| EP2997669 - COMMUNICATION METHOD AND DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.01.2021 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 07.02.2020 | ||
| Former | Grant of patent is intended Status updated on 14.11.2019 | ||
| Former | Examination is in progress Status updated on 26.01.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2016/12] | Inventor(s) | 01 /
KANG, Hyuk 201-1104 67 Pungdeokcheon-ro 22beon-gil Suji-gu Yongin-si Gyeonggi-do 448-506 / KR | 02 /
LEE, Geun-ho 703-1702 10 Naejeong-ro Bundang-gu Seongnam-si Gyeonggi-do 463-834 / KR | 03 /
LEE, Sang-hyup 201-1604 66 Maetan-ro 126beon-gil Yeongtong-gu Suwon-si Gyeonggi-do 443-848 / KR | [2016/12] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2016/12] | Application number, filing date | 14798467.8 | 14.05.2014 | [2016/12] | WO2014KR04333 | Priority number, date | KR20130056050 | 16.05.2013 Original published format: KR 20130056050 | [2016/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014185712 | Date: | 20.11.2014 | Language: | EN | [2014/47] | Type: | A1 Application with search report | No.: | EP2997669 | Date: | 23.03.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.11.2014 takes the place of the publication of the European patent application. | [2016/12] | Type: | B1 Patent specification | No.: | EP2997669 | Date: | 11.03.2020 | Language: | EN | [2020/11] | Search report(s) | International search report - published on: | KR | 20.11.2014 | (Supplementary) European search report - dispatched on: | EP | 21.03.2017 | Classification | IPC: | H04B7/24, H04M1/725, H04W8/00, H04L29/06 | [2019/14] | CPC: |
H04L67/303 (EP,US);
H04B7/24 (KR);
H04W24/08 (US);
H04L69/14 (EP,US);
H04L69/18 (EP,US);
H04M1/72412 (EP,US);
H04W4/80 (EP,US);
H04L69/24 (EP,US);
H04M1/2755 (EP,US);
H04M2250/02 (EP,US);
H04M2250/12 (EP,US);
H04W76/14 (EP,US);
|
| Former IPC [2017/02] | H04B7/24, H04M1/725, H04W76/02, H04W8/00, H04L29/06 | ||
| Former IPC [2016/12] | H04B7/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KOMMUNIKATIONSVERFAHREN UND -VORRICHTUNG | [2016/12] | English: | COMMUNICATION METHOD AND DEVICE | [2016/12] | French: | PROCÉDÉ ET DISPOSITIF DE COMMUNICATION | [2016/12] | Entry into regional phase | 16.11.2015 | National basic fee paid | 16.11.2015 | Search fee paid | 16.11.2015 | Designation fee(s) paid | 16.11.2015 | Examination fee paid | Examination procedure | 16.11.2015 | Examination requested [2016/12] | 20.07.2017 | Amendment by applicant (claims and/or description) | 24.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 24.05.2018 | Reply to a communication from the examining division | 26.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.11.2018 | Reply to a communication from the examining division | 19.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 17.07.2019 | Reply to a communication from the examining division | 15.11.2019 | Communication of intention to grant the patent | 30.01.2020 | Fee for grant paid | 30.01.2020 | Fee for publishing/printing paid | 30.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.12.2020 | No opposition filed within time limit [2021/07] | Fees paid | Renewal fee | 25.04.2016 | Renewal fee patent year 03 | 26.04.2017 | Renewal fee patent year 04 | 23.05.2018 | Renewal fee patent year 05 | 22.05.2019 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.05.2014 | AL | 11.03.2020 | AT | 11.03.2020 | CY | 11.03.2020 | CZ | 11.03.2020 | DK | 11.03.2020 | EE | 11.03.2020 | ES | 11.03.2020 | FI | 11.03.2020 | HR | 11.03.2020 | IT | 11.03.2020 | LT | 11.03.2020 | LV | 11.03.2020 | MC | 11.03.2020 | MK | 11.03.2020 | MT | 11.03.2020 | PL | 11.03.2020 | RO | 11.03.2020 | RS | 11.03.2020 | SE | 11.03.2020 | SI | 11.03.2020 | SK | 11.03.2020 | SM | 11.03.2020 | TR | 11.03.2020 | IE | 14.05.2020 | LU | 14.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | FR | 31.05.2020 | LI | 31.05.2020 | BG | 11.06.2020 | GB | 11.06.2020 | NO | 11.06.2020 | GR | 12.06.2020 | IS | 11.07.2020 | PT | 05.08.2020 | [2022/31] |
| Former [2022/30] | HU | 14.05.2014 | |
| AL | 11.03.2020 | ||
| AT | 11.03.2020 | ||
| CY | 11.03.2020 | ||
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| MT | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| TR | 11.03.2020 | ||
