EP3017353 - METHOD AND APPARATUS FOR SWITCHING DIGITIZER MODE [Right-click to bookmark this link] | |||
Former [2016/19] | METHOD FOR SWITCHING DIGITIZER MODE | ||
[2021/47] | Status | No opposition filed within time limit Status updated on 06.01.2023 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 28.01.2022 | ||
Former | Grant of patent is intended Status updated on 03.11.2021 | ||
Former | Examination is in progress Status updated on 22.06.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2022/09] |
Former [2016/19] | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | Inventor(s) | 01 /
LEE, Joo-Hoon 511-1001 Samsung 5-cha Apt. 90 Jinsan-ro Suji-gu Yongin-si Gyeonggi-do 448-785 / KR | 02 /
PARK, Sung-Ha 101 176-1 Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 443-803 / KR | 03 /
JEONG, Jin-Hong 502-1601 Hyundai Home Town 3-cha 2-danji Apt. 60 Daeji-ro 15beon-gil Suji-gu Yongin-si Gyeonggi-do 448-544 / KR | [2016/19] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [2022/09] |
Former [2016/19] | Birchenough, Lewis HGF Limited Saviour House 9 St Saviourgate York YO1 8NQ / GB | Application number, filing date | 14820091.8 | 01.07.2014 | [2016/19] | WO2014KR05861 | Priority number, date | KR20130076743 | 01.07.2013 Original published format: KR 20130076743 | [2016/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015002440 | Date: | 08.01.2015 | Language: | EN | [2015/01] | Type: | A1 Application with search report | No.: | EP3017353 | Date: | 11.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.01.2015 takes the place of the publication of the European patent application. | [2016/19] | Type: | B1 Patent specification | No.: | EP3017353 | Date: | 02.03.2022 | Language: | EN | [2022/09] | Search report(s) | International search report - published on: | KR | 08.01.2015 | (Supplementary) European search report - dispatched on: | EP | 09.06.2017 | Classification | IPC: | G06F3/041, G06F9/44, G06F3/038, G06F3/044, G06F3/046, G06F3/0354 | [2017/08] | CPC: |
G06F3/03545 (EP,CN,KR,US);
G06F3/0416 (EP,CN,KR,US);
G06F3/0383 (EP,CN,US);
G06F3/0412 (KR);
G06F3/044 (CN,KR);
G06F3/0442 (EP,US);
|
Former IPC [2016/19] | G06F3/041, G06F9/44 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUM UMSCHALTEN DES MODUS EINER DIGITALISIERERVORRICHTUNG | [2021/47] | English: | METHOD AND APPARATUS FOR SWITCHING DIGITIZER MODE | [2021/47] | French: | APPAREIL ET PROCÉDÉ POUR CHANGEMENT DU MODE D'UN NUMÉRISEUR | [2021/47] |
Former [2016/19] | VERFAHREN ZUM UMSCHALTEN DES MODUS EINER DIGITALISIERERVORRICHTUNG | ||
Former [2016/19] | METHOD FOR SWITCHING DIGITIZER MODE | ||
Former [2016/19] | PROCÉDÉ DE CHANGEMENT DE MODE D'UN NUMÉRISEUR | Entry into regional phase | 09.12.2015 | National basic fee paid | 09.12.2015 | Search fee paid | 09.12.2015 | Designation fee(s) paid | 09.12.2015 | Examination fee paid | Examination procedure | 09.12.2015 | Examination requested [2016/19] | 02.11.2017 | Amendment by applicant (claims and/or description) | 22.06.2018 | Despatch of a communication from the examining division (Time limit: M02) | 29.08.2018 | Reply to a communication from the examining division | 01.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 29.07.2019 | Reply to a communication from the examining division | 07.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 02.01.2021 | Reply to a communication from the examining division | 04.11.2021 | Communication of intention to grant the patent | 18.01.2022 | Fee for grant paid | 18.01.2022 | Fee for publishing/printing paid | 18.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 05.12.2022 | No opposition filed within time limit [2023/06] | Fees paid | Renewal fee | 22.06.2016 | Renewal fee patent year 03 | 23.06.2017 | Renewal fee patent year 04 | 25.07.2018 | Renewal fee patent year 05 | 24.07.2019 | Renewal fee patent year 06 | 23.07.2020 | Renewal fee patent year 07 | 22.07.