EP3077678 - SUCTION PULSER INTENDED FOR A HEATING, VENTILATION AND/OR AIR-CONDITIONING DEVICE OF A MOTOR VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 13.04.2020 | ||
Former | Examination is in progress Status updated on 02.07.2019 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Valeo Systemes Thermiques 8 rue Louis Lormand La Verrière 78320 Le Mesnil Saint Denis / FR | [2016/41] | Inventor(s) | 01 /
VINCENT, Philippe 4 impasse des Lilas Blancs 85800 Givrand / FR | [2020/36] |
Former [2016/41] | 01 /
VINCENT, Philippe 4 impasse des Lilas Blancs F-85800 Givrand / FR | Representative(s) | Tran, Chi-Hai, et al Valeo Systèmes Thermiques BG THS - Service Propriété Industrielle THS ZA L' Agiot, 8 rue Louis Lormand CS 80517 La Verrière 78322 Le Mesnil Saint Denis Cedex / FR | [2020/36] |
Former [2016/41] | Metz, Gaëlle Valeo Systemes Thermiques Propriété Industrielle 8, rue Louis Lormand La Verrière 78320 Le Mesnil Saint-Denis / FR | Application number, filing date | 14808577.2 | 02.12.2014 | [2016/41] | WO2014EP76177 | Priority number, date | FR20130062058 | 04.12.2013 Original published format: FR 1362058 | [2016/41] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015082436 | Date: | 11.06.2015 | Language: | FR | [2015/23] | Type: | A1 Application with search report | No.: | EP3077678 | Date: | 12.10.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 11.06.2015 takes the place of the publication of the European patent application. | [2016/41] | Type: | B1 Patent specification | No.: | EP3077678 | Date: | 02.09.2020 | Language: | FR | [2020/36] | Search report(s) | International search report - published on: | EP | 11.06.2015 | Classification | IPC: | F04D17/16, F04D29/28, F04D29/42 | [2016/41] | CPC: |
F04D17/162 (EP,US);
B60H1/00849 (US);
B60H1/00028 (US);
B60H1/00428 (US);
F04D25/06 (US);
F04D27/002 (EP,US);
F04D29/281 (US);
F04D29/283 (EP,US);
F04D29/4206 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SAUGIMPULSGEBER FÜR HEIZUNGS-, KLIMA- UND LÜFTUNGSTECHNISCHE VORRICHTUNG EINES KRAFTFAHRZEUGS | [2016/41] | English: | SUCTION PULSER INTENDED FOR A HEATING, VENTILATION AND/OR AIR-CONDITIONING DEVICE OF A MOTOR VEHICLE | [2016/41] | French: | PULSEUR D'ASPIRATION DESTINÉ À UN DISPOSITIF DE CHAUFFAGE, VENTILATION ET/OU CLIMATISATION D'UN VEHICULE AUTOMOBILE | [2016/41] | Entry into regional phase | 03.06.2016 | National basic fee paid | 03.06.2016 | Designation fee(s) paid | 03.06.2016 | Examination fee paid | Examination procedure | 03.06.2016 | Examination requested [2016/41] | 01.02.2017 | Amendment by applicant (claims and/or description) | 05.07.2019 | Despatch of a communication from the examining division (Time limit: M06) | 13.01.2020 | Reply to a communication from the examining division | 14.04.2020 | Communication of intention to grant the patent | 28.07.2020 | Fee for grant paid | 28.07.2020 | Fee for publishing/printing paid | 28.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 30.11.2016 | Renewal fee patent year 03 | 29.11.2017 | Renewal fee patent year 04 | 29.11.2018 | Renewal fee patent year 05 | 29.11.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.12.2014 | AL | 02.09.2020 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | MT | 02.09.2020 | NL | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | TR | 02.09.2020 | BG | 02.12.2020 | GB | 02.12.2020 | IE | 02.12.2020 | LU | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | [2022/34] |
Former [2022/32] | HU | 02.12.2014 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
MT | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/27] | HU | 02.12.2014 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MT | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/23] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/10] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/52] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/49] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GB | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/47] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/46] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
IE | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/40] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/24] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/23] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/18] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Cited in | International search | [A]JPH0924722 (NIPPON DENSO CO) [A] 1 * abstract *; | [A]US2007116559 (HIGASHIDA MASAHITO [JP]) [A] 1* abstract *; | [A]EP1980432 (HALLA CLIMATE CONTROL CORP [KR]) [A] 1 * paragraph [0001]; figure 7 *; | [XAI]US2012207593 (OCHIAI TOSHINORI [JP]) [X] 1,4-6 * paragraphs [0012] , [0032]; figure 1 * [A] 2,3,7,9,10 [I] 8 |