EP3001227 - OPTICAL FILM, METHOD FOR PRODUCING OPTICAL FILM, AND SURFACE LIGHT-EMITTING BODY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.10.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 26.10.2018 | ||
Former | Grant of patent is intended Status updated on 12.06.2018 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Mitsubishi Chemical Corporation 1-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8251 / JP | [2017/51] |
Former [2017/35] | For all designated states Mitsubishi Chemical Corporation 1-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8251 / JP | ||
Former [2016/13] | For all designated states Mitsubishi Rayon Co., Ltd. 1-1, Marunouchi 1-chome Chiyoda-ku Tokyo 100-8253 / JP | Inventor(s) | 01 /
OKUNO Daichi c/o Yokohama Research Laboratories Mitsubishi Rayon Co. Ltd. 10-1 Daikoku-cho Tsurumi-ku Yokohama-shi Kanagawa 230-0053 / JP | 02 /
TODA Masatoshi c/o Mitsubishi Rayon Co. Ltd. 1-1 Marunouchi 1-chome Chiyoda-ku Tokyo 100-8253 / JP | [2016/13] | Representative(s) | TBK Bavariaring 4-6 80336 München / DE | [2016/13] | Application number, filing date | 14801695.9 | 20.05.2014 | [2016/13] | WO2014JP63310 | Priority number, date | JP20130108607 | 23.05.2013 Original published format: JP 2013108607 | [2016/13] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014189035 | Date: | 27.11.2014 | Language: | JA | [2014/48] | Type: | A1 Application with search report | No.: | EP3001227 | Date: | 30.03.2016 | Language: | EN | [2016/13] | Type: | B1 Patent specification | No.: | EP3001227 | Date: | 28.11.2018 | Language: | EN | [2018/48] | Search report(s) | International search report - published on: | JP | 27.11.2014 | (Supplementary) European search report - dispatched on: | EP | 13.04.2016 | Classification | IPC: | G02B3/00, B32B7/02, C08F2/50, H01L51/50, H05B33/02 | [2016/13] | CPC: |
B29D11/00288 (EP,US);
B29D11/00365 (US);
B32B27/308 (EP,US);
B32B27/40 (EP,US);
B32B5/145 (EP,US);
C08F2/48 (EP,US);
C08F222/10 (EP,US);
C08F290/067 (EP,US);
C08G18/672 (EP,US);
C08G18/673 (EP,US);
C08G18/725 (EP,US);
C08G18/73 (EP,US);
C08G18/792 (EP,US);
C08G18/8175 (EP,US);
C09D175/16 (EP,US);
F21V5/004 (EP,US);
G02B1/041 (US);
G02B3/0012 (EP,US);
G02B3/0031 (US);
G02B3/0043 (EP,US);
G02B3/005 (EP,US);
G02B3/0056 (EP,US);
B32B2307/21 (EP,US);
B32B2307/3065 (EP,US);
B32B2307/554 (EP,US);
B32B2307/558 (EP,US);
B32B2307/712 (EP,US);
B32B2551/00 (EP,US);
C08F220/343 (EP,US);
C08F222/102 (EP,US);
C08F222/105 (EP,US);
C08F222/1065 (EP,US);
C08F222/1067 (EP,US);
H10K50/858 (EP,US)
(-)
| C-Set: |
C08F222/103, C08F220/20 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | OPTISCHE FOLIE, VERFAHREN ZUR HERSTELLUNG EINER OPTISCHEN FOLIE UND OBERFLÄCHENLICHTEMITTIERENDER KÖRPER | [2016/13] | English: | OPTICAL FILM, METHOD FOR PRODUCING OPTICAL FILM, AND SURFACE LIGHT-EMITTING BODY | [2016/13] | French: | FILM OPTIQUE, PROCÉDÉ DE PRODUCTION DE FILM OPTIQUE, ET CORPS À SURFACE ÉLECTROLUMINESCENTE | [2016/13] | Entry into regional phase | 18.11.2015 | Translation filed | 18.11.2015 | National basic fee paid | 18.11.2015 | Search fee paid | 18.11.2015 | Designation fee(s) paid | 18.11.2015 | Examination fee paid | Examination procedure | 18.11.2015 | Examination requested [2016/13] | 09.11.2016 | Amendment by applicant (claims and/or description) | 07.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 16.08.2017 | Reply to a communication from the examining division | 25.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 08.02.2018 | Reply to a communication from the examining division | 13.06.2018 | Communication of intention to grant the patent | 17.10.2018 | Fee for grant paid | 17.10.2018 | Fee for publishing/printing paid | 17.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 29.08.2019 | No opposition filed within time limit [2019/45] | Fees paid | Renewal fee | 31.03.2016 | Renewal fee patent year 03 | 30.05.2017 | Renewal fee patent year 04 | 29.05.