| IE | 14.05.2020 | ||
| LU | 14.05.2020 | ||
| BE | 31.05.2020 | ||
| CH | 31.05.2020 | ||
| FR | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| GB | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2022/27] | HU | 14.05.2014 | |
| AT | 11.03.2020 | ||
| CY | 11.03.2020 | ||
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| MT | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| TR | 11.03.2020 | ||
| IE | 14.05.2020 | ||
| LU | 14.05.2020 | ||
| BE | 31.05.2020 | ||
| CH | 31.05.2020 | ||
| FR | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| GB | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/23] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| IE | 14.05.2020 | ||
| LU | 14.05.2020 | ||
| BE | 31.05.2020 | ||
| CH | 31.05.2020 | ||
| FR | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| GB | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/22] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| IE | 14.05.2020 | ||
| LU | 14.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| GB | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/20] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| IE | 14.05.2020 | ||
| LU | 14.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/15] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| LU | 14.05.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/10] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| PL | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SI | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/09] | AT | 11.03.2020 | |
| CZ | 11.03.2020 | ||
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| IT | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| MC | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/08] | CZ | 11.03.2020 | |
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| ES | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2021/07] | CZ | 11.03.2020 | |
| DK | 11.03.2020 | ||
| EE | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| CH | 31.05.2020 | ||
| LI | 31.05.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2020/50] | CZ | 11.03.2020 | |
| EE | 11.03.2020 | ||
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2020/49] | CZ | 11.03.2020 | |
| FI | 11.03.2020 | ||
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SK | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2020/48] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RO | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| SM | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| PT | 05.08.2020 | ||
| Former [2020/47] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LT | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| Former [2020/46] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| IS | 11.07.2020 | ||
| Former [2020/39] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| BG | 11.06.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| Former [2020/38] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| NO | 11.06.2020 | ||
| GR | 12.06.2020 | ||
| Former [2020/37] | FI | 11.03.2020 | |
| HR | 11.03.2020 | ||
| LV | 11.03.2020 | ||
| RS | 11.03.2020 | ||
| SE | 11.03.2020 | ||
| NO | 11.06.2020 | ||
| Former [2020/35] | FI | 11.03.2020 | |
| NO | 11.06.2020 | Documents cited: | Search | [X] WO2012170051 (QUALCOMM ATHEROS INC et al.) [X] 1-9,11,12,14 * figures 2, 5, 6, 9 * * paragraph [0050] - paragraph [0054] * * paragraph [0082] - paragraph [0083] * * paragraph [0091] - paragraph [0095] * * paragraph [0097] * | [X] US2008003946 (LEE SUNG HWAN et al.) [X] 1,4-7,10,11 * figure 4 * * paragraph [0052] - paragraph [0055] * * paragraph [0063] - paragraph [0064] * | [X] US2013029596 (PRESTON JOHN B et al.) [X] 1,3,11 * figure 1 * * paragraph [0030] - paragraph [0031] * * paragraph [0033] * * paragraph [0044] * | [X] US2006258289 (DUA ROBIN et al.) [X] 1,8,9,11 * figure 5 * * figure 8a * * paragraph [0160] * * paragraph [0163] * | International search | [A] US2008200166 (MCCAMON MICHAEL G et al.) [A] | [A] WO2007072135 (NOKIA CORP et al.) [A] | [A] US2011183620 (EISENBACH ANDRE et al.) [A] | [A] US2011028117 (PAN YANG et al.) [A] | [A] KR20130030153 (LG ELECTRONICS INC et al.) [A] |