| EP3003574 - METHOD FOR INSTALLING A PIPE LINER [Right-click to bookmark this link] | |||
| Former [2016/15] | PRESSURE INFUSION LINING SYSTEM | ||
| [2020/13] | Status | No opposition filed within time limit Status updated on 02.07.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 24.07.2020 | ||
| Former | Grant of patent is intended Status updated on 03.03.2020 | ||
| Former | Examination is in progress Status updated on 13.07.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Warren Environmental & Coating, LLC 137 Pine Street Middleborough MA 02346 / US | [2019/14] |
| Former [2018/50] | For all designated states Warren Environmental, Inc. P.O. Box 1206 Carver MA 02330 / US | ||
| Former [2016/15] | For all designated states Warren, Daniel 17 Shaw Road Carver, MA 02330 / US | Inventor(s) | 01 /
Warren, Daniel P.O. Box 1206 Carver MA 02330 / US | [2020/13] |
| Former [2016/15] | 01 /
see applicant ... | Representative(s) | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | [N/P] |
| Former [2020/35] | EIP EIP Europe LLP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | ||
| Former [2016/15] | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | Application number, filing date | 14807506.2 | 05.06.2014 | [2016/15] | WO2014US41005 | Priority number, date | US201361832433P | 07.06.2013 Original published format: US 201361832433 P | [2016/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014197654 | Date: | 11.12.2014 | Language: | EN | [2014/50] | Type: | A2 Application without search report | No.: | EP3003574 | Date: | 13.04.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.12.2014 takes the place of the publication of the European patent application. | [2016/15] | Type: | B1 Patent specification | No.: | EP3003574 | Date: | 26.08.2020 | Language: | EN | [2020/35] | Search report(s) | International search report - published on: | US | 05.03.2015 | (Supplementary) European search report - dispatched on: | EP | 02.01.2017 | Classification | IPC: | F16L55/165, F16L55/18, B29C63/36, B32B1/08, B32B5/02 | [2017/04] | CPC: |
F16L55/1651 (EP,US);
B29C63/36 (EP,US);
B32B1/08 (EP,US);
B32B5/022 (EP,US);
F16L55/1654 (US);
F16L55/18 (EP,US);
B32B2255/26 (EP,US);
B32B2260/021 (EP,US);
B32B2260/046 (EP,US);
|
| Former IPC [2016/15] | B05B13/06, B29C63/36, F16L55/162 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR INSTALLATION EINER ROHRAUSKLEIDUNG | [2020/13] | English: | METHOD FOR INSTALLING A PIPE LINER | [2020/13] | French: | MÉTHODE D'INSTALLATION D'UN REVÊTEMENT DE TUYAU | [2020/13] |
| Former [2016/15] | DRUCKINFUSIONSAUSKLEIDUNGSSYSTEM | ||
| Former [2016/15] | PRESSURE INFUSION LINING SYSTEM | ||
| Former [2016/15] | SYSTÈME DE REVÊTEMENT DE PERFUSION SOUS PRESSION | Entry into regional phase | 26.11.2015 | National basic fee paid | 26.11.2015 | Search fee paid | 26.11.2015 | Designation fee(s) paid | 26.11.2015 | Examination fee paid | Examination procedure | 26.11.2015 | Examination requested [2016/15] | 31.07.2017 | Amendment by applicant (claims and/or description) | 12.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 10.09.2018 | Reply to a communication from the examining division | 04.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.01.2019 | Reply to a communication from the examining division | 06.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 04.10.2019 | Reply to a communication from the examining division | 04.03.2020 | Communication of intention to grant the patent | 13.07.2020 | Fee for grant paid | 13.07.2020 | Fee for publishing/printing paid | 13.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP17193083.7 / EP3296608 | Opposition(s) | 27.05.2021 | No opposition filed within time limit [2021/31] | Fees paid | Renewal fee | 27.06.2016 | Renewal fee patent year 03 | 27.06.2017 | Renewal fee patent year 04 | 27.06.2018 | Renewal fee patent year 05 | 27.06.2019 | Renewal fee patent year 06 | 29.06.2020 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.06.2014 | AL | 26.08.2020 | AT | 26.08.2020 | CY | 26.08.2020 | CZ | 26.08.2020 | DK | 26.08.2020 | EE | 26.08.2020 | FI | 26.08.2020 | HR | 26.08.2020 | LT | 26.08.2020 | LV | 26.08.2020 | MC | 26.08.2020 | MK | 26.08.2020 | MT | 26.08.2020 | NL | 26.08.2020 | PL | 26.08.2020 | RO | 26.08.2020 | RS | 26.08.2020 | SE | 26.08.2020 | SI | 26.08.2020 | SK | 26.08.2020 | SM | 26.08.2020 | TR | 26.08.2020 | BG | 26.11.2020 | NO | 26.11.2020 | GR | 27.11.2020 | IS | 26.12.2020 | PT | 28.12.2020 | [2024/41] |
| Former [2024/29] | HU | 05.06.2014 | |
| AL | 26.08.2020 | ||
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| MK | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| TR | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2024/22] | HU | 05.06.2014 | |
| AL | 26.08.2020 | ||
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| MK | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2023/30] | HU | 05.06.2014 | |
| AL | 26.08.2020 | ||
| AT | 26.08.2020 | ||
| CY | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2023/29] | HU | 05.06.2014 | |
| AL | 26.08.2020 | ||
| AT | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2022/08] | AL | 26.08.2020 | |
| AT | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| MC | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/36] | AL | 26.08.2020 | |
| AT | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SI | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/28] | AL | 26.08.2020 | |
| AT | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SK | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/25] | AL | 26.08.2020 | |
| AT | 26.08.2020 | ||
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/24] | AT | 26.08.2020 | |
| CZ | 26.08.2020 | ||
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/23] | CZ | 26.08.2020 | |
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| SM | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/22] | CZ | 26.08.2020 | |
| DK | 26.08.2020 | ||
| EE | 26.08.2020 | ||
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RO | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/20] | DK | 26.08.2020 | |
| FI | 26.08.2020 | ||
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/12] | FI | 26.08.2020 | |
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| NL | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/10] | FI | 26.08.2020 | |
| HR | 26.08.2020 | ||
| LT | 26.08.2020 | ||
| LV | 26.08.2020 | ||
| PL | 26.08.2020 | ||
| RS | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| IS | 26.12.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/09] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| GR | 27.11.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/08] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| SE | 26.08.2020 | ||
| BG | 26.11.2020 | ||
| NO | 26.11.2020 | ||
| PT | 28.12.2020 | ||
| Former [2021/07] | FI | 26.08.2020 | |
| LT | 26.08.2020 | ||
| NO | 26.11.2020 | Documents cited: | Search | [XI] US2006254711 (SCHWERT SIEGFRIED et al.) [X] 1-3,7-10 * paragraphs [0026] - [0030] * * paragraphs [0047] - [0049] *[I] 4-6,11,12 | [AD] US4714095 (MUELLER HANS et al.) [AD] 4 * abstract * | [A] US2011297243 (KIEST JR LARRY W et al.) [A] 6,12 * abstract * * paragraphs [0030] - [0031] * | International search | [X] US2010295198 (KIEST JR LARRY W et al.) [X] | [Y] US2012193011 (D HULSTER GERALD SCOTT et al.) [Y] | [Y] US4448742 (KROMREY ROBERT V et al.) [Y] | [A] WO2008089167 (LUBRIZOL ADVANCED MAT INC et al.) [A] | [A] US2013098535 (KIEST JR LARRY W et al.) [A] | Examination | US2010295198 | US6050300 |