EP2995055 - SYSTEM AND METHOD FOR USING SYNCHRONIZATION SIGNAL AS DEMODULATION REFERENCE SIGNAL [Right-click to bookmark this link] | |||
Former [2016/11] | SYSTEM AND METHOD FOR USING SYNCHRONIZATION SIGNAL FOR DEMODULATION REFERENCE | ||
[2018/09] | Status | No opposition filed within time limit Status updated on 24.05.2019 Database last updated on 12.12.2024 | |
Former | The patent has been granted Status updated on 15.06.2018 | ||
Former | Grant of patent is intended Status updated on 06.02.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states ZTE (USA) INC. 2425 N. Central Expressway, Suite 600 Richardson, TX 75080 / US | [2016/11] | Inventor(s) | 01 /
ZHANG, Wenfeng 3608 Thorp Springs Dr. Plano, TX 75025 / US | 02 /
GUO, Senbao 1H502 Wuxing 9 Xifeng Rd. Chang'an District Xi'an 710114 / CN | 03 /
SUN, Yunfeng 1H502 Wuxing 9 Xifeng Rd. Chang'an District Xi'an 710114 / CN | 04 /
XIA, Shuqiang 1H502 Wuxing 9 Xifeng Rd. Chang'an District Xi'an 710114 / CN | [2016/11] | Representative(s) | AWA Sweden AB Junkersgatan 1 582 35 Linköping / SE | [2018/29] |
Former [2016/11] | Awapatent AB Junkersgatan 1 582 35 Linköping / SE | Application number, filing date | 14794391.4 | 07.05.2014 | [2016/11] | WO2014US37183 | Priority number, date | US201361821630P | 09.05.2013 Original published format: US 201361821630 P | [2016/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014182837 | Date: | 13.11.2014 | Language: | EN | [2014/46] | Type: | A1 Application with search report | No.: | EP2995055 | Date: | 16.03.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.11.2014 takes the place of the publication of the European patent application. | [2016/11] | Type: | B1 Patent specification | No.: | EP2995055 | Date: | 18.07.2018 | Language: | EN | [2018/29] | Search report(s) | International search report - published on: | KR | 13.11.2014 | (Supplementary) European search report - dispatched on: | EP | 28.02.2017 | Classification | IPC: | H04L5/00, H04L27/26, H04W72/04, H04W56/00 | [2017/13] | CPC: |
H04L5/0048 (EP,US);
H04W72/23 (US);
H04L27/261 (EP,US);
H04L5/0094 (EP,US);
H04L5/0096 (EP,US);
H04W56/0015 (EP,US);
H04L5/0023 (EP,US)
(-)
|
Former IPC [2016/11] | H04L27/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR VERWENDUNG EINES SYNCHRONISATIONSSIGNALS ALS DEMODULATIONSREFERENZSIGNAL | [2018/09] | English: | SYSTEM AND METHOD FOR USING SYNCHRONIZATION SIGNAL AS DEMODULATION REFERENCE SIGNAL | [2018/09] | French: | SYSTÈME ET PROCÉDÉ POUR UTILISER UN SIGNAL DE SYNCHRONISATION COMME UN SIGNAL DE RÉFÉRENCE DE DÉMODULATION | [2018/09] |
Former [2016/11] | SYSTEM UND VERFAHREN ZUR VERWENDUNG EINES SYNCHRONISATIONSSIGNALS ZUR DEMODULATIONSREFERENZ | ||
Former [2016/11] | SYSTEM AND METHOD FOR USING SYNCHRONIZATION SIGNAL FOR DEMODULATION REFERENCE | ||
Former [2016/11] | SYSTÈME ET PROCÉDÉ POUR UTILISER UN SIGNAL DE SYNCHRONISATION POUR UNE RÉFÉRENCE DE DÉMODULATION | Entry into regional phase | 19.11.2015 | National basic fee paid | 19.11.2015 | Search fee paid | 19.11.2015 | Designation fee(s) paid | 19.11.2015 | Examination fee paid | Examination procedure | 19.11.2015 | Examination requested [2016/11] | 28.08.2017 | Amendment by applicant (claims and/or description) | 07.02.2018 | Communication of intention to grant the patent | 05.06.2018 | Fee for grant paid | 05.06.2018 | Fee for publishing/printing paid | 05.06.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 23.04.2019 | No opposition filed within time limit [2019/26] | Fees paid | Renewal fee | 29.11.2016 | Renewal fee patent year 03 | 29.04.2017 | Renewal fee patent year 04 | 28.04.2018 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 31.05.2016 | 03   M06   Fee paid on   29.11.2016 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.05.2014 | AL | 18.07.2018 | AT | 18.07.2018 | CY | 18.07.2018 | CZ | 18.07.2018 | DK | 18.07.2018 | EE | 18.07.2018 | ES | 18.07.2018 | FI | 18.07.2018 | HR | 18.07.2018 | IT | 18.07.2018 | LT | 18.07.2018 | LV | 18.07.2018 | MC | 18.07.2018 | MK | 18.07.2018 | MT | 18.07.2018 | NL | 18.07.2018 | PL | 18.07.2018 | RO | 18.07.2018 | RS | 18.07.2018 | SE | 18.07.2018 | SI | 18.07.2018 | SK | 18.07.2018 | SM | 18.07.2018 | TR | 18.07.2018 | BG | 18.10.2018 | NO | 18.10.2018 | GR | 19.10.2018 | IS | 18.11.2018 | PT | 18.11.2018 | [2022/31] |
Former [2021/34] | HU | 07.05.2014 | |
