blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3059998

EP3059998 - RESOURCE STATUS OBTAINING METHOD, APPARATUS, SYSTEM AND COMPUTER STORAGE MEDIUM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  27.10.2019
FormerExamination is in progress
Status updated on  15.06.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[2020/13]
Former [2016/34]For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
Inventor(s)01 / GENG, Tian
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan
Shenzhen Guangdong 518057 / CN
 [2016/34]
Representative(s)Ligi, Stefano, et al
GLP S.r.l.
Viale Europa Unita, 171
33100 Udine / IT
[2020/13]
Former [2016/34]Lavoix
Bayerstrasse 83
80335 München / DE
Application number, filing date14794796.408.05.2014
[2016/34]
WO2014CN77065
Priority number, dateCN20131049520518.10.2013         Original published format: CN201310495205
[2016/34]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014180330
Date:13.11.2014
Language:ZH
[2014/46]
Type: A1 Application with search report 
No.:EP3059998
Date:24.08.2016
Language:EN
[2016/34]
Type: B1 Patent specification 
No.:EP3059998
Date:25.03.2020
Language:EN
[2020/13]
Search report(s)International search report - published on:CN13.11.2014
(Supplementary) European search report - dispatched on:EP11.10.2016
ClassificationIPC:H04W28/08, H04L1/00, // H04W92/20
[2019/44]
CPC:
H04L1/00 (EP,US); H04W72/00 (CN); H04W72/54 (US);
H04L1/1614 (US); H04W72/53 (US); H04W28/0861 (EP,CN,US);
H04W92/20 (EP,US) (-)
Former IPC [2016/45]H04W28/08, // H04W92/20
Former IPC [2016/34]H04W28/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/34]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN FÜR DEN ERHALT EINES RESSOURCENSTATUS, VORRICHTUNG, SYSTEM UND COMPUTERSPEICHERMEDIUM[2016/34]
English:RESOURCE STATUS OBTAINING METHOD, APPARATUS, SYSTEM AND COMPUTER STORAGE MEDIUM[2016/34]
French:PROCÉDÉ, APPAREIL, SYSTÈME ET SUPPORT DE STOCKAGE INFORMATIQUE D'OBTENTION DE L'ÉTAT D'UNE RESSOURCE[2016/34]
Entry into regional phase03.05.2016Translation filed 
03.05.2016National basic fee paid 
03.05.2016Search fee paid 
03.05.2016Designation fee(s) paid 
03.05.2016Examination fee paid 
Examination procedure03.05.2016Examination requested  [2016/34]
20.04.2017Amendment by applicant (claims and/or description)
22.06.2018Despatch of a communication from the examining division (Time limit: M04)
19.10.2018Reply to a communication from the examining division
28.10.2019Communication of intention to grant the patent
18.02.2020Fee for grant paid
18.02.2020Fee for publishing/printing paid
18.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
03.05.2016Renewal fee patent year 03
22.05.2017Renewal fee patent year 04
30.05.2018Renewal fee patent year 05
30.05.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.05.2014
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
DE01.12.2020
[2022/31]
Former [2022/30]HU08.05.2014
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
DE01.12.2020
Former [2022/27]HU08.05.2014
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
DE01.12.2020
Former [2021/25]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
DE01.12.2020
Former [2021/23]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
FR25.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/20]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
IE08.05.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/15]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/07]CZ25.03.2020
DK25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
CH31.05.2020
LI31.05.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]CZ25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]CZ25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/45]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Documents cited:Search[XI]US2006251013  (ROY VINCENT [CA], et al) [X] 1,6,11 * abstract * * figure 2 * * paragraphs [0008] , [0014] , [0018] , [0038] , [0039] , [0046] , [0047] - [0048] * [I] 2-4,7-9;
 [XI]EP2337395  (HUAWEI TECH CO LTD [CN]) [X] 1,5,6,10,11 * abstract * * paragraphs [0002] , [0003] , [0007] , [0012] , [0018] , [0019] , [0121] - [0134]; figures 1,10,11 * [I] 2-4,7-9;
 [XI]US2011249642  (SONG OSOK [US], et al) [X] 1,4-6,9-11 * abstract * * figures 7,9,10 * * paragraphs [0003] , [0008] - [0015] - [0029] , [0034] , [0054] , [0079] - [0084] - [0096] , [0111] - [0115] * [I] 2,3,7,8;
 [A]EP2416605  (HUAWEI TECH CO LTD [CN]) [A] 1-11* the whole document *
International search[Y]CN101610537  (UNIV XIDIAN [CN]);
 [Y]CN102131237  (TELECOM SCIENCE TECHNOLOGY RES INST);
 [A]WO2011149081  (KYOCERA CORP [JP], et al);
 [Y]  - LTE, "X2 application protocol (X2 AP)", 3GPP TS 36.423 V10.7.0, (20130930), page 24, XP050915189
 [A]  - LTE, "X2 application protocol (X2 AP", 3GPP TS 36.423 V10.7.0, (20130930), XP050915189
ExaminationCN102056240B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.