EP3066487 - HALL SENSOR READOUT SYSTEM WITH OFFSET DETERMINATION USING THE HALL ELEMENT ITSELF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 23.03.2018 | ||
Former | Grant of patent is intended Status updated on 26.11.2017 | ||
Former | Request for examination was made Status updated on 09.08.2017 | ||
Former | Grant of patent is intended Status updated on 11.04.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Melexis Technologies NV Transportstraat 1 3980 Tessenderlo / BE | [2018/17] |
Former [2016/37] | For all designated states Melexis Technologies NV Transportstraat 1 3980 Tessenderlo / BE | Inventor(s) | 01 /
RAMAN, Johan Groenevijvers 21 9910 Knesselare / BE | 02 /
ROMBOUTS, Pieter Willemotlaan 14 9030 Mariakerke / BE | [2018/17] |
Former [2016/37] | 01 /
RAMAN, Johan Groenevijvers 21 B-9910 Knesselare / BE | ||
02 /
ROMBOUTS, Pieter Willemotlaan 14 B-9030 Mariakerke / BE | Representative(s) | Winger Leuvensesteenweg 203 3190 Boortmeerbeek / BE | [N/P] |
Former [2016/37] | DenK iP Leuvensesteenweg 203 3190 Boortmeerbeek / BE | Application number, filing date | 14793852.6 | 06.11.2014 | [2016/37] | WO2014EP73856 | Priority number, date | GB20130019627 | 06.11.2013 Original published format: GB 201319627 | [2016/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015067675 | Date: | 14.05.2015 | Language: | EN | [2015/19] | Type: | A1 Application with search report | No.: | EP3066487 | Date: | 14.09.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.05.2015 takes the place of the publication of the European patent application. | [2016/37] | Type: | B1 Patent specification | No.: | EP3066487 | Date: | 25.04.2018 | Language: | EN | [2018/17] | Search report(s) | International search report - published on: | EP | 14.05.2015 | Classification | IPC: | G01R33/00, G01R33/07 | [2016/37] | CPC: |
G01R33/0035 (EP,US);
G01R33/0017 (KR);
G01R15/202 (KR);
G01R33/0029 (EP,KR,US);
G01R33/0082 (EP,KR,US);
G01R33/07 (EP,US);
G01R33/075 (KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | AUSLESESYSTEM FÜR HALLSENSOR MIT OFFSET-BESTIMMUNG UNTER VERWENDUNG DES HALLELEMENTS SELBST | [2017/19] | English: | HALL SENSOR READOUT SYSTEM WITH OFFSET DETERMINATION USING THE HALL ELEMENT ITSELF | [2016/37] | French: | SYSTÈME DE MESURE DE CAPTEUR À EFFET HALL CAPABLE DE DÉTERMINER UN DÉCALAGE AU MOYEN DE L'ÉLÉMENT À EFFET HALL LUI-MÊME | [2016/37] |
Former [2016/37] | AUSLESESYSTEM FÜR HALLSENSOR MIT VERSETZTER BESTIMMUNG UNTER VERWENDUNG DES HALLELEMENTS SELBST | Entry into regional phase | 03.06.2016 | National basic fee paid | 03.06.2016 | Designation fee(s) paid | 03.06.2016 | Examination fee paid | Examination procedure | 06.09.2015 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 03.06.2016 | Examination requested [2016/37] | 02.09.2016 | Amendment by applicant (claims and/or description) | 12.04.2017 | Communication of intention to grant the patent | 01.08.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 27.11.2017 | Communication of intention to grant the patent | 15.03.2018 | Fee for grant paid | 15.03.2018 | Fee for publishing/printing paid | 15.03.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 28.01.2019 | No opposition filed within time limit [2019/14] | Fees paid | Renewal fee | 23.11.2016 | Renewal fee patent year 03 | 24.11.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.11.2014 | AL | 25.04.2018 | AT | 25.04.2018 | CY | 25.04.2018 | CZ | 25.04.2018 | DK | 25.04.2018 | EE | 25.04.2018 | ES | 25.04.2018 | FI | 25.04.2018 | HR | 25.04.2018 | IT | 25.04.2018 | LT | 25.04.2018 | LV | 25.04.2018 | MC | 25.04.2018 | MK | 25.04.2018 | NL | 25.04.2018 | PL | 25.04.2018 | RO | 25.04.2018 | RS | 25.04.2018 | SE | 25.04.2018 | SI | 25.04.2018 | SK | 25.04.2018 | SM | 25.04.2018 | TR | 25.04.2018 | BG | 25.07.2018 | NO | 25.07.2018 | GR | 26.07.2018 | IS | 25.08.2018 | PT | 27.08.2018 | GB | 06.11.2018 | IE | 06.11.2018 | LU | 06.11.2018 | MT | 06.11.2018 | [2020/32] |
Former [2020/31] | HU | 06.11.2014 | |
AL | 25.04.2018 | ||
AT | 25.04.2018 | ||
CY | 25.04.2018 | ||
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
MK | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
TR | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
GB | 06.11.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
MT | 06.11.2018 | ||
Former [2020/16] | AL | 25.04.2018 | |
AT | 25.04.2018 | ||
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
TR | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
GB | 06.11.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
MT | 06.11.2018 | ||
Former [2020/08] | AL | 25.04.2018 | |
AT | 25.04.2018 | ||
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
GB | 06.11.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
MT | 06.11.2018 | ||
Former [2020/03] | AL | 25.04.2018 | |
AT | 25.04.2018 | ||
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
GB | 06.11.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
Former [2019/51] | AL | 25.04.2018 | |
AT | 25.04.2018 | ||
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
Former [2019/48] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 06.11.2018 | ||
LU | 06.11.2018 | ||
Former [2019/34] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
LU | 06.11.2018 | ||
Former [2019/33] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/26] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/11] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
IT | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/10] | AT | 25.04.2018 | |
CZ | 25.04.2018 | ||
DK | 25.04.2018 | ||
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
SK | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/09] | DK | 25.04.2018 | |
EE | 25.04.2018 | ||
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/08] | DK | 25.04.2018 | |
ES | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/03] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2018/52] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
Former [2018/51] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
Former [2018/50] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
Former [2018/49] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
LT | 25.04.2018 | ||
NL | 25.04.2018 | ||
PL | 25.04.2018 | ||
SE | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
Former [2018/47] | ES | 25.04.2018 | |
FI | 25.04.2018 | ||
LT | 25.04.2018 | ||
NL | 25.04.2018 | ||
NO | 25.07.2018 | ||
Former [2018/43] | NL | 25.04.2018 | Cited in | International search | [Y]US4327416 (JERRIM JOHN W); | [X]US4833406 (FOSTER JOHNNY R [US]); | [X]US2001020845 (MUTH MICHAEL [DE]); | [X]EP2360455 (NXP BV [NL]); | [XAY]DE102011102483 (AUSTRIAMICROSYSTEMS AG [AT]); | [X]US2013200909 (RASBORNIG FRIEDRICH [AT], et al) |