| EP3007254 - TRANSITION METAL COMPOSITE HYDROXIDE PARTICLES, METHOD FOR PRODUCING SAME, POSITIVE ELECTRODE ACTIVE MATERIAL FOR NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY, METHOD FOR PRODUCING SAME, AND NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 17.03.2023 | ||
| Former | Grant of patent is intended Status updated on 30.11.2022 | ||
| Former | Examination is in progress Status updated on 05.07.2022 | ||
| Former | Grant of patent is intended Status updated on 09.05.2022 | ||
| Former | Examination is in progress Status updated on 04.09.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Sumitomo Metal Mining Co., Ltd. 5-11-3, Shimbashi Minato-ku Tokyo, 105-8716 / JP | [2016/15] | Inventor(s) | 01 /
KAMATA, Yasutaka c/o Battery Research Laboratories SUMITOMO METAL MINING CO. LTD. 17-3 Isoura-cho Niihama-shi Ehime 792-0002 / JP | 02 /
AIDA, Taira c/o Battery Research Laboratories SUMITOMO METAL MINING CO. LTD. 17-3 Isoura-cho Niihama-shi Ehime 792-0002 / JP | 03 /
TOYA, Hiroyuki c/o Battery Research Laboratories SUMITOMO METAL MINING CO. LTD. 17-3 Isoura-cho Niihama-shi Ehime 792-0002 / JP | [2016/15] | Representative(s) | Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2023/16] |
| Former [2016/15] | Moreland, David Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | Application number, filing date | 14794571.1 | 12.05.2014 | [2016/15] | WO2014JP62637 | Priority number, date | JP20130100034 | 10.05.2013 Original published format: JP 2013100034 | [2016/15] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014181891 | Date: | 13.11.2014 | Language: | JA | [2014/46] | Type: | A1 Application with search report | No.: | EP3007254 | Date: | 13.04.2016 | Language: | EN | [2016/15] | Type: | B1 Patent specification | No.: | EP3007254 | Date: | 19.04.2023 | Language: | EN | [2023/16] | Search report(s) | International search report - published on: | JP | 13.11.2014 | (Supplementary) European search report - dispatched on: | EP | 22.11.2016 | Classification | IPC: | H01M4/525, C01G53/00, H01M4/36, H01M4/485, H01M4/505 | [2016/15] | CPC: |
H01M4/525 (EP,US);
C01G53/04 (US);
C01G53/82 (EP,US);
C30B1/04 (US);
C30B1/10 (US);
C30B29/10 (US);
C30B29/22 (US);
C30B7/14 (US);
H01M10/052 (US);
H01M4/485 (EP,US);
H01M4/505 (EP,US);
C01P2004/03 (EP,US);
C01P2004/20 (US);
C01P2004/50 (US);
C01P2004/51 (EP,US);
C01P2004/61 (EP,US);
H01M2004/028 (US);
H01M2220/20 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ÜBERGANGSMETALLVERBUNDHYDROXIDPARTIKEL, VERFAHREN ZUR HERSTELLUNG DAVON, POSITIVES ELEKTRODENAKTIVMATERIAL FÜR SEKUNDÄRBATTERIEN MIT WASSERFREIEM ELEKTROLYT, VERFAHREN ZUR HERSTELLUNG DAVON UND SEKUNDÄRBATTERIE MIT WASSERFREIEM ELEKTROLYT | [2016/15] | English: | TRANSITION METAL COMPOSITE HYDROXIDE PARTICLES, METHOD FOR PRODUCING SAME, POSITIVE ELECTRODE ACTIVE MATERIAL FOR NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY, METHOD FOR PRODUCING SAME, AND NON-AQUEOUS ELECTROLYTE SECONDARY BATTERY | [2016/15] | French: | PARTICULES D'HYDROXYDE COMPOSITE DE MÉTAL DE TRANSITION ET PROCÉDÉ DE PRODUCTION DE CELLES-CI, MATÉRIAU ACTIF D'ÉLECTRODE POSITIVE POUR BATTERIE SECONDAIRE À ÉLECTROLYTE NON AQUEUX ET PROCÉDÉ DE PRODUCTION DE CELUI-CI, AINSI QUE BATTERIE SECONDAIRE À ÉLECTROLYTE NON AQUEUX | [2016/15] | Entry into regional phase | 23.11.2015 | Translation filed | 23.11.2015 | National basic fee paid | 23.11.2015 | Search fee paid | 23.11.2015 | Designation fee(s) paid | 23.11.2015 | Examination fee paid | Examination procedure | 23.11.2015 | Examination requested [2016/15] | 09.06.2017 | Amendment by applicant (claims and/or description) | 09.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 17.01.2020 | Reply to a communication from the examining division | 10.05.2022 | Communication of intention to grant the patent | 05.07.