EP3058463 - PARALLEL DYNAMIC PROGRAMMING THROUGH RANK CONVERGENCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.06.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 20.07.2018 | ||
Former | Grant of patent is intended Status updated on 20.06.2018 | ||
Former | Request for examination was made Status updated on 28.05.2018 | ||
Former | Grant of patent is intended Status updated on 21.01.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052 / US | [2016/34] | Inventor(s) | 01 /
MYTKOWICZ, Todd D. c/o Microsoft Corporation LCA - International Patents (8/1172) One Microsoft Way Redmond, Washington 98052-6399 / US | 02 /
MUSUVATHI, Madanlal c/o Microsoft Corporation LCA - International Patents (8/1172) One Microsoft Way Redmond, Washington 98052-6399 / US | 03 /
MALEKI, Saeed c/o Microsoft Corporation LCA - International Patents (8/1172) One Microsoft Way Redmond, Washington 98052-6399 / US | [2016/34] | Representative(s) | CMS Cameron McKenna Nabarro Olswang LLP Cannon Place 78 Cannon Street London EC4N 6AF / GB | [2018/34] |
Former [2016/34] | Rees, Alexander Ellison, et al Olswang LLP 90 High Holborn London WC1V 6XX / GB | Application number, filing date | 14793927.6 | 13.10.2014 | [2016/34] | WO2014US60218 | Priority number, date | US201361890824P | 14.10.2013 Original published format: US 201361890824 P | US201414257952 | 21.04.2014 Original published format: US201414257952 | [2016/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015057539 | Date: | 23.04.2015 | Language: | EN | [2015/16] | Type: | A1 Application with search report | No.: | EP3058463 | Date: | 24.08.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.04.2015 takes the place of the publication of the European patent application. | [2016/34] | Type: | B1 Patent specification | No.: | EP3058463 | Date: | 22.08.2018 | Language: | EN | [2018/34] | Search report(s) | International search report - published on: | EP | 23.04.2015 | Classification | IPC: | G06F9/50, G06F17/11, G06K9/62, // H03M13/00, H03M13/41 | [2018/28] | CPC: |
G06F17/11 (EP,US);
G06F8/22 (US);
G06F8/456 (US);
G06F9/5066 (EP,US);
G06Q10/04 (US);
H03M13/41 (EP,US);
H03M13/6561 (EP,US)
(-)
|
Former IPC [2018/01] | G06F9/50, G06F17/11, G06K9/62, // H03M13/00, H03M13/41, G06F9/44, G06F9/45 | ||
Former IPC [2016/34] | G06F9/50, G06Q10/04, G06F17/11, H03M13/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | PARALLELE DYNAMISCHE PROGRAMMIERUNG DURCH RANGKONVERGENZ | [2016/34] | English: | PARALLEL DYNAMIC PROGRAMMING THROUGH RANK CONVERGENCE | [2016/34] | French: | PROGRAMMATION DYNAMIQUE PARALLÈLE PAR CONVERGENCE DE RANG | [2016/34] | Entry into regional phase | 31.03.2016 | National basic fee paid | 31.03.2016 | Designation fee(s) paid | 31.03.2016 | Examination fee paid | Examination procedure | 08.05.2015 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 31.03.2016 | Examination requested [2016/34] | 05.07.2016 | Amendment by applicant (claims and/or description) | 22.01.2018 | Communication of intention to grant the patent | 22.05.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.06.2018 | Communication of intention to grant the patent | 11.07.2018 | Fee for grant paid | 11.07.2018 | Fee for publishing/printing paid | 11.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 23.05.2019 | No opposition filed within time limit [2019/31] | Fees paid | Renewal fee | 11.10.2016 | Renewal fee patent year 03 | 11.10.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.10.2014 | AL | 22.08.2018 | AT | 22.08.2018 | CY | 22.08.2018 | CZ | 22.08.2018 | DK | 22.08.2018 | EE | 22.08.2018 | ES | 22.08.2018 | FI | 22.08.2018 | HR | 22.08.2018 | IT | 22.08.2018 | LT | 22.08.2018 | LV | 22.08.2018 | MC | 22.08.2018 | MK | 22.08.2018 | PL | 22.08.2018 | PT | 22.08.2018 | RO | 22.08.2018 | RS | 22.08.2018 | SE | 22.08.2018 | SI | 22.08.2018 | SK | 22.08.2018 | SM | 22.08.2018 | TR | 22.08.2018 | IE | 13.10.2018 | LU | 13.10.2018 | MT | 13.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | BG | 22.11.2018 | NO | 22.11.2018 | GR | 23.11.2018 | IS | 22.12.2018 | [2020/31] |
Former [2020/28] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
PT | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2020/17] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2020/08] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
MT | 13.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/48] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
IE | 13.10.2018 | ||
LU | 13.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/40] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 13.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/38] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 13.10.2018 | ||
BE | 31.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/37] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 13.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/30] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
LU | 13.10.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/28] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/26] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/23] | AL | 22.08.2018 | |
AT | 22.08.2018 | ||
CZ | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/22] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/21] | AL | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/12] | AL | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/11] | FI | 22.08.2018 | |
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/10] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/08] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NO | 22.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/07] | LT | 22.08.2018 | Cited in | International search | [A]US2013159372 (DZIEDZICKI TOMASZ [PL], et al) [A] 1-10 * abstract * * paragraphs [0002] - [0003] - [0019] , [0021] * * paragraphs [0062] , [0065] - [0067]; figures 1,3,4a,4b,5 *; | [IA] - PRAKASH PRABHU ET AL, "Safe programmable speculative parallelism", PROCEEDINGS OF THE 2009 ACM SIGPLAN CONFERENCE ON PROGRAMMING LANGUAGE DESIGN AND IMPLEMENTATION, PLDI '09, New York, New York, USA, (20100512), vol. 45, no. 6, doi:10.1145/1809028.1806603, ISSN 0362-1340, ISBN 978-1-60-558392-1, page 50, XP055161389 [I] 1 * abstract * * page 50, column r, line 1 - page 51, column r, line 21; figure 1 * [A] 2-10 DOI: http://dx.doi.org/10.1145/1809028.1806603 | [T] - SAEED MALEKI ET AL, "Parallelizing dynamic programming through rank convergence", PRINCIPLES AND PRACTICE OF PARALLEL PROGRAMMING, ACM, 2 PENN PLAZA, SUITE 701 NEW YORK NY 10121-0701 USA, (20140206), doi:10.1145/2555243.2555264, ISBN 978-1-4503-2656-8, pages 219 - 232, XP058037676 [T] 1-10 * the whole document * DOI: http://dx.doi.org/10.1145/2555243.2555264 |