Extract from the Register of European Patents

EP About this file: EP3077679

EP3077679 - PLASTIC PUMP CASING MADE OF AN INNER SHELL AND AN OUTER SHELL, WITH FILLING MATERIAL IN BETWEEN [Right-click to bookmark this link]
Former [2016/41]PLASTIC PUMP HOUSING CONSISTING OF AN INNER CASING, AN OUTER CASING AND FILLING MATERIAL THEREBETWEEN
[2019/41]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 09.04.2026
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  16.09.2019
FormerExamination is in progress
Status updated on  15.04.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
KSB SE & Co. KGaA
Johann-Klein-Straße 9
67227 Frankenthal / DE
[2018/09]
Former [2016/41]For all designated states
KSB Aktiengesellschaft
Johann-Klein-Strasse 9
67227 Frankenthal / DE
Inventor(s)01 / BÖHM, Alexander
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
02 / GAISER, Armin
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
03 / KILIAN, Sven
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
04 / KÖFLER, Karl-Heinz
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
05 / PÜTTERICH, Alexander
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
06 / BERND, Schramm
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
07 / SEEMANN, Andrea
c/o KSB Aktiengesellschaft
Johann-Klein-Straße 9
67227 Frankenthal / DE
08 / STEFFENS, Markus
c/o ADETE Adv. Engineering & Techn. GmbH
Opelstraße 10
67661 Kaiserslautern / DE
09 / ANNA, Frank
c/o ADETE Adv. Engineering & Techn. GmbH
Opelstraße 10
67661 Kaiserslautern / DE
 [2016/41]
Application number, filing date14808615.005.12.2014
[2016/41]
WO2014EP76706
Priority number, dateDE20131022506506.12.2013         Original published format: DE102013225065
[2016/41]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015082679
Date:11.06.2015
Language:DE
[2015/23]
Type: A1 Application with search report 
No.:EP3077679
Date:12.10.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 11.06.2015 takes the place of the publication of the European patent application.
[2016/41]
Type: B1 Patent specification 
No.:EP3077679
Date:26.02.2020
Language:DE
[2020/09]
Search report(s)International search report - published on:EP11.06.2015
ClassificationIPC:F04D29/02, F04D29/42, F04D1/06
[2016/41]
CPC:
F04D29/426 (EP,IL,US); F04D1/063 (EP,IL,US); F04D29/026 (EP,IL,US);
F04D29/4286 (IL,US); F04D29/5893 (IL,US); F05B2230/60 (EP,IL,US);
F05B2240/14 (EP,IL,US); F05B2280/4003 (EP,IL,US); F05B2280/4011 (EP,IL,US);
F05B2280/6003 (EP,IL,US); F05B2280/6012 (EP,IL,US); F05D2300/43 (EP,IL,US);
F05D2300/603 (EP,IL,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/41]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:KUNSTSTOFF-PUMPENGEHÄUSE, DAS AUS EINER INNENSCHALE UND EINER AUSSENSCHALE BESTEHT, MIT FÜLLMATERIAL DAZWISCHEN[2016/41]
English:PLASTIC PUMP CASING MADE OF AN INNER SHELL AND AN OUTER SHELL, WITH FILLING MATERIAL IN BETWEEN[2019/41]
French:CARTER DE POMPE EN PLASTIQUE FAIT D'UNE COQUILLE INTÉRIEURE ET D'UNE COQUILLE EXTÉRIEURE, AVEC UN MATÉRIAU DE REMPLISSAGE ENTRE LES DEUX[2019/41]
Former [2016/41]PLASTIC PUMP HOUSING CONSISTING OF AN INNER CASING, AN OUTER CASING AND FILLING MATERIAL THEREBETWEEN
Former [2016/41]CARTER DE POMPE EN MATIÈRE PLASTIQUE POSSÉDANT UNE COQUE INTÉRIEURE, UNE COQUE EXTÉRIEURE ET UNE MATIÈRE DE REMPLISSAGE ENTRE CELLES-CI
Entry into regional phase13.05.2016National basic fee paid 
13.05.2016Designation fee(s) paid 
13.05.2016Examination fee paid 
Examination procedure13.05.2016Examination requested  [2016/41]
19.12.2016Amendment by applicant (claims and/or description)
18.04.2019Despatch of a communication from the examining division (Time limit: M04)
16.07.2019Reply to a communication from the examining division
17.09.2019Communication of intention to grant the patent
16.01.2020Fee for grant paid
16.01.2020Fee for publishing/printing paid
16.01.2020Receipt of the translation of the claim(s)
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
22.12.2016Renewal fee patent year 03
19.12.2017Renewal fee patent year 04
21.12.2018Renewal fee patent year 05
20.12.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.12.2014
AL26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
[2022/31]
Former [2022/30]HU05.12.2014
AL26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2022/27]HU05.12.2014
CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/40]CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/10]CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/48]ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/47]ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/45]FI26.02.2020
HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/40]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/39]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
Former [2020/38]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
GR27.05.2020
Former [2020/37]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
Former [2020/35]FI26.02.2020
NO26.05.2020
Cited inInternational search[XYI] EP2236839  (GRUNDFOS MANAGEMENT AS et al.)
 [Y] EP1203887  (WILO GMBH et al.)
 [YA] DE19953911  (BRINKMANN PUMPEN K H BRINKMANN et al.)
 [X] EP1647718  (WILO AG et al.)
 [XYI] US4923367  (ZIMMER JOHN E et al.) [X] 1-3,5,6,8-11,13,14,16 * paragraphs [0007] , [0009] - [0012] - [0014] - [0016]; figures 2,3 *[Y] 7,12 [I] 4,15,17
ExaminationEP1972788
 US3876327
by applicantEP0206031
 EP1972788
 EP0797737
 DE1096753
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.