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.07.2022 | Fee for grant paid | 05.07.2022 | Fee for publishing/printing paid | 08.12.2022 | Communication of intention to grant the patent | 08.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 29.02.2016 | Renewal fee patent year 03 | 28.04.2017 | Renewal fee patent year 04 | 25.05.2018 | Renewal fee patent year 05 | 23.05.2019 | Renewal fee patent year 06 | 30.03.2020 | Renewal fee patent year 07 | 18.05.2021 | Renewal fee patent year 08 | 25.03.2022 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 12.05.2014 | HU | 12.05.2014 | AL | 19.04.2023 | AT | 19.04.2023 | BG | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | ES | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | IT | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | MC | 19.04.2023 | NL | 19.04.2023 | PL | 19.04.2023 | RO | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | TR | 19.04.2023 | IE | 12.05.2023 | LU | 12.05.2023 | BE | 31.05.2023 | CH | 31.05.2023 | LI | 31.05.2023 | NO | 19.07.2023 | GR | 20.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | [2026/04] |
| Former [2025/39] | CY | 12.05.2014 | |
| HU | 12.05.2014 | ||
| AL | 19.04.2023 | ||
| AT | 19.04.2023 | ||
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| BE | 31.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2025/36] | CY | 12.05.2014 | |
| AL | 19.04.2023 | ||
| AT | 19.04.2023 | ||
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| BE | 31.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/51] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| BE | 31.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/26] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| BE | 31.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/24] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| BE | 31.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/21] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| IE | 12.05.2023 | ||
| LU | 12.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/10] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| LU | 12.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/09] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| LU | 12.05.2023 | ||
| CH | 31.05.2023 | ||
| LI | 31.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/08] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| LU | 12.05.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/03] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/01] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/51] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/50] | AL | 19.04.2023 | |
| AT | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/48] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| NL | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/46] | ES | 19.04.2023 | |
| NL | 19.04.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/43] | NL | 19.04.2023 | Documents cited: | Search | [X] WO2012169274 (SUMITOMO METAL MINING CO et al.) [X] 1-19 * page 20, paragraph [0096] - page 21, paragraph [0101] * * examples 1-8 * | [YD] JP2012246199 (SUMITOMO METAL MINING CO et al.) [YD] 1-19 * examples 1-10 * | [YD] WO2012131881 (SUMITOMO METAL MINING CO et al.) [YD] 1-19 * examples 1-8 * | [Y] US2012270107 (TOYA HIROYUKI et al.) [Y] 1-19 * page 15, paragraph [0234] - page 18, paragraph [0268]; examples 1-16 * | International search | [A] WO2012169274 (SUMITOMO METAL MINING CO et al.) [A] | [A] WO2012165654 (SUMITOMO METAL MINING CO et al.) [A] | [A] JP2012246199 (SUMITOMO METAL MINING CO et al.) [A] | [A] WO2012131881 (SUMITOMO METAL MINING CO et al.) [A] | [A] WO2011067982 (TOYOTA MOTOR CO LTD et al.) [A] | [A] JPH1074517 (MURATA MANUFACTURING CO et al.) [A] | [A] JP2004253174 (NICHIA KAGAKU KOGYO KK et al.) [A] | by applicant | JP2012246199 | JP2013147416 | WO2012131881 | WO2013131881 |