report - published on: | US | 23.10.2014 | (Supplementary) European search report - dispatched on: | EP | 06.10.2016 | Classification | IPC: | F04D13/10, F04D13/06, F04D13/08, F04D25/06, F04D29/06, F04D29/063, F04D29/70, H02K5/132, H02K9/19 | [2020/40] | CPC: |
F04D13/086 (EP,US);
E21B43/36 (EP,US);
B01D29/56 (US);
B01D35/02 (US);
B01D35/147 (US);
B01D35/18 (US);
B01D36/003 (US);
B01D61/366 (US);
B03C1/30 (US);
E21B43/35 (EP,US);
F04D13/0653 (EP,US);
F04D13/10 (EP,US);
F04D25/0686 (EP,US);
F04D29/061 (EP,US);
F04D29/063 (EP,US);
F04D29/701 (EP,US);
F04D29/708 (EP,US);
H02K5/132 (EP,US);
H02K9/19 (EP,US)
(-)
|
Former IPC [2016/44] | C02F103/08, F04D13/06, F04D13/08, F04D13/10, F04D25/06, F04D29/054, F04D29/06, F04D29/063, F04D29/70, H02K5/132, H02K9/19 | ||
Former IPC [2016/08] | C02F103/08, F04D13/08, F04D29/054 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ÖLFILTERVERFAHREN FÜR ÖLGEFÜLLTE UNTERSEEMASCHINEN | [2016/08] | English: | AN OIL FILTRATION SYSTEM FOR SUBSEA OIL-FILLED MACHINES | [2016/08] | French: | SYSTÈME DE FILTRATION DE PÉTROLE POUR MACHINES SOUS-MARINES REMPLIES DE PÉTROLE | [2020/42] |
Former [2016/08] | SYSTEME DE FILTRATION DE PETROLE POUR MACHINES SOUS-MARINES REMPLIES DE PETROLE | Entry into regional phase | 05.10.2015 | National basic fee paid | 05.10.2015 | Search fee paid | 05.10.2015 | Designation fee(s) paid | 05.10.2015 | Examination fee paid | Examination procedure | 05.10.2015 | Examination requested [2016/08] | 10.01.2017 | Amendment by applicant (claims and/or description) | 02.05.2017 | Despatch of a communication from the examining division (Time limit: M06) | 06.11.2017 | Reply to a communication from the examining division | 24.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 02.07.2020 | Reply to a communication from the examining division | 14.09.2020 | Communication of intention to grant the patent | 14.01.2021 | Fee for grant paid | 14.01.2021 | Fee for publishing/printing paid | 14.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] | Fees paid | Renewal fee | 18.07.2016 | Renewal fee patent year 03 | 30.03.2016 | Renewal fee patent year 04 | 27.04.2018 | Renewal fee patent year 05 | 15.04.2019 | Renewal fee patent year 06 | 31.03.2020 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 30.04.2016 | 03   M06   Fee paid on   18.07.2016 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.04.2014 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | ES | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | IT | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | MT | 24.02.2021 | NL | 24.02.2021 | PL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SK | 24.02.2021 | SM | 24.02.2021 | IE | 15.04.2021 | LU | 15.04.2021 | FR | 24.04.2021 | BE | 30.04.2021 | BG | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | [2024/41] |
Former [2024/22] | HU | 15.04.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BE | 30.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/30] | HU | 15.04.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BE | 30.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/29] | HU | 15.04.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BE | 30.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/34] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BE | 30.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/21] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 15.04.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/09] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
LU | 15.04.2021 | ||
FR | 24.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
LU | 15.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/04] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
LU | 15.04.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/51] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/39] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [XI]US2010150740 (VELAND ARNE [NO]) [X] 1-3,14-16,20 * paragraphs [0001] , [00 7] , [0 35] , [0 41] * * figure 6 * [I] 4-13,17-19; | [XI]WO2011049685 (DRESSER RAND CO [US], et al) [X] 1-3,13,14,16,20 * paragraphs [0016] , [0 22] , [0 27] * * figure 1 * [I] 4-12,15,17-19; | [XI]US2011097223 (VERICHEV STANISLAV NIKOLAEVICH [RU], et al) [X] 1-3,14,16,20 * paragraphs [0001] - [0006] - [00 7] , [0 26] , [0 37] , [0 38] * * figures 1, 6 * [I] 4-13,15,17-19; | [A]US2011139625 (ARNTZEN RICHARD [NO], et al) [A] 1-20 * paragraphs [0007] , [0 31] , [0 32] , [0 51] ** figure 1 * | International search | [Y]US3839176 (MC COY L, et al); | [Y]US5044440 (STINESSEN KJELL O [NO], et al); | [Y]US2010129237 (EIDE JORGEN [NO], et al); | [Y]US2011072975 (AAREBROT EIVIND [NO], et al); | [Y]US2011120959 (LEVITT DAVID J [US], et al); | [Y]WO2011161516 (VETCO GRAY SCANDINAVIA AS [NO], et al); | [Y]US2012154609 (OZAKI KOJI [JP]); | [Y]US2012282116 (TOENNESSEN LEIF ARNE [NO]) | Examination | WO0073621 | US2011210003 | by applicant | US2010150740 | WO2011049685 | US2011097223 |