AL | 18.07.2018 | ||
AT | 18.07.2018 | ||
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
MT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
TR | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2021/32] | HU | 07.05.2014 | |
AL | 18.07.2018 | ||
AT | 18.07.2018 | ||
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
TR | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2021/26] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
TR | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2020/29] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
TR | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2020/16] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
TR | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2020/07] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/37] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/26] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SK | 18.07.2018 | ||
SM | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/23] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
EE | 18.07.2018 | ||
ES | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/22] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
CZ | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/21] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
IT | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/12] | AL | 18.07.2018 | |
AT | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/11] | AT | 18.07.2018 | |
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/10] | AT | 18.07.2018 | |
FI | 18.07.2018 | ||
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RS | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/08] | FI | 18.07.2018 | |
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
NO | 18.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/07] | LT | 18.07.2018 | |
NL | 18.07.2018 | ||
Former [2019/04] | NL | 18.07.2018 | Documents cited: | Search | [XAYI] - HTC, "Transmissions of PSS/SSS and DM-RS in Unsynchronised New Carriers", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130118), 3GPP DRAFT; R1-130306 TRANSMISSIONS OF PSS-SSS AND DM-RS IN UNSYNCHRONISED NEW CARRIERS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130118), XP050663403 [X] 1 * sec.1+2; page 1 * * sec.3.1; page 2 * * figures 1,2 * [A] 6-9,11-13 [Y] 2-5,10,15 [I] 14 | [YA] - TEXAS INSTRUMENTS, "Location of PSS/SSS on the New Carrier Type", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130129), 3GPP DRAFT; R1-130696 LOCATION OF PSS AND SSS ON NCT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130129), XP050663946 [Y] 2-5,10,15 * page 2, line 1 - line 2 * [A] 1,6-9,11-14 | [A] - PANTECH, "On PSS/SSS details for NCT", vol. RAN WG1, no. St. Julian; 20130128 - 20130201, (20130119), 3GPP DRAFT; R1-130518, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130119), XP050663784 [A] 1-15 * the whole document * | [A] - NTT DOCOMO, "Views on DL RS for New Carrier Type", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130119), 3GPP DRAFT; R1-130397 SCENARIO FOR NCT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130119), XP050663681 [A] 1-15 * the whole document * | International search | [A]WO2013006379 (DINAN ESMAEL HEJAZI [US]); | [A] - HTC, "Considerations on New DL DMRS Patterns in NCT", 3GPP TSG RAN2 WG1 MEETING #72BIS,R1-131201, CHICAGO, USA, (20130415), pages 1 - 4, XP050697115 | [A] - PANTECH, "On PSS/SSS details for NCT", 3GPP TSG RAN2 WG1 #71,R1-125035, NEW ORLEANS, USA, (20121112), pages 1 - 4, XP050662928 | [A] - HITACHI LTD., "Performance Evaluation of DMRS for NCT", 3GPP TSG RAN2 WG1 MEETING #72BIS,R1-131148, CHICAGO, USA, (20130415), pages 1 - 6, XP050696773 | [A] - TEXAS INSTRUMENTS, "Location of PSS/SSS on the New Carrier Type", 3GPP TSG RAN2 WG1 #71,R1-125225, NEW ORLEANS, USA, (20121112), pages 1 - 2, XP050663082 | by applicant | - HTC, "Transmissions of PSS/SSS and DM-RS in Unsynchronized New Carriers", 3GPP DRAFT; Rl-130306, (20130118), pages 20130128 - 20130201 | - TEXAS INSTRUMENTS, "Location of PSS/SSS on the New Carrier Type", 3GPP DRAFT; Rl-130696, (20130129), pages 20130128 - 20130201 | - NCT. PANTECH, "On PSS/SSS details for NCT", 3GPP DRAFT; RI-130518, (20130119), pages 20130128 - 20130201 | - "Views on DL RS for New Carrier Type", 3GPP DRAFT; Rl-130397, NTT DOCOMO, (20130119), pages 20130128 - 20130201 |