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.07.2014 | AL | 02.03.2022 | AT | 02.03.2022 | CY | 02.03.2022 | CZ | 02.03.2022 | DK | 02.03.2022 | EE | 02.03.2022 | ES | 02.03.2022 | FI | 02.03.2022 | HR | 02.03.2022 | IT | 02.03.2022 | LT | 02.03.2022 | LV | 02.03.2022 | MC | 02.03.2022 | MK | 02.03.2022 | NL | 02.03.2022 | PL | 02.03.2022 | RO | 02.03.2022 | RS | 02.03.2022 | SE | 02.03.2022 | SI | 02.03.2022 | SK | 02.03.2022 | SM | 02.03.2022 | BG | 02.06.2022 | NO | 02.06.2022 | GR | 03.06.2022 | GB | 01.07.2022 | IE | 01.07.2022 | LU | 01.07.2022 | IS | 02.07.2022 | PT | 04.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | FR | 31.07.2022 | LI | 31.07.2022 | [2024/22] |
Former [2024/20] | HU | 01.07.2014 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
GB | 01.07.2022 | ||
IE | 01.07.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/18] | HU | 01.07.2014 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
GB | 01.07.2022 | ||
IE | 01.07.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/35] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
GB | 01.07.2022 | ||
IE | 01.07.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
GB | 01.07.2022 | ||
IE | 01.07.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/27] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
GB | 01.07.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/22] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
LU | 01.07.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/10] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/07] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/01] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/51] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/49] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/48] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/47] | AT | 02.03.2022 | |
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/44] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/39] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/36] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/35] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
Former [2022/34] | ES | 02.03.2022 | |
LT | 02.03.2022 | ||
NO | 02.06.2022 | ||
Former [2022/33] | LT | 02.03.2022 | |
NO | 02.06.2022 | Documents cited: | Search | [XA]US2007085836 (ELY DAVID [GB]) [X] 1,10,12 * paragraph [0006] * * paragraph [0047] * * paragraph [0129] * * paragraph [0048] * * paragraph [0105] - paragraph [0108] * * paragraph [0110] - paragraph [0115] * * paragraph [0119] - paragraph [0122] * [A] 2-9,11,13-15; | [XA]US7612767 (GRIFFIN PAUL [US], et al) [X] 1,7,12,13 * column 2, line 31 - column 2, line 52; figures 1-3,5 * * column 3, line 17 - column 3, line 38 * * column 4, line 13 - column 4, line 64 * * column 5, line 1 - column 7, line 47 * [A] 2-6,8-11,15; | [XA]US2010252335 (ORSLEY TIMOTHY JAMES [US]) [X] 1,11,12 * paragraph [0045] * * paragraph [0043] - paragraph [0044] * * paragraph [0029] * * paragraph [0015] * * paragraph [0012] * * paragraph [0004] * * paragraph [0013] * * paragraph [0044] * [A] 2-10,13-15; | [X]KR20120056465 (SAMSUNG ELECTRO MECH [KR]) [X] 1,8,9,12 * paragraph [0009] - paragraph [0010] * * paragraph [0025] - paragraph [0028] ** paragraph [0031] - paragraph [0034] *; | [XA]EP2568359 (TPK TOUCH SOLUTIONS INC [TW]) [X] 1-3,6,12,14,15 * paragraph [0042] * [A] 4,5,7-11,13 | International search | [A]EP0306063 (LAITRAM CORP [US]); | [A]EP0911720 (HEWLETT PACKARD CO [US]); | [A]US2006123354 (VOLOVITZ ODED [IL]); | [A]US2008088487 (LI DONG [US]); | [A]US2012262418 (LEE SUNG HO [KR]) |