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.05.2014 | AL | 28.11.2018 | AT | 28.11.2018 | CY | 28.11.2018 | CZ | 28.11.2018 | DK | 28.11.2018 | EE | 28.11.2018 | ES | 28.11.2018 | FI | 28.11.2018 | HR | 28.11.2018 | IT | 28.11.2018 | LT | 28.11.2018 | LV | 28.11.2018 | MC | 28.11.2018 | MK | 28.11.2018 | MT | 28.11.2018 | NL | 28.11.2018 | PL | 28.11.2018 | RO | 28.11.2018 | RS | 28.11.2018 | SE | 28.11.2018 | SI | 28.11.2018 | SK | 28.11.2018 | SM | 28.11.2018 | TR | 28.11.2018 | BG | 28.02.2019 | NO | 28.02.2019 | GR | 01.03.2019 | IS | 28.03.2019 | PT | 28.03.2019 | IE | 20.05.2019 | LU | 20.05.2019 | BE | 31.05.2019 | CH | 31.05.2019 | FR | 31.05.2019 | LI | 31.05.2019 | [2022/31] |
Former [2021/34] | HU | 20.05.2014 | |
AL | 28.11.2018 | ||
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
MT | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
FR | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2021/32] | HU | 20.05.2014 | |
AL | 28.11.2018 | ||
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
FR | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2021/26] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
FR | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/29] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
FR | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/26] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/21] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 20.05.2019 | ||
LU | 20.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/17] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
LU | 20.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/11] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
LU | 20.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/07] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/50] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/40] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/37] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/35] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/34] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/30] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/26] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/25] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
RS | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/24] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/23] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/22] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/21] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/20] | LT | 28.11.2018 | |
NO | 28.02.2019 | Documents cited: | Search | [A]JP2000156486 (MATSUSHITA ELECTRIC IND CO LTD) [A] 1-3 * solid state imaging device; microlenses (2) with anti-rflective coating (1); paragraph [0019]; figure 1 *; | [A]US2004012734 (YAMANAKA HIDEO [JP], et al) [A] 14* paragraph [0115] - paragraph [0119]; figure 6 *; | [IA]US2004185588 (FUKUYOSHI KENZO [JP], et al) [I] 1,18 * microlens 10 is hemispherical and has a hemispherical transparent resin upper layer 10a and a colored lower layer 10b; paragraph [0043]; figure 1 * * infrared absorbing layer (26) and a thin film of a low refractive index resin (27); paragraph [0101]; figure 6 * [A] 2,3; | [A]US2006187552 (HUANG PIN-CHIEN [TW], et al) [A] 1-3 * paragraph [0029]; figure 4 *; | [E]EP2787374 (MITSUBISHI RAYON CO [JP]) [E] 8-10,18 * resin A: active energy ray curing composition (1);; examples 19,20 * | International search | [Y]JPH01302201 (DAINIPPON PRINTING CO LTD); | [Y]JPH0772808 (TORAY INDUSTRIES); | [Y]JPH11156869 (KURARAY CO); | [X]JP2000227506 (DAINIPPON PRINTING CO LTD); | [A]JP2010515778 (MITSUI CHEMICALS, INC.); | [Y]JP2013003300 (MITSUBISHI RAYON CO); | [A]WO2013005769 (MITSUBISHI RAYON CO [JP], et al) | by applicant | WO2008069324 | JP2009025774 | JP2